ECB violations
213 21 Street, Brooklyn • Block 00640 • Lot 0051
5 records
Environmental Control Board violations, which carry a hearing and a penalty.
| Issued | Violation | Status | Severity | Description | Penalty | Balance due | Hearing |
|---|---|---|---|---|---|---|---|
| Dec 29, 2025 | 39548532H | RESOLVE | CLASS - 1 | AT TIME OF INSPECTION, A PSWO WAS ALREADY IN PLACE TO STOP ALL EXTERIOR WORK (PSWO COMPLAINT #3A20700). DESPITE THIS,... | $10,000 | $10,000 | Jan 21, 2027 |
| Dec 17, 2025 | 35718019K | RESOLVE | CLASS - 1 | FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMPORARY CONSTRUCTION-NO GUARD RAILS. AS NOTED AT TIME OF... | $5,000 | $5,000 | Jan 21, 2027 |
| Jul 14, 2025 | 39542340X | RESOLVE | CLASS - 2 | AT THE TIME OF INSPECTION, OBSERVED A FOUR-STORY BUILDING WITH A SIDEWALK SHED AT EXPOSURE #1 MISSING THE REQUIRED 5-... | $2,430 | $2,430 | Sep 4, 2026 |
| Jul 14, 2025 | 39542341H | RESOLVE | CLASS - 1 | 3307.7 - AT THE TIME OF INSPECTION, OBSERVED SIDEWALK SHED AND CONSTRUCTION FENCE IN PLACE; HOWEVER, REQUIRED NETTING... | $5,030 | $5,030 | Sep 4, 2026 |
| Feb 6, 2025 | 39536727J | RESOLVE | CLASS - 2 | AT TIME OF INSPECTION OBSERVED TEMPORARY CONSTRUCTION FENCE IN PLACE AT EXPOSURE #1 WITH EXPIRED PERMIT SINCE 10/31/2... | $1,250 | $1,250 | Feb 12, 2026 |