122 31 Street, Brooklyn
Brooklyn • Block 00676 • Lot 0011 • Zip: 11232
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 3 days ago- Downtown Brooklyn 28 min 6 walking, 22 riding
- Fulton Street 38 min 6 walking, 32 riding
- Union Square 39 min 6 walking, 33 riding
- Times Square 44 min 6 walking, 38 riding
- Grand Central 49 min 6 walking, 43 riding
- Penn Station 49 min 6 walking, 43 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Subway
Railroad
Ferry
Bus
Citi Bike
Places nearby
Don Pepe Tortas Y Jugos
No description yet
Tacos El Bronco Cart
No description yet
Japan Village
No description yet
Bangkok B.A.R.
No description yet
Brooklyn Kura
No description yet
Confidant
No description yet
Ejen Korean Comfort Food
No description yet
Ends Meat
No description yet
Activity
Sales, filings, permits and violations from every dataset, in one order.
2025
-
HPD violation Apr 28, 2025
Class B
§ 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF LOCKABLE KNOB AT DOOR PREVENTING ENTRANCE TO FIRE E...
-
HPD violation Apr 28, 2025
Class B
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE INOPERABLE INTERCOM SYSTEM AT BUILDING ENTRANCE TO ...
-
CLASS - 1
ATOI OBSERVED OPEN ELECTRIC SERVICE BOX, MULTIPLE OPEN SPLICE BOXES, WIRES HANGING LOOSE ALL IN THE BASEMENT., REPAIR...
-
CLASS - 1
FULL GUT DEMOLITION, FIRE STOPPING REMOVED TO THE ADJACENT APARTMENT 1F AND BASEMENT., OBTAIN PERMIT
-
CLASS - 1
OBSERVED BX CABLE WIRES HANGING THROUGH OUT THE WHOLE APARTMENT, NEW CEILING IN WALL BOXES., OBTAIN PERMIT
-
CLASS - 1
OBSERVED NEW FIXTURES TO BATHROOM SHOWER BODY, GAS LINE OPEN AND DRAIN LINE REPLACEMENT., OBTAIN ALL REQUIRED PERMITS
-
CLASS - 1
ATOI OBSERVED NEW CONST SUBFLOORS BEING INSTALLED, WALL STUDS AND FLOOR JOIST BLOCKING, OBTAIN PERMIT
-
CLASS - 1
AT TIME OF INSPECTION OBSERVED ACTIVE ONGOING FACADE REPAIR WORK WHERE DEBRIS FALLING ONTO TO PEDESTRIAN SIDEWALK AND...
-
DOB violation Mar 14, 2025
IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL
INSTALL APPROXIMATELY 20 FEET OF SIDEWALK SHED ACROSS THE ENTIRE FRONT (EXPOSURE 1), AND APPROXIMATELY 15 FEET DOWN W...
2024
-
HPD violation Oct 28, 2024
Class C
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CL...
-
HPD violation Oct 25, 2024
Class C
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CL...
-
HPD violation Sep 16, 2024
Class A
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT WEST WALL ABOVE ...
-
HPD violation Sep 16, 2024
Class A
§ 27-2005 HMC: REFIT WOOD DOOR IN THE ENTRANCE IN THE 1st ROOM FROM EAST LOCATED AT APT 1F, 1st STORY, 1st APARTMENT...
2021
-
DOB violation Apr 28, 2021
AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2012
-
Alteration Type II
REPLACE BOILER AND OIL BURNER WITH BOILER AND GAS BURNER (NYC BOILER NO: 150889-01). NO CHANGE IN USE, EGRESS, OR OCC...
2011
-
Alteration Type III
REPLACE PARAPET WALL & REPAIR CRACKS AT FRONT OF BUILDING AS SHOWN ON PLANS. SIDEWALK SHED UNDER SEPARATE APPLICA...
-
Alteration Type III
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FILED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY...
2009
-
DOB violation Dec 31, 2009
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
-
DOB violation Aug 22, 2009
C-CONSTRUCTION OTHER OPTIONAL
BORO. COMMISSIONER 15 DAY LETTER, BOROUGH COMMISSIONER HAS ISSUED A 15 DAY LETTER OF INTENT TO REVOKE APPL#302388459 ...
-
DOB violation Jun 26, 2009
C-CONSTRUCTION OTHER OPTIONAL
-
Alteration Type III
STRUCTURE FOR GROUND SIGN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2006
1995
-
DOB violation Aug 29, 1995
LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Registration Contracts
Contact information from multiple dwelling registrations
Building Permits
Owner information from Department of Buildings filings
Recent Building Permits
Owner information from recent DOB NOW filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records