Industry City Building 9, Brooklyn
Brooklyn • Block 00679 • Lot 0001 • Zip: 11232
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 3 days ago- Downtown Brooklyn 28 min 6 walking, 22 riding
- Fulton Street 38 min 6 walking, 32 riding
- Union Square 39 min 6 walking, 33 riding
- Times Square 44 min 6 walking, 38 riding
- Grand Central 49 min 6 walking, 43 riding
- Penn Station 49 min 6 walking, 43 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Subway
Railroad
Ferry
Bus
Citi Bike
Places nearby
Don Pepe Tortas Y Jugos
No description yet
Tacos El Bronco Cart
No description yet
Japan Village
No description yet
Bangkok B.A.R.
No description yet
Brooklyn Kura
No description yet
Confidant
No description yet
Ejen Korean Comfort Food
No description yet
Ends Meat
No description yet
Activity
Sales, filings, permits and violations from every dataset, in one order.
2026
-
Subdivision Improved
FILING FOR EXISTING LOT 1 WITH 2 EXISTING BUILDINGS TO BE SUBDIVIDED INTO LOT 1 AND LOT 2 (LOT 1 ADDRESS 882 THIRD AV...
2025
-
DOB violation Nov 14, 2025
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
-
DOB violation Nov 14, 2025
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
-
CLASS - 1
FAILURE TO MAINTAIN BUILDING IN A CODE-COMPLIANT MANNER. AT TIME OF INSPECTION, SEVERAL STEP DOWN CRACK WERE OBSERVED...
-
CLASS - 1
FAILURE TO MAINTAIN THE FACADE OF THE BUILDING. AT TIME OF INSPECTION, SEVERAL STEP DOWN CRACKS WERE OBSERVED, WHICH ...
-
DOB violation May 5, 2025
C-CONSTRUCTION OTHER OPTIONAL
ENGINEER'S REPORT REQUESTED DUE TO THE FACADE BEING IN A STATE OF DISREPAIR. SEVERAL STEP DOWN CRACKS WERE OBSERVED, ...
2024
-
DOB violation Sep 23, 2024
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION
-
DOB violation Sep 23, 2024
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION
2023
-
CLASS - 2
DEFECTIVE PHONE. SEAL HOIST MACHINE LEAKS. MAIN LINE CAN BE OPENED WHEN POWER ON.
-
CLASS - 2
DEFECTIVE PHONE. SEAL HOIST MACHINE LEAKS. MAIN LINE CAN BE OPENED WHEN POWER ON.
-
DOB violation Jun 30, 2023
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION
-
Alteration Type II
ADDITIONS/MODIFICATIONS TO EXISTING FIRE ALARM SYSTEM INCLUDING THE ADDITION OF A NEW POST-FIRE SMOKE PURGE SYSTEM PR...
2022
-
Alteration Type II
MECHANICAL AND PLUMBING WORK AS PER PLANS FILED HEREWITH.
-
Alteration Type II
HEREWITH FILING MODIFICATIONS TO THE EXISTING FIRE ALARM SYSTEM ON 1ST & 2ND FLOORS AS PER PLANS. NO CHANGE TO US...
2021
-
Alteration Type II
INTERIOR RENOVATION,PARTITION AND CEILING WORK AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCU...
-
Alteration Type II
THIS APPLICATION IS TO RECORD THE METES AND BOUNDS OF THE SUBJECT LOT AND PROPOSE NO CHANGES. NO CONSTRUCTION WORK PR...
2020
2019
2013
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Building Permits
Owner information from Department of Buildings filings
Recent Building Permits
Owner information from recent DOB NOW filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records