273-283 46 Street, Brooklyn
Brooklyn • Block 00745 • Lot 0051 • Zip: 11220
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 3 days ago- Downtown Brooklyn 28 min 6 walking, 22 riding
- Fulton Street 38 min 6 walking, 32 riding
- Union Square 39 min 6 walking, 33 riding
- Times Square 44 min 6 walking, 38 riding
- Grand Central 49 min 6 walking, 43 riding
- Penn Station 49 min 6 walking, 43 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Subway
Ferry
Bus
Citi Bike
Places nearby
Judy’s
No description yet
Don Pepe Tortas Y Jugos
No description yet
Tacos El Bronco
Tacos El Bronco offers authentic Mexican street tacos in a casual and lively atmosphere. Located in Brooklyn, NY, the...
Baba’s Pierogies
No description yet
King of Meat
No description yet
Yafa Cafe
Yafa Cafe is a cozy Middle Eastern restaurant in Brooklyn offering authentic dishes like falafel, shawarma, and hummu...
El Rey Del Pescado
No description yet
Bangkok B.A.R.
No description yet
Activity
Sales, filings, permits and violations from every dataset, in one order.
2026
-
HPD violation Apr 30, 2026
Class A
§27-2104(B) HMC POST A PROPER NOTICE REGARDING RENT STABILIZATION LAW, IN A FORM APPROVED BY THE COMMISSIONER, IN A C...
-
HPD violation Apr 30, 2026
Class B
28 RCNY § 25-171; & 67 (7)(B) MDL; NYC FIRE CODE § 703.1.3; NYC FIRE CODE § 703.2: ADJUST DOOR TO PREVENT GAPS BETWEE...
-
HPD violation Apr 30, 2026
Class C
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CL...
2024
-
HPD violation Apr 3, 2024
Class A
(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION ...
2023
-
HPD violation Nov 21, 2023
Class I
§27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27...
-
HPD violation Mar 17, 2023
Class A
(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION ...
2018
-
Alteration Type II
INSTALL NEW GAS METER AND NEW GAS PIPPING AS PER PLANS.
2016
2015
2014
2009
-
DOB violation Jan 1, 2009
LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
2008
-
DOB violation Jan 3, 2008
LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
-
DOB violation Jan 3, 2008
LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
-
DOB violation Jan 3, 2008
LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
-
DOB violation Jan 3, 2008
LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
-
DOB violation Jan 3, 2008
LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
2007
-
Alteration Type II
REPLACE BOILERS & HOT WATERHEATERS. NO CHANGE TO USE,EGRESS OR OCCUPANCY
-
Alteration Type II
INSTALATION OF A LAUNDROMAT, NO CHANGE IN USE, OR OCCUPANCY IS INVOLVED UNDER THIS APPLICATION.
-
Hazardous
B4B,BQ9,36,4B,50ABCDEF.50A,BQ9-NO WORK W/O PERMIT FILED W/DOB FOR THE INSTALLATION OF THE BOILER.50B-HOLES IN BOILER ...
-
Hazardous
B4B,,BQ9,36,4B,50A,B,C,D,E,F.50A-BQ9 NO WORK PERMIT FILED W/DOB FOR THE INSTALLATION OF THE BOILER.50B-HOLES IN BOILE...
-
Hazardous
B4B,BQ9,36,4B,50ABCDEF.50A,BQ9-NO WORK W/O PERMIT FILED W/ DOB FOR THEINSTALLATION OF THE BOILER.50B-HOLES IN BOILER ...
-
Hazardous
B4B,BQ9,4B,36,50ABCDE.50A-BQ9 NO WORK PERMIT FILED W/ DOB FOR THE INSTALLATION OF THE BOILER.50B-HOLES IN BOILER ROOM...
-
Hazardous
B4B,BQ9,36,4B,50A-F.50A-BQ9 NO WORK PERMIT FILED W/ DOB FOR THE INSTALLATION OF THE BOILER.50B-HOLES IN BOILER ROOM W...
-
Hazardous
B4B,4A,19B,BQ9,36,50A-F.50A-PIPE SAFETY OR RELIEF VALVE DISCHARGE DOWNTO THREADED.50B-CHECK VALVE FLOW PREVENTOR MISS...
2006
2005
2001
-
Alteration Type II
RENOVATE EXISTING BUILDING. WORK INCLUDES PLUMBING,ELECTRICAL AND GENERAL CONSTRUCTION . THERE WILL BE NO CHANGE IN U...
2000
-
Alteration Type I
RENOVATE EXISTING BUILDING TO REMOVE ' UB48-87'. WORK INCLUDES PLUMBING, ELECTRICAL, AND GENERAL CONSTRUCTION. A NEW ...
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Registration Contracts
Contact information from multiple dwelling registrations
Building Permits
Owner information from Department of Buildings filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records