Maintenance code violations
473-483 50 Street, Brooklyn • Block 00783 • Lot 0045
22 records
HPD grades a violation A for non-hazardous through C for immediately hazardous.
| Issued | Class | Status | Violation | Apartment | Correct by |
|---|---|---|---|---|---|
| Aug 4, 2026 | B | NOV SENT OUT | § 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF BICYCLE AT PUBLIC HALL, 1st STORY | — | Sep 8, 2026 |
| Jul 24, 2026 | A | NOV SENT OUT | § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING R... | — | Oct 27, 2026 |
| Jul 24, 2026 | A | NOV SENT OUT | § 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE VISIBLE MOLD AT CAULKING, GROUTS JOINTS OF THE ... | 3B | Oct 27, 2026 |
| Jul 24, 2026 | C | NOV SENT OUT | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 3B, 3rd STORY, ... | 3B | Jul 24, 2026 |
| May 22, 2026 | C | VIOLATION CLOSED | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CL... | 3B | Jun 5, 2026 |
| May 22, 2026 | A | VIOLATION CLOSED | § 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE VISIBLE MOLD AT CAULKING AND GROUT JOINTS OF TH... | 3B | Aug 25, 2026 |
| May 22, 2026 | B | VIOLATION CLOSED | § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT BATHTUB IN THE BATHROOM LOCATED AT APT 3B, 3rd STORY,... | 3B | Jun 26, 2026 |
| May 22, 2026 | B | VIOLATION CLOSED | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING, AT PUBLIC HALL, 3rd STORY | — | Jun 26, 2026 |
| May 22, 2026 | A | VIOLATION CLOSED | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING, AT PUBLIC HALL,... | — | Aug 25, 2026 |
| May 22, 2026 | B | VIOLATION CLOSED | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIALS CEILING AT ... | — | Jun 26, 2026 |
| May 20, 2026 | C | VIOLATION DISMISSED | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 3B, 3rd STORY, ... | 3B | May 20, 2026 |
| Apr 30, 2026 | A | VIOLATION DISMISSED | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION ... | — | Aug 3, 2026 |
| May 20, 2024 | B | VIOLATION CLOSED | § 27-2021 ADM CODE PROVIDE SUFFICIENT, PROPER AND SEPARATE METAL RECEPTACLES FOR THE DEPOSIT OF GARBAGE, RUBBISH AND ... | — | Jun 24, 2024 |
| May 20, 2024 | A | VIOLATION DISMISSED | § 27-2010, 2011, 2012 ADM CODE REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE... | — | Aug 23, 2024 |
| Feb 18, 2022 | A | VIOLATION DISMISSED | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION ... | — | May 24, 2022 |
| Jan 10, 2022 | B | VIOLATION DISMISSED | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING . APPROX. 1 SQ. FT. I... | 3B | Feb 14, 2022 |
| Sep 10, 2021 | B | VIOLATION CLOSED | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT ... | 3B | Oct 15, 2021 |
| Sep 10, 2021 | B | VIOLATION CLOSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 3... | 3B | Oct 15, 2021 |
| Sep 10, 2021 | B | VIOLATION CLOSED | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE 3rd ROOM FROM EAST AT NORTH LOCATED A... | 3B | Oct 15, 2021 |
| Sep 10, 2021 | A | VIOLATION CLOSED | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING . APPROX. 1 SQ. FT. I... | 3B | Dec 14, 2021 |
| Sep 10, 2021 | B | VIOLATION CLOSED | § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 3B, 3rd STOR... | 3B | Oct 15, 2021 |
| Apr 5, 2021 | A | VIOLATION DISMISSED | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION ... | — | Jul 9, 2021 |