5005-5009 5 Avenue, Brooklyn
Brooklyn • Block 00792 • Lot 0005 • Zip: 11220
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 3 days ago- Downtown Brooklyn 28 min 6 walking, 22 riding
- Fulton Street 38 min 6 walking, 32 riding
- Union Square 39 min 6 walking, 33 riding
- Times Square 44 min 6 walking, 38 riding
- Grand Central 49 min 6 walking, 43 riding
- Penn Station 49 min 6 walking, 43 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Subway
Ferry
Bus
Citi Bike
Places nearby
Judy’s
No description yet
Kai Feng Fu Dumpling House
Kai Feng Fu Dumpling House in Brooklyn offers authentic Chinese dumplings made fresh daily. Enjoy a cozy atmosphere w...
Tacos El Bronco
Tacos El Bronco offers authentic Mexican street tacos in a casual and lively atmosphere. Located in Brooklyn, NY, the...
Baba’s Pierogies
No description yet
Chuan Tian Xia
Chuan Tian Xia is a hidden gem in Brooklyn, offering authentic Chinese cuisine in a cozy atmosphere. Enjoy traditiona...
King of Meat
No description yet
Yafa Cafe
Yafa Cafe is a cozy Middle Eastern restaurant in Brooklyn offering authentic dishes like falafel, shawarma, and hummu...
El Rey Del Pescado
No description yet
Activity
Sales, filings, permits and violations from every dataset, in one order.
2026
-
Alteration Type II
THE PURPOSE OF THIS JOB IS TO PROVIDE SOE DETAILS TO INSTALL FOUNDATION WALL. NO CHANGE TO USE EGRESS OR OCCUPANCY
-
Alteration Type II
TEMPORARY RAMP DESIGN. ALL CONSTRUCTION AND CHANGE OF USE ARE FILED UNDER ALTERATION(1).
-
CLASS - 2
FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENTS. AT TIME OF INSPECTION OBSERVED AT ACTIVE JOB SITE...
-
CLASS - 1
FAILURE TO SAFEGUARD THE PUBLIC AND PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS. PREMISES IS A ACTIVE NEW BUILDING J...
-
CLASS - 1
FAILURE TO PROMPTLY NOTIFY THE DEPARTMENT OF AN ACCIDENT, INCIDENT, OR DAMAGE TO ADJOINING PROPERTY AT CONSTRUCTION /...
-
CLASS - 1
FAILURE TO SAFEGUARD PUBLIC AND PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS. PREMISES IS A ACTIVE NEW BUILDING JOB S...
-
CLASS - 1
FAILURE TO PROMPTLY NOTIFY THE DEPARTMENT OF AN ACCIDENT, INCIDENT , OR DAMAGE TO ADJOINING PROPERTY AT CONSTRUCTION ...
-
CLASS - 2
FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENTS. AT TIME OF INSPECTION AT ACTIVE JOB SITE LARGE PI...
-
DOB violation Jul 16, 2026
C-CONSTRUCTION OTHER OPTIONAL
EMER WORK-FTM. PRTL COLLAPSE OF MASONRY WALL @ EXP 3. REMNANT WALLS @ EXP 3&4 REMAIN UNBRACED. EXP 4 OF ADJ PROP 515 ...
-
ALT-CO - New Building with Existing Elements to Remain
Permit Entire
-
ALT-CO - New Building with Existing Elements to Remain
Approved
-
HPD violation Apr 30, 2026
Class A
(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION ...
-
ALT-CO - New Building with Existing Elements to Remain
Approved
-
ALT-CO - New Building with Existing Elements to Remain
Objections
-
ALT-CO - New Building with Existing Elements to Remain
Permit Entire
2025
-
HPD violation Jun 5, 2025
Class A
(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION ...
2024
-
HPD violation Nov 27, 2024
Class I
§27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27...
-
DOB violation Aug 21, 2024
AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
-
HPD violation Apr 3, 2024
Class A
(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION ...
2023
-
DOB violation Jun 30, 2023
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
-
DOB violation Jun 30, 2023
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
-
DOB violation Jun 20, 2023
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
-
DOB violation Jun 20, 2023
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
-
HPD violation Mar 20, 2023
Class A
(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION ...
2022
-
HPD violation Feb 18, 2022
Class A
(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION ...
2020
-
Alteration Type I
2018
-
Alteration Type II
FILING A SPRINKLER SYSTEM IN CONJUNCTION WITH ALTERATION (I), JOB # 321552690
2017
-
Alteration Type III
THE PURPOSE OF THIS PROJECT IS TO FILE BPP INCONJUCTION WITH JOB #321552690.
-
Alteration Type II
PROPOSED SHEETING , SHORING EXCAVATION PLANS FILED HEREWITH IN CONJUNCTION WITH NB APPLICATION (I). NO CHANGE TO USE ...
2011
2005
2003
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Registration Contracts
Contact information from multiple dwelling registrations
Building Permits
Owner information from Department of Buildings filings
Recent Building Permits
Owner information from recent DOB NOW filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records