224-226 7 Avenue, Brooklyn
Brooklyn • Block 00983 • Lot 0041 • Zip: 11215
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 3 days ago- Downtown Brooklyn 21 min 8 walking, 13 riding
- Fulton Street 31 min 8 walking, 23 riding
- Union Square 34 min 8 walking, 26 riding
- Times Square 38 min 8 walking, 30 riding
- Penn Station 42 min 8 walking, 34 riding
- Grand Central 43 min 8 walking, 35 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Subway
Railroad
Ferry
Bus
Citi Bike
Places nearby
Vato
No description yet
La Villa
No description yet
Pangat
No description yet
Mariscos El Submarino Park Slope
No description yet
Il Leone
No description yet
Bonnie's Grill
No description yet
Al Di La
Al Di La is a charming Italian restaurant in Brooklyn known for its rustic, seasonal dishes and cozy atmosphere. With...
Winner
No description yet
Activity
Sales, filings, permits and violations from every dataset, in one order.
2026
-
HPD violation Jul 27, 2026
Class B
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE MASONRY CEMENTS AT GROUTS JOINTS OF ...
-
HPD violation Jul 27, 2026
Class A
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... VISIBLE MOLD LESS THAN 10 SQUARE...
-
HPD violation Jul 27, 2026
Class B
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FILLER AT THE JOINTS GGPP OF TH...
-
HPD violation Jul 27, 2026
Class A
§ 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE PLASTERING DEBRIS AT THE FILLER JOINTS OF THE W...
-
HPD violation Jul 27, 2026
Class B
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE MANSONY CEMENTS AT THE GROUTS JOINTS...
-
HPD violation Jul 27, 2026
Class A
§ 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE VISIBLE MOLD AT CAULKING OF THE MARBLE THRESHOL...
-
CLASS - 2
ATOI OBSERVED WOOD STRUCRTURE APPEARS TO BE AN AWNING APPROXIMATELY 10*15 AT EXPOSURE 3 OF 100% COMPLETED. NO PERMITS...
2025
2023
2022
-
CLASS - 1
AT EXPOSURE#1 CORNICE IN DISREPAIR CONDITION, WOOD ROTTENED ,ONSE SIDE OF ORNAMENT DISPLACED. AT EXPOSURE#3 FACADE HA...
2021
-
CLASS - 2
FAILURE TO MAINTAIN;EXTERIOR BUILDING WALL. NOTE:OBSERVED WOOD CORNICEMOLDING AT ROOF LEVEL ON EXPOSURE 1;EAST ELEVAT...
-
Alteration Type II
INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE TO ESTABLISH AN EATING & DRINKING ESTABLISHMENT. WORKS INCLUDING...
2018
-
DOB violation Apr 6, 2018
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
2017
-
DOB violation Jul 26, 2017
AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
-
CLASS - 2
B254,15,50. AS PER CLASS 2 (B254) 28-301.1 FOR BURNHAM BOILER 15-HOLESIN WALLS AND CEILING, 50-DEBRIS IN BOILER ROOM ...
-
CLASS - 1
B101 AS PER CLASS 1 (B101 28-105.1 WORK W/O PERMIT GET PERMIT TO DO WORK ON BOILER. SUBMIT CERTIFICATE OF CORRECTION....
-
DOB violation Feb 24, 2017
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
2016
-
Alteration Type II
INSTALLATION OF A NEW FIRE SUPPRESSION SYSTEM. FIRE SUPPRESSION SHUT-OFF VALVE FILED UNDER APPLICATION# 340302924. NO...
-
Alteration Type II
INSTALL NEW FIRE SUPPRESSION SYSTEMS AT 1ST FLOOR IN CONJUNCTION WITH 340302924. NO CHANGE IN USE, EGRESS OR CERTIFIC...
2015
-
Alteration Type III
INTERIOR RENOVATION WITHIN AN EXISTING RESIDENTIAL UNIT. REPAIR PARTITION WALL, NEW PAINTING. REPLACE FLOOR AND REPAI...
-
Alteration Type III
INTERIOR RENOVATION WITHIN AN EXISTING RESIDENTIAL UNIT. REPAIR PARTITION WALL, NEW PAINTING. REPLACE FLOOR AND REPAI...
-
Alteration Type III
INTERIOR RENOVATION WITHIN AN EXISTING RESIDENTIAL UNIT. REPAIR PARTITION WALL, NEW PAINTING. REPLACE FLOOR AND REPAI...
2004
-
DOB violation Feb 19, 2004
C-CONSTRUCTION OTHER OPTIONAL
2001
-
DOB violation Feb 27, 2001
LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Registration Contracts
Contact information from multiple dwelling registrations
Building Permits
Owner information from Department of Buildings filings
Recent Building Permits
Owner information from recent DOB NOW filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records