301-311 8 Avenue, Brooklyn
Brooklyn • Block 01081 • Lot 0005 • Zip: 11215
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 3 days ago- Downtown Brooklyn 21 min 8 walking, 13 riding
- Fulton Street 31 min 8 walking, 23 riding
- Union Square 34 min 8 walking, 26 riding
- Times Square 38 min 8 walking, 30 riding
- Penn Station 42 min 8 walking, 34 riding
- Grand Central 43 min 8 walking, 35 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Subway
Railroad
Ferry
Bus
Citi Bike
Places nearby
Vato
No description yet
La Villa
No description yet
Pangat
No description yet
Mariscos El Submarino Park Slope
No description yet
Il Leone
No description yet
Bonnie's Grill
No description yet
Winner
No description yet
Bangkok Degree
No description yet
Activity
Sales, filings, permits and violations from every dataset, in one order.
2026
-
HPD violation Feb 17, 2026
Class B
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AT EAST AND W...
2025
-
HPD violation Oct 20, 2025
Class A
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AT EAST AND W...
-
HPD violation Oct 14, 2025
Class A
§ 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE ...
-
HPD violation Oct 14, 2025
Class A
§ 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR...
-
HPD violation Oct 14, 2025
Class B
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1...
-
HPD violation Oct 14, 2025
Class B
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... GREATER THAN 10 SQ FT AT EAST AN...
2024
2023
-
Alteration Type II
RENOVATE EXISTING APARTMENT A2 NO CHANGE TO EGRESS,OCCUPANCY OR USE.
2022
-
Alteration Type II
RENOVATION OF APT UNIT, INCLUDING REMOVAL AND INSTALLATION OF PARTITION; INSTALLATION OF WOOD & TILE FLOORING AND...
2021
-
Alteration Type II
REPLACE KITCHEN CABINETS AND UPGRADE BATHROOM MILLWORK, REMOVE AND REPLACE EXISTING FLOORING, PAINT NEW WALLS, INSTAL...
-
DOB violation Apr 29, 2021
EGRADE-FAILURE TO POST ENERGY GRADE/SCORE NONE
FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
2020
-
Alteration Type II
FILING HEREWITH FOR INTERIOR APARTMENT RENOVATION AS PER PLANS
-
Alteration Type II
2019
-
Alteration Type II
2018
1999
-
Hazardous
FAILURE TO FILE TR1 PRIOR TO START OF CONTROLLER WORK NO SOIL UNDERPINNING AND CONCRETE TR1 PROVIDED REMEDY STOP ALL ...
-
DOB violation Mar 16, 1999
LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
1997
-
Non-Hazardous
WORK WITHOUT A PERMIT. METAL PLATFORM HAS BEEN CONSTRUCTED ON THE SOUTH SIDE 1ST FLOOR NEAR EXIT DOOR LEADING TO GROU...
-
DOB violation Oct 9, 1997
C-CONSTRUCTION OTHER OPTIONAL
WORK WITHOUT A PERMIT. METAL PLATFORM HAS BEEN CONSTRUCTED ON THE SOUTH SIDE 1ST FLOOR NEAR EXIT DOOR LEADING TO GROU...
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Registration Contracts
Contact information from multiple dwelling registrations
Building Permits
Owner information from Department of Buildings filings
Recent Building Permits
Owner information from recent DOB NOW filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records