Maintenance code violations
921 St Marks Avenue, Brooklyn • Block 01223 • Lot 0078
440 records
HPD grades a violation A for non-hazardous through C for immediately hazardous.
| Issued | Class | Status | Violation | Apartment | Correct by |
|---|---|---|---|---|---|
| Jun 6, 2018 | B | VIOLATION CLOSED | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK CONCEALED WATER LEAK AT CEILIN... | 3B | Jul 11, 2018 |
| Jun 6, 2018 | C | VIOLATION CLOSED | § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE WINDOW PANE AT LOWER SASH AT INTERMEDIATE LANDING AT PUBL... | — | Jun 14, 2018 |
| Jun 6, 2018 | B | VIOLATION CLOSED | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK CONCEALED WATER LEAK AT CEILIN... | 3E | Jul 11, 2018 |
| Mar 6, 2018 | A | NOT COMPLIED WITH | § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXIS... | 2B | Jun 9, 2018 |
| Mar 6, 2018 | A | VIOLATION CLOSED | § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE INTERCOM IN THE FOYER LOCATED AT APT 2B, 2nd STORY, 2nd AP... | 2B | Jun 9, 2018 |
| Feb 22, 2018 | B | VIOLATION CLOSED | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT THE CEILING IN THE 3rd ROOM... | 1E | Mar 29, 2018 |
| Feb 22, 2018 | C | VIOLATION CLOSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT THE CEILING IN T... | 1E | Mar 2, 2018 |
| Feb 22, 2018 | B | FIRST NO ACCESS TO RE- INSPECT VIOLATION | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT THE CEILING IN T... | 1E | Mar 29, 2018 |
| Feb 22, 2018 | B | VIOLATION CLOSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT THE CEILING IN T... | 1E | Mar 29, 2018 |
| Feb 9, 2018 | A | NOT COMPLIED WITH | § 27-2005 ADM CODE PROVIDE A MECHANICAL VENTILATION SYSTEM IN THE KITCHENETTE LOCATED AT APT 3A, 3rd STORY, 1st APART... | 3A | May 15, 2018 |
| Feb 7, 2018 | B | VIOLATION CLOSED | § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE MECHANICAL VENTILATION SYSTEM AT THE WATER-CLOSET COMPARTM... | 1E | Mar 14, 2018 |
| Feb 7, 2018 | B | VIOLATION CLOSED | § 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 3A, 3rd STORY, 1s... | 3A | Mar 14, 2018 |
| Feb 7, 2018 | B | VIOLATION CLOSED | § 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 3A, 3rd STORY,... | 3A | Mar 14, 2018 |
| Feb 7, 2018 | C | VIOLATION CLOSED | § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE MORTISE LOCK OF THE ENTRY DOOR TO THE APARTMENT IN THE ENT... | 3A | Feb 15, 2018 |
| Feb 5, 2018 | B | VIOLATION CLOSED | § 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 4B, 4th STORY,... | 4B | Mar 12, 2018 |
| Feb 5, 2018 | C | VIOLATION CLOSED | § 27-2028, 2032 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FROM AN APPROVED CENTRAL HEATING SYSTEM, OR AN APPROVED S... | 4D | Feb 2, 2018 |
| Feb 5, 2018 | B | VIOLATION CLOSED | § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT BATHTUB IN THE BATHROOM LOCATED AT APT 4B, 4th STORY,... | 4B | Mar 12, 2018 |
| Feb 5, 2018 | B | VIOLATION CLOSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE 1st ... | 4B | Mar 12, 2018 |
| Feb 5, 2018 | B | VIOLATION CLOSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE PRIV... | 4B | Mar 12, 2018 |
| Feb 5, 2018 | C | VIOLATION CLOSED | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 4D, 4th STORY, ... | 4D | Feb 2, 2018 |
| Feb 2, 2018 | B | VIOLATION CLOSED | § 27-2005 ADM CODE PROVIDE MECHANICAL HEAVY DUTY LOCK ON DOOR AT BUILDING FRONT ENTRANCE | — | Mar 9, 2018 |
| Feb 2, 2018 | B | VIOLATION CLOSED | § 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING CONSISTING OF AN UNACCEPTABLE ELECTOMAGNETIC LOCKING DEVICE INS... | — | Mar 9, 2018 |
| Jan 29, 2018 | B | VIOLATION CLOSED | § 27-2040 ADM CODE PROVIDE ADEQUATE LIGHTING AT OR NEAR THE OUTSIDE OF THE FRONT ENTRANCEWAY OF THE BUILDING AND KEEP... | — | Mar 5, 2018 |
| Jan 29, 2018 | C | VIOLATION CLOSED | § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE 2ND, AND 5TH. MARBLE TREADS UP FROM BOTTOM AT PUBLIC HALL... | — | Feb 6, 2018 |
| Jan 26, 2018 | C | VIOLATION CLOSED | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK CEILING IN THE BATHROOM LOCATE... | 3B | Feb 3, 2018 |
| Jan 26, 2018 | A | VIOLATION CLOSED | § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING R... | — | May 1, 2018 |
| Jan 26, 2018 | C | VIOLATION CLOSED | § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE LOCK ON BUILDING ENTRANCE DOOR | — | Feb 3, 2018 |
| Jan 26, 2018 | C | VIOLATION CLOSED | § 27-2005, 2006, 2037 HMC: PROPERLY REPAIR AND ABATE UNSAFE ELECTRIC WIRING CONDITION CONSISTING OF EXPOSED LIVE ELEC... | 3B | Feb 3, 2018 |
| Jan 26, 2018 | C | VIOLATION CLOSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE BATH... | 3B | Feb 3, 2018 |
| Jan 22, 2018 | C | VIOLATION CLOSED | § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE LOCK AT ENTRANCE DOOR TO BUILDING , 1st STORY | — | Jan 30, 2018 |
| Jan 18, 2018 | B | VIOLATION CLOSED | § 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN WASTELINE AT BATHTUB IN THE BATHROOM LOCATED AT ... | 1D | Feb 22, 2018 |
| Jan 18, 2018 | C | VIOLATION DISMISSED | § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE LOCK AT FRONT ENRANCE DOOR , 1st STORY | — | Jan 26, 2018 |
| Jan 18, 2018 | C | VIOLATION CLOSED | § 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES .. IN THE ENTIRE APARTMEN... | 1D | Jan 26, 2018 |
| Jan 18, 2018 | B | VIOLATION CLOSED | § 27-2005, 2007 ADM CODE ARRANGE AND MAKE SELF-CLOSING THE DOORS .. IN THE ENTRANCE LOCATED AT APT 1D, 1st STORY, 2nd... | 1D | Feb 22, 2018 |
| Dec 26, 2017 | B | VIOLATION CLOSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE KITC... | 2A | Jan 30, 2018 |
| Dec 26, 2017 | B | VIOLATION CLOSED | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOC... | 2A | Jan 30, 2018 |
| Dec 6, 2017 | B | VIOLATION CLOSED | § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE BUZZER AT BUILDING ENTRANCE DOOR. , 1st STORY | — | Jan 10, 2018 |
| Dec 6, 2017 | C | VIOLATION DISMISSED | § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE LOCK ASSEMBLY AT BUILDING ENTRANCE DOOR , 1st STORY | — | Dec 14, 2017 |
| — | I | VIOLATION DISMISSED | §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27... | — | — |
| Nov 21, 2017 | C | VIOLATION DISMISSED | § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE DOOR LOCK SET TO THE VESTIBULE AT PUBLIC HALL, 1st STORY | — | Nov 29, 2017 |
| Nov 21, 2017 | A | VIOLATION CLOSED | § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING R... | — | Feb 24, 2018 |
| Sep 25, 2017 | B | VIOLATION CLOSED | § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE BUZZER INTERCOM SYSTEM ...FROM BUILDING ENTRANCE TO .. IN ... | 1E | Oct 30, 2017 |
| Mar 30, 2017 | C | VIOLATION CLOSED | § 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING CHAIN AND PAD LOCK AT WEST FIRE PASSAGE WAY COURT YARD METAL GATE. | — | Apr 7, 2017 |
| Mar 28, 2017 | A | VIOLATION CLOSED | § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXIS... | 4C | Jul 1, 2017 |
| Mar 28, 2017 | A | NOT COMPLIED WITH | § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXIS... | 1E | Jul 1, 2017 |
| Mar 28, 2017 | A | VIOLATION CLOSED | § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXIS... | 1D | Jul 1, 2017 |
| Mar 24, 2017 | B | VIOLATION CLOSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING. IN THE 3rd... | 4C | Apr 28, 2017 |
| Mar 24, 2017 | B | VIOLATION CLOSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING. IN THE BAT... | 4C | Apr 28, 2017 |
| Mar 24, 2017 | B | VIOLATION CLOSED | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING. IN THE BATHROOM LO... | 4C | Apr 28, 2017 |
| Mar 24, 2017 | C | VIOLATION CLOSED | § 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN BATH TUB. IN THE BATHROOM LOCATED AT APT 1D, 1st... | 1D | Apr 1, 2017 |