Maintenance code violations
Dearborn Court, Brooklyn • Block 01296 • Lot 0052
1,390 records
HPD grades a violation A for non-hazardous through C for immediately hazardous.
| Issued | Class | Status | Violation | Apartment | Correct by |
|---|---|---|---|---|---|
| Feb 15, 2023 | C | VIOLATION CLOSED | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS ... | E12 | Mar 11, 2023 |
| Feb 15, 2023 | B | VIOLATION DISMISSED | § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE BATHROOM LOCATED AT APT D16, 4... | D16 | Mar 22, 2023 |
| Feb 15, 2023 | B | VIOLATION DISMISSED | § 27-2005, 2006, 2037 HMC: PROPERLY REPAIR AND ABATE UNSAFE ELECTRIC WIRING CONDITION CONSISTING OF EXPOSED WIRING AT... | D16 | Mar 22, 2023 |
| Feb 15, 2023 | B | VIOLATION DISMISSED | § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT D16, 4th STO... | D16 | Mar 22, 2023 |
| Feb 15, 2023 | B | VIOLATION DISMISSED | § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING ELECTRIC OUTLET COVER PLATE ON EAST WALL AND SOUTH WALL IN THE FOYER ... | D16 | Mar 22, 2023 |
| Feb 15, 2023 | B | VIOLATION DISMISSED | § 27-2005, 2006, 2037 HMC: PROPERLY REPAIR AND ABATE UNSAFE ELECTRIC WIRING CONDITION CONSISTING OF EXPOSED WIRING AT... | D16 | Mar 22, 2023 |
| Feb 15, 2023 | C | VIOLATION DISMISSED | § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICAT... | D16 | Mar 13, 2023 |
| Feb 15, 2023 | B | VIOLATION DISMISSED | § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE IN THE ENTIRE APARTMENT LOCATED... | D16 | Mar 22, 2023 |
| Feb 13, 2023 | C | VIOLATION CLOSED | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS ... | E12 | Mar 9, 2023 |
| Feb 13, 2023 | C | VIOLATION CLOSED | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS XRF TESTED INCONCLUSIVE FOR LEAD CONTENT AT ... | E12 | Mar 9, 2023 |
| Feb 13, 2023 | C | VIOLATION CLOSED | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS ... | E12 | Mar 9, 2023 |
| Feb 13, 2023 | C | VIOLATION CLOSED | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS ... | E12 | Mar 9, 2023 |
| Feb 13, 2023 | C | VIOLATION CLOSED | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS XRF TESTED INCONCLUSIVE FOR LEAD CONTENT AT ... | E12 | Mar 9, 2023 |
| Jan 30, 2023 | B | VIOLATION CLOSED | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | D7 | Mar 6, 2023 |
| Jan 30, 2023 | B | VIOLATION CLOSED | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | C11 | Mar 6, 2023 |
| Jan 30, 2023 | C | VIOLATION CLOSED | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS XRF TESTED INCONCLUSIVE FOR LEAD CONTENT AT ... | D16 | Mar 9, 2023 |
| Jan 30, 2023 | B | VIOLATION CLOSED | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | C7 | Mar 6, 2023 |
| Jan 30, 2023 | B | NOV SENT OUT | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | B17 | Mar 6, 2023 |
| Jan 30, 2023 | B | VIOLATION WILL BE REINSPECTED | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | B9 | Mar 6, 2023 |
| Jan 30, 2023 | B | VIOLATION CLOSED | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | B7 | Mar 6, 2023 |
| Jan 30, 2023 | B | VIOLATION CLOSED | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | E4 | Mar 6, 2023 |
| Jan 30, 2023 | B | VIOLATION CLOSED | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | D14 | Mar 6, 2023 |
| Jan 30, 2023 | C | VIOLATION CLOSED | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS ... | D16 | Mar 9, 2023 |
| Jan 30, 2023 | B | VIOLATION CLOSED | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | F14 | Mar 6, 2023 |
| Jan 30, 2023 | B | VIOLATION CLOSED | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | E17 | Mar 6, 2023 |
| Jan 30, 2023 | B | VIOLATION CLOSED | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | F7 | Mar 6, 2023 |
| Jan 30, 2023 | B | VIOLATION CLOSED | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | F3 | Mar 6, 2023 |
| Jan 30, 2023 | B | FIRST NO ACCESS TO RE- INSPECT VIOLATION | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | D16 | Mar 6, 2023 |
| Jan 30, 2023 | A | VIOLATION DISMISSED | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FRAME FROM SOUT... | D16 | May 5, 2023 |
| Jan 30, 2023 | B | VIOLATION DISMISSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT SOUTH WALL, CEIL... | D16 | Mar 6, 2023 |
| Jan 30, 2023 | B | NOV SENT OUT | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | E16 | Mar 6, 2023 |
| Jan 30, 2023 | B | VIOLATION CLOSED | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | E14 | Mar 6, 2023 |
| Jan 30, 2023 | B | VIOLATION CLOSED | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | E5 | Mar 6, 2023 |
| Jan 26, 2023 | C | NOV SENT OUT | § 27-2056.4 ADM CODE- CORRECT FAILURE TO NOTIFY OCCUPANTS AND/OR TO INVESTIGATE LEAD-BASED PAINT HAZARDS. | — | Jan 30, 2023 |
| Jan 26, 2023 | C | NOV SENT OUT | § 27-2056.4(H) AND 27-2056.17 ADM CODE -CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL REC... | — | Jan 30, 2023 |
| Jan 12, 2023 | C | NOT COMPLIED WITH | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT B9, 2nd ... | B9 | Feb 7, 2023 |
| Nov 23, 2022 | B | VIOLATION DISMISSED | § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF KEY OPERATED LOCK INSTALLED ON ENTRANCE DOOR AT ROO... | D8 | Dec 28, 2022 |
| Nov 23, 2022 | B | VIOLATION DISMISSED | § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT D8, 4th STOR... | D8 | Dec 28, 2022 |
| Nov 23, 2022 | A | VIOLATION DISMISSED | § 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE CERAMIC TILES SURFACE CAULKING AND GROUTS JOINT... | D8 | Feb 26, 2023 |
| Nov 3, 2022 | B | VIOLATION DISMISSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND SOU... | C10 | Dec 8, 2022 |
| Nov 3, 2022 | A | VIOLATION DISMISSED | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD DRAWER FACE AT LOWER CABINET AT... | C10 | Feb 6, 2023 |
| Nov 3, 2022 | B | VIOLATION DISMISSED | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOC... | C10 | Dec 8, 2022 |
| Nov 3, 2022 | A | VIOLATION DISMISSED | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 1 SQ.FT AT CEILING... | C10 | Feb 6, 2023 |
| Nov 2, 2022 | C | VIOLATION CLOSED | § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE ENTRANCE DOO... | — | Nov 16, 2022 |
| Nov 2, 2022 | C | VIOLATION CLOSED | § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE AT VETSIBULE... | — | Nov 16, 2022 |
| Oct 12, 2022 | A | VIOLATION DISMISSED | § 27-2005 ADM CODE REFIT FIRE PASSAGE WAY DOORS AT PUBLIC HALL, 2nd STORY | — | Jan 15, 2023 |
| Oct 12, 2022 | C | VIOLATION DISMISSED | § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE BULK HEAD DO... | — | Oct 26, 2022 |
| Oct 12, 2022 | A | VIOLATION DISMISSED | § 27-2005 ADM CODE REFIT FIRE PASSAGE WAY DOORS AT PUBLIC HALL, 4th STORY | — | Jan 15, 2023 |
| Oct 12, 2022 | A | VIOLATION DISMISSED | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT PUBLIC HALL STAIR WEST WALL ... | — | Jan 15, 2023 |
| Oct 12, 2022 | B | VIOLATION DISMISSED | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT PLASTER AT PUBLIC HAL... | — | Nov 16, 2022 |