Maintenance code violations
1785 Bedford Avenue, Brooklyn • Block 01319 • Lot 0004
217 records
HPD grades a violation A for non-hazardous through C for immediately hazardous.
| Issued | Class | Status | Violation | Apartment | Correct by |
|---|---|---|---|---|---|
| Jul 2, 2026 | C | NOT COMPLIED WITH | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 25 SQ. FT. AT CEILING ... | 2L | Jul 28, 2026 |
| Nov 19, 2025 | B | NOT COMPLIED WITH | § 27-2070 ADM CODE DISCONTINUE UNLAWFUL COOKING SPACE OR FILE PLANS AND APPLICATION WITH THIS DEPARTMENT TO LEGALIZE ... | 2L | Dec 24, 2025 |
| Oct 20, 2025 | B | VIOLATION CLOSED | § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF BOXES AND HOUSEHOLD ITEMS AT PUBLIC HALL, 1st STORY | — | Nov 24, 2025 |
| Oct 20, 2025 | B | NOT COMPLIED WITH | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE 1ST AND 2ND MARBLE TREAD FROM BOTTOM... | — | Nov 24, 2025 |
| Sep 18, 2025 | B | FIRST NO ACCESS TO RE- INSPECT VIOLATION | § 27-2005, 2007 ADM CODE AND DEPT. RULES AND REGULATIONS. REMOVE THE ENCUMBRANCE OBSTRUCTING EGRESS FROM FIRE ESCAPES... | — | Oct 23, 2025 |
| Sep 18, 2025 | B | FIRST NO ACCESS TO RE- INSPECT VIOLATION | § 27-2005, 2007 ADM CODE AND DEPT. RULES AND REGULATIONS. REMOVE THE ENCUMBRANCE OBSTRUCTING EGRESS FROM FIRE ESCAPES... | — | Oct 23, 2025 |
| Sep 18, 2025 | B | FIRST NO ACCESS TO RE- INSPECT VIOLATION | § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF EXCESSIVE VEGETATION AT REAR DROP LADDER CREATING A... | — | Oct 23, 2025 |
| Sep 18, 2025 | B | VIOLATION CLOSED | § 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF STORAGE BOXES AND HOUSEHOLD ITEMS STORED AT PUBLIC HAL... | — | Oct 23, 2025 |
| Sep 17, 2025 | C | NOT COMPLIED WITH | § 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES AT STOVE AND RANGE IN THE KITCHEN LOCATED AT APT... | 2L | Sep 23, 2025 |
| Sep 17, 2025 | B | VIOLATION CLOSED | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 25 SQ. FT. AT CEILING ... | 2L | Oct 22, 2025 |
| Jun 6, 2025 | A | VIOLATION DISMISSED | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION ... | — | Sep 9, 2025 |
| May 2, 2025 | B | NOT COMPLIED WITH | § 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES AT STOVE AND RANGE IN THE KITCHEN LOCATED AT APT... | 2L | Jun 6, 2025 |
| May 2, 2025 | A | NOT COMPLIED WITH | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 5th ROOM FROM EAST... | 2L | Aug 5, 2025 |
| May 2, 2025 | C | VIOLATION CLOSED | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT FLOOR IN THE KITCHE... | 2L | May 8, 2025 |
| Mar 24, 2025 | B | NOT COMPLIED WITH | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MAILBOX AT PUBLIC HALL, 1st STORY | — | Apr 28, 2025 |
| Mar 24, 2025 | C | NOT COMPLIED WITH | § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIG... | — | Mar 30, 2025 |
| Mar 20, 2025 | B | VIOLATION CLOSED | § 27-2021 ADM CODE PROVIDE SUFFICIENT, PROPER AND SEPARATE METAL RECEPTACLES FOR THE DEPOSIT OF GARBAGE, RUBBISH AND ... | — | Apr 24, 2025 |
| Mar 10, 2025 | B | NOT COMPLIED WITH | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MAILBOX AT NORTH WALL AT PUBLIC HALL, 1st STORY | — | Apr 14, 2025 |
| Mar 3, 2025 | C | VIOLATION CLOSED | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CL... | — | Mar 17, 2025 |
| Feb 20, 2025 | C | VIOLATION CLOSED | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RATED MATERIAL AT CEILING AT CE... | — | Feb 26, 2025 |
| Feb 20, 2025 | C | VIOLATION CLOSED | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE GLASS AT BUILDING ENTRANCE DOOR AT PUBLIC HALL, 1st... | — | Feb 26, 2025 |
| Feb 20, 2025 | C | FIRST NO ACCESS TO RE- INSPECT VIOLATION | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE BRICK AND MORTAR AT WEST EXTERIOR WA... | — | Feb 26, 2025 |
| Feb 20, 2025 | A | VIOLATION CLOSED | § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING WIRE MESH UNDER SKYLIGHT AT BULKHEAD | — | May 26, 2025 |
| Feb 20, 2025 | C | FIRST NO ACCESS TO RE- INSPECT VIOLATION | § 27-2005, 2006, 2037 HMC: PROPERLY REPAIR AND ABATE UNSAFE ELECTRIC WIRING CONDITION CONSISTING OF EXPOSED ELECTRICA... | — | Feb 26, 2025 |
| Feb 20, 2025 | C | VIOLATION CLOSED | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CL... | — | Mar 6, 2025 |
| Feb 6, 2025 | A | VIOLATION CLOSED | §27-2153 ADM CODE POST AND MAINTAIN A NOTICE, WRITTEN IN ENGLISH AND IN SPANISH, ON THE BUILDING ENTRANCE DOOR OR OTH... | — | May 12, 2025 |
| Feb 4, 2025 | C | VIOLATION CLOSED | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR AT BUILDING FRONT LEADING TO CELLER IS LOCKE... | — | Feb 10, 2025 |
| Feb 3, 2025 | B | VIOLATION CLOSED | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE GLASS PANE AT LOWER BUILDING ENTRANCE DOOR AT PUBLI... | — | Mar 10, 2025 |
| Jan 31, 2025 | C | VIOLATION CLOSED | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 3L, 3rd STORY, ... | 3L | Jan 31, 2025 |
| — | I | INFO NOV SENT OUT | §27-2153 ADM CODE THE PREMISES HAS BEEN SELECTED TO PARTICIPATE IN THE ALTERNATIVE ENFORCEMENT PROGRAM WHICH MAY RESU... | — | — |
| Jan 28, 2025 | C | VIOLATION CLOSED | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BROKEN GLASS PANE AT BUILDING ENTRANCE DOOR , 1st S... | — | Feb 3, 2025 |
| Jan 28, 2025 | C | VIOLATION CLOSED | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT BOILER ROOM | — | Feb 3, 2025 |
| Jan 23, 2025 | C | VIOLATION DISMISSED | § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 3L, 3r... | 3L | Jan 23, 2025 |
| Jan 23, 2025 | C | VIOLATION CLOSED | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 3L, 3rd STORY, ... | 3L | Jan 23, 2025 |
| — | I | VIOLATION DISMISSED | §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27... | — | — |
| Sep 13, 2024 | B | VIOLATION CLOSED | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT NORTH WALL IN THE BATHROOM ... | 2L | Oct 18, 2024 |
| Sep 13, 2024 | A | VIOLATION CLOSED | § 27-2026 ADM CODE RESET, SO AS TO SECURE A PROPER AND TIGHT CONNECTION, THE WATER CLOSET BOWL WATER CLOSET BOWL TO F... | 2L | Dec 17, 2024 |
| Sep 13, 2024 | B | NOT COMPLIED WITH | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT NORTH WALL IN TH... | 2L | Oct 18, 2024 |
| Sep 13, 2024 | B | VIOLATION CLOSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT NORTH WALL IN TH... | 2L | Oct 18, 2024 |
| Sep 13, 2024 | B | VIOLATION CLOSED | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT FLOOR IN THE KITCHE... | 2L | Oct 18, 2024 |
| Sep 13, 2024 | B | VIOLATION CLOSED | § 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN BATHTUB WASTE LINE IN THE BATHROOM LOCATED AT AP... | 2L | Oct 18, 2024 |
| Sep 13, 2024 | B | NOT COMPLIED WITH | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT THE CEILING IN T... | 2L | Oct 18, 2024 |
| Sep 13, 2024 | B | VIOLATION CLOSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT SOUTH WALL OF BA... | 2L | Oct 18, 2024 |
| Sep 13, 2024 | A | VIOLATION CLOSED | § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION STEAM RISER IN THE BATHROOM LOCATED AT APT 2L, 2nd... | 2L | Dec 17, 2024 |
| Sep 13, 2024 | B | NOT COMPLIED WITH | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR AT SINK BASE CABINET IN T... | 2L | Oct 18, 2024 |
| Sep 13, 2024 | B | VIOLATION CLOSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE B... | 2L | Oct 18, 2024 |
| Jul 18, 2024 | C | VIOLATION CLOSED | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOCKING DEVICE AT BUILDING ENTRANCE DOOR AT LOBBY, ... | — | Jul 24, 2024 |
| Jul 18, 2024 | B | VIOLATION CLOSED | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE GLASS PANEL AT BUILDING ENTRANCE DOOR , 1st STORY | — | Aug 22, 2024 |
| Jul 16, 2024 | A | NOT COMPLIED WITH | § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING GLASS PANE AT VESTIBULE DOOR , 1st STORY | — | Oct 19, 2024 |
| Jul 16, 2024 | A | VIOLATION CLOSED | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BOTTOM GLASS PANE AT BUILDING ENTRANCE DOOR , 1st S... | — | Oct 19, 2024 |