Maintenance code violations
1193 Eastern Parkway, Brooklyn • Block 01391 • Lot 0049
543 records
HPD grades a violation A for non-hazardous through C for immediately hazardous.
| Issued | Class | Status | Violation | Apartment | Correct by |
|---|---|---|---|---|---|
| Dec 19, 2017 | B | VIOLATION CLOSED | § 27-2026 ADM CODE REPAIR THE BROKEN OR DEFECTIVE CONNECTION WASTELINE AT WASHBASIN IN THE BATHROOM LOCATED AT APT 1A... | 1A | Jan 23, 2018 |
| Dec 19, 2017 | B | VIOLATION CLOSED | § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE INOPERATIVE ELECTRICAL LIGHT FIXTURE AT CEILING IN THE FOY... | 1A | Jan 23, 2018 |
| Dec 19, 2017 | B | VIOLATION CLOSED | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE PORCELAIN SURFACE AT BATHTUB IN THE ... | 1A | Jan 23, 2018 |
| Oct 30, 2017 | A | VIOLATION CLOSED | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AND WEST WALL IN... | 3C | Feb 2, 2018 |
| Oct 30, 2017 | A | VIOLATION CLOSED | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE SOUTH AND WEST WALL IN T... | 3C | Feb 2, 2018 |
| Oct 30, 2017 | B | VIOLATION CLOSED | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILES IN THE ENTIRE APAR... | 3C | Dec 4, 2017 |
| Oct 30, 2017 | B | VIOLATION CLOSED | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE SLOPING WOOD FLOOR IN THE ENTIRE APA... | 3C | Dec 4, 2017 |
| Oct 30, 2017 | B | VIOLATION CLOSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE ... | 3C | Dec 4, 2017 |
| Oct 30, 2017 | A | VIOLATION CLOSED | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE EAST WALL IN THE 2nd ROO... | 3C | Feb 2, 2018 |
| Oct 30, 2017 | B | VIOLATION CLOSED | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK FROM CEILING TO WALLS IN THE B... | 3C | Dec 4, 2017 |
| Jun 21, 2017 | A | VIOLATION CLOSED | § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING R... | — | Sep 24, 2017 |
| May 1, 2017 | C | VIOLATION CLOSED | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED... | 1A | May 29, 2017 |
| May 1, 2017 | C | VIOLATION CLOSED | § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICAT... | 1A | May 29, 2017 |
| Mar 1, 2017 | B | VIOLATION DISMISSED | § 27-2005, 2007 ADM CODE AND DEPT. RULES AND REGULATIONS. REMOVE THE ENCUMBRANCE OBSTRUCTING EGRESS FROM FIRE ESCAPES... | — | Apr 5, 2017 |
| Mar 1, 2017 | C | VIOLATION CLOSED | § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICAT... | 1A | Mar 29, 2017 |
| Mar 1, 2017 | B | VIOLATION DISMISSED | § 27-2026 ADM CODE REPAIR THE FLUSHING APPARATUS AND MAINTAIN SAME SO AS TO FLUSH EFFECTIVELY THE WATER CLOSET ... IN... | 1A | Apr 5, 2017 |
| Mar 1, 2017 | B | VIOLATION DISMISSED | § 27-2026 ADM CODE REPLACE THE BROKEN OR DEFECTIVE WASH BASIN IN THE BATHROOM LOCATED AT APT 1A, 1st STORY, 1st APART... | 1A | Apr 5, 2017 |
| Feb 7, 2017 | A | VIOLATION CLOSED | § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF PEELING PAINT AT BATHTUB IN THE BATHROOM LOCATED AT... | 1A | May 13, 2017 |
| Feb 12, 2016 | C | VIOLATION CLOSED | SECTION 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE MASONRY SUPPORT BALCONY BUILDI... | — | Feb 20, 2016 |
| Feb 8, 2016 | A | VIOLATION CLOSED | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES I... | 2D | May 13, 2016 |
| Apr 13, 2015 | A | VIOLATION CLOSED | § 27-2005 ADM CODE REFIT LOWER SASH AT SOUTH 2 WINDOW IN THE 3rd ROOM FROM NORTH AT WEST LOCATED AT APT B1, 2nd STORY... | B1 | Jul 17, 2015 |
| Apr 13, 2015 | A | VIOLATION CLOSED | § 27-2005 ADM CODE REFIT LOWER SASH AT SOUTH 1 WINDOW IN THE 3rd ROOM FROM NORTH AT WEST LOCATED AT APT B1, 2nd STORY... | B1 | Jul 17, 2015 |
| Apr 13, 2015 | B | VIOLATION CLOSED | § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE COUNTER BALALNCE AT TOP SASH WINDOW TO FIRE ESCAPE IN THE ... | B1 | May 18, 2015 |
| Apr 13, 2015 | B | VIOLATION CLOSED | § 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... AT CEILING 3 SQ.FT. SOUTH WAL... | B1 | May 18, 2015 |
| Mar 30, 2015 | A | VIOLATION CLOSED | SECTION 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH O... | — | Jul 3, 2015 |
| Feb 20, 2015 | B | VIOLATION CLOSED | SECTION 27-2005, 2007 ADM CODE ARRANGE AND MAKE SELF-CLOSING THE DOORS ,,, IN THE ENTRANCE LOCATED AT APT 2D, 4th STO... | 2D | Mar 27, 2015 |
| Feb 20, 2015 | C | VIOLATION CLOSED | SECTION 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) THROUGHOUT THE PUBLIC AREAS... | — | Mar 20, 2015 |
| Jan 22, 2015 | A | VIOLATION CLOSED | § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RADIATOR FROM EAST AT SOUTH WALL IN THE 5t... | 2D | Apr 27, 2015 |
| Dec 16, 2014 | A | VIOLATION CLOSED | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st WINDOW FRAME FROM NO... | 2D | Mar 21, 2015 |
| Dec 16, 2014 | C | VIOLATION CLOSED | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED... | 2D | Jan 27, 2015 |
| Dec 16, 2014 | C | VIOLATION CLOSED | SECTION 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND TH... | 2D | Feb 10, 2015 |
| Dec 16, 2014 | A | VIOLATION CLOSED | SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURF... | 2D | Mar 21, 2015 |
| Dec 16, 2014 | C | VIOLATION CLOSED | SECTION 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND TH... | 2D | Feb 10, 2015 |
| Dec 16, 2014 | A | VIOLATION CLOSED | SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE WEST WALL, 1st DOO... | 2D | Mar 21, 2015 |
| Dec 16, 2014 | C | VIOLATION CLOSED | SECTION 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPEC... | 2D | Jan 13, 2015 |
| Dec 16, 2014 | B | VIOLATION CLOSED | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING CEILING IN THE 5th ROOM FROM NORTH AT WEST L... | 2D | Jan 20, 2015 |
| Dec 16, 2014 | A | VIOLATION CLOSED | SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FRAME FRO... | 2D | Mar 21, 2015 |
| Dec 16, 2014 | B | VIOLATION CLOSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE ... | 2D | Jan 20, 2015 |
| Sep 24, 2014 | A | VIOLATION CLOSED | § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE RUSTED BASE CABINET IN THE KITCHEN LOCATED AT APT D4, 4th... | D4 | Dec 28, 2014 |
| Sep 24, 2014 | B | VIOLATION CLOSED | SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CLOSET CEILIN... | D4 | Oct 29, 2014 |
| Sep 24, 2014 | B | VIOLATION CLOSED | § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING LOCATED AT APT D4, 4th STORY, 2nd APARTMENT FROM WEST... | D4 | Oct 29, 2014 |
| Sep 24, 2014 | B | VIOLATION CLOSED | SECTION 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE GASKET AT REFRIGERATOR IN THE KITCHEN LOCATED AT AP... | D4 | Oct 29, 2014 |
| Sep 24, 2014 | B | VIOLATION CLOSED | § 27-2046.1, 2046.2 HMC: PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANC... | D4 | Oct 29, 2014 |