2353 Pacific Street, Brooklyn
Brooklyn • Block 01436 • Lot 0036 • Zip: 11233
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 5 days ago- Downtown Brooklyn 30 min 3 walking, 27 riding
- Fulton Street 37 min 3 walking, 34 riding
- Union Square 43 min 3 walking, 40 riding
- Grand Central 47 min 3 walking, 44 riding
- Penn Station 47 min 3 walking, 44 riding
- Times Square 48 min 3 walking, 45 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Subway
Railroad
Bus
Citi Bike
Places nearby
Pita Point
No description yet
AUX Karaoke Box
AUX Karaoke Box is a vibrant bar in Brooklyn, offering private karaoke rooms for guests to sing their hearts out. Enj...
The Daily Press, Coffee House and Bar
Coffee & pastries plus beer & wine served in a chill corner spot with brick walls & arched windows.
Macaron Coffee Bar
Macaron Coffee Bar is a charming cafe in Brooklyn offering a delightful selection of macarons, coffee, and light bite...
Four T Restaurant INC
Four T Restaurant INC is a cozy eatery in Brooklyn offering a diverse menu of American comfort food. Enjoy delicious ...
Sisters & Family
Caribbean restaurant
All Night Skate
All Night Skate is a hip bar in Brooklyn offering a nostalgic roller skating theme with a modern twist. Enjoy craft c...
Dolly's
No description yet
Activity
Sales, filings, permits and violations from every dataset, in one order.
2026
-
HPD violation May 29, 2026
Class B
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE COUNTER BALANCE AT LOWER WINDOW SASH IN THE 4th ROO...
-
HPD violation May 18, 2026
Class A
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQUARE FEET AT CEIL...
-
HPD violation May 18, 2026
Class A
§ 27-2026 ADM CODE RESET, SO AS TO SECURE A PROPER AND TIGHT CONNECTION, THE WATER CLOSET BOWL ... IN THE BATHROOM LO...
2025
-
HPD violation Sep 24, 2025
Class B
§ 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING ...
-
HPD violation Sep 24, 2025
Class B
§ 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON ...
-
HPD violation Sep 24, 2025
Class A
§ 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED...
2021
-
CLASS - 2
ON EXP 2 AND EXP 4 CI INSTALLATION IS INSTALLED AS 16.2 R AS PER SUBMITTAL OF GIFS AS OPPOSED TO REQUIRED 24R AS PER ...
-
CLASS - 2
AT TIME OF ENERGY CODE COMPLIANCE INSPECTION.I OBSERVED THAT THERE WERE NO COMPLETE SETS OF DOB APPROVED PLANS AT SIT...
2020
-
Alteration Type I
NO WORK TO BE FILED UNDER THIS APPLICATION. FILING TO REVISE METES AND BOUNDS DUE TO FILING NB #321387290
2019
-
DOB violation Nov 8, 2019
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
-
DOB violation Nov 8, 2019
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
2013
-
New Building
-
Alteration Type II
INSTALL BOILER IN CONJUNCTION WITH NEW BUILDING. THIS APPLICATION IS FOR BIOLER WORK TYPE ONLY, BOILER FLUE AND GAS C...
-
Alteration Type II
INSTALLATION OF NEW AUTOMATIC SMOKE/HEAT DETECTION AND SPRINKLER FIRE ALARM SYSTEM.
-
Alteration Type II
NEW SPRINKLER SYSTEM IN CONJUNCTION WITH NEW BUILDING. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
2012
-
CLASS - 2
FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENTS. NOTED:AT TIME OF INSPECTION AT ACTIVE JOB SITE OB...
-
CLASS - 1
FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMPORARY CONSTRUCTION. NO TOE BOARDS:NOTED:AT TIME OF INS...
-
CLASS - 1
WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS &/OR APPROVED AMENDMENTS: NOTED: AT TIME OF INSPECTION AT AC...
-
CLASS - 1
FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMPORARY CONSTRUCTION - NO GUARD RAILS. NOTED: AT TIME OF...
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Registration Contracts
Contact information from multiple dwelling registrations
Building Permits
Owner information from Department of Buildings filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records