ECB violations
1728 Sterling Place, Brooklyn • Block 01470 • Lot 0018
4 records
Environmental Control Board violations, which carry a hearing and a penalty.
| Issued | Violation | Status | Severity | Description | Penalty | Balance due | Hearing |
|---|---|---|---|---|---|---|---|
| Jul 23, 2021 | 39044891K | RESOLVE | CLASS - 1 | AS PER TWO HEATING BOILERS. LOW WATER CUT-OFF SWITCHES INSTALLED DOWNSTREAM FROM BOILER ISOLATION VALVES; CORRECT ALL... | $1,250 | $0 | Aug 12, 2021 |
| Mar 11, 2020 | 39019480L | RESOLVE | CLASS - 2 | THE SYSTEM EXPANSION TANK IS NOT IN PLACE-BOTH LWCO'S ARE INSTALLED AFTER THE BOILER ISOLATION VALVES; CORRECT VIOLAT... | $625 | $0 | Mar 16, 2020 |
| Mar 11, 2020 | 39019481N | RESOLVE | CLASS - 2 | THE LWCO IS INSTALLED AFTER THE BOILER ISOLATION VALVE; CORRECT VIOLATION AND SUBMIT THE CERTIFICATE OF CORRECTION | $625 | $0 | Mar 16, 2020 |
| Mar 11, 2020 | 39019482P | RESOLVE | CLASS - 2 | AOSMITH HW BOILER THE HW STORAGE TANK #2 SAFETY RELIEF VALVE IS DEFECTIVE, MAINTAIN BOILER; CORRECT VIOLATION AND SUB... | $625 | $0 | Mar 16, 2020 |