ECB violations
19 Patchen Avenue, Brooklyn • Block 01618 • Lot 0008
3 records
Environmental Control Board violations, which carry a hearing and a penalty.
| Issued | Violation | Status | Severity | Description | Penalty | Balance due | Hearing |
|---|---|---|---|---|---|---|---|
| Feb 1, 2010 | 32067608N | RESOLVE | CLASS - 2 | 48B.50A.50B.50C.50D.50A H/P SLOW OPENING VALVE NEEDED ON BLOW DOWN 50B 1" NIPPLE CORRODED ON FILL LINE 50C NEEDS DOUB... | $0 | $0 | Mar 29, 2010 |
| Nov 22, 2004 | 32046615Z | RESOLVE | Non-Hazardous | 3A/32A/38/50A/34/50B SLANT FIN (50A)REPLACE THE MISSING JACKETS (50B) COVER THE VENT HOLE IN THE BOILER ROOM DOOR (50... | $800 | $0 | Jan 10, 2005 |
| Nov 22, 2004 | 32046613P | RESOLVE | Non-Hazardous | 11A/32A/38/34A-1991 FULTON NAIL BP 62615 (11A)ADD A SLOW OPENING VALVE ON THE BOTTOM BLOWDOWN LINE (34)COVER VENT HOL... | $180 | $0 | Jan 31, 2005 |