Skip to content

ECB violations

19 Patchen Avenue, Brooklyn • Block 01618 • Lot 0008

3 records

Environmental Control Board violations, which carry a hearing and a penalty.

Issued Violation Status Severity Description Penalty Balance due Hearing
Feb 1, 2010 32067608N RESOLVE CLASS - 2 48B.50A.50B.50C.50D.50A H/P SLOW OPENING VALVE NEEDED ON BLOW DOWN 50B 1" NIPPLE CORRODED ON FILL LINE 50C NEEDS DOUB... $0 $0 Mar 29, 2010
Nov 22, 2004 32046615Z RESOLVE Non-Hazardous 3A/32A/38/50A/34/50B SLANT FIN (50A)REPLACE THE MISSING JACKETS (50B) COVER THE VENT HOLE IN THE BOILER ROOM DOOR (50... $800 $0 Jan 10, 2005
Nov 22, 2004 32046613P RESOLVE Non-Hazardous 11A/32A/38/34A-1991 FULTON NAIL BP 62615 (11A)ADD A SLOW OPENING VALVE ON THE BOTTOM BLOWDOWN LINE (34)COVER VENT HOL... $180 $0 Jan 31, 2005