Skip to content

DOB violations

175 Malcolm X Boulevard, Brooklyn • Block 01642 • Lot 0002

12 records

Violations issued by the Department of Buildings.

Issued Violation Type Category Description Disposed
Jun 30, 2023 38961 LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED V-DOB VIOLATION - ACTIVE VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
Apr 25, 2023 12252 LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED V-DOB VIOLATION - ACTIVE VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
Apr 6, 2018 09177 LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED V*-DOB VIOLATION - DISMISSED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT Jul 2, 2018
Jan 6, 2006 12266 LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED V-DOB VIOLATION - ACTIVE
Oct 5, 2000 03HD04 C-CONSTRUCTION OTHER OPTIONAL VW-VIOLATION WORK WITHOUT PERMIT - ACTIVE WORK WITHOUT A PERMIT. WORK NOTED: FULL PARTITIONS ERECTED AT 1 STY REAR CREATING ROOMS WITH 3PC BATHROOM AND KITCHEN...
Oct 5, 2000 03HD03 C-CONSTRUCTION OTHER OPTIONAL V-DOB VIOLATION - ACTIVE HAZARDOUS
Sep 29, 2000 C030301 C-CONSTRUCTION OTHER OPTIONAL V-DOB VIOLATION - ACTIVE HAZARDOUS
Feb 7, 2000 16571 LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED V-DOB VIOLATION - ACTIVE
Aug 29, 1995 25659 LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED V-DOB VIOLATION - ACTIVE
Jun 1, 1994 07285 LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED V-DOB VIOLATION - ACTIVE
Aug 16, 1993 23892 LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED V-DOB VIOLATION - ACTIVE
Jun 1, 1993 07284 LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED V-DOB VIOLATION - ACTIVE