Job filings
Interfaith Med Center, Brooklyn • Block 01705 • Lot 0001
82 records
Work filed with the Department of Buildings under its legacy BIS system.
| Latest action | Job | Type | Status | Work | Cost | Owner |
|---|---|---|---|---|---|---|
| Sep 14, 2023 | 340765425 | Alteration Type II | SIGNED OFF | PROPOSED STRUCTURAL DUNNAGE FRAMING WORK. ALL AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. | $348,324 | INTERFAITH MEDICAL CENTER |
| Sep 12, 2023 | 340744886 | Alteration Type II | SIGNED OFF | PROPOSED INTERIOR RENOVATION FOR INTERFAITH MEDICAL CENTER. ALL AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS... | $8,347,923 | INTERFAITH MEDICAL CENTER |
| Feb 24, 2023 | 340792075 | Alteration Type II | SIGNED OFF | REMOVAL OF EXISTING SKYLIGHT AND ADD NEW SLAB AND ROOFING MATERIAL TO PREVIOUS OPENING. REFER TO SEPARATE APPLICATION... | $200,000 | INTERFAITH MEDICAL CENTER |
| Feb 24, 2023 | 340792084 | Alteration Type II | SIGNED OFF | MINOR STRUCTURAL MODIFICATIONS TO REMOVE EXISTING SKYLIGHT AND ADD NEW SLAB AND ROOFING MATERIAL TO PREVIOUS OPENING.... | $150,000 | INTERFAITH MEDICAL CENTER |
| Feb 24, 2023 | 340761964 | Alteration Type II | SIGNED OFF | MODIFICATION TO INTERIOR PARTITIONS AND FINISHES ON PARTIAL 4TH FLOOR, WEST AND NORTH WINGS, TO ACCOMMODATE ALTERATIO... | $822,707 | INTERFAITH MEDICAL CENTER |
| Jun 16, 2022 | 340797025 | Alteration Type II | SIGNED OFF | MODIFICATION TO INTERIOR PARTITIONS AND FINISHES TO ACCOMMODATE ALTERATIONS FOR THE EES DECANTING PROJECT WITHIN THE ... | $100,000 | INTERFAITH MEDICAL CENTER |
| Jan 27, 2022 | 340725308 | Alteration Type II | SIGNED OFF | MODIFICATION TO INTERIOR PARTITIONS AND FINISHES TO ACCOMMODATE ALTERATIONS TO THE CENTRAL PHARMACY WITH IN THE EXIST... | $1,508,000 | INTERFAITH MEDICAL CENTER |
| Aug 26, 2021 | 321903730 | Alteration Type II | SIGNED OFF | MODIFICATIONS TO INTERIOR PARTITIONS AND FINISHES INCLUDING REPLACEMENT OF ACCESS STAIRS TO ACCOMMODATE ALTERATIONS T... | $400,000 | INTERFAITH MEDICAL CENTER |
| Apr 16, 2021 | 340798621 | Alteration Type II | PLAN EXAM - DISAPPROVED | MODIFICATION TO INTERIOR PARTITIONS AND FINISHES SELECTIVE ROOF REPLACEMENT AND EXTERIOR WORK TO ACCOMMODATE ALTERATI... | $100,000 | INTERFAITH MEDICAL CENTER |
| Mar 30, 2021 | 301676657 | Alteration Type II | PLAN EXAM - APPROVED | REPLACEMENT/UPGRADE OF EXISTING INDIVIDU ALLY CODED FIRE ALARM SYSTEM W/CENTRAL OFFICE. THERE IS NO CH ANGE IN USE, E... | $780,000 | INTERFAITH MEDICAL CENTER |
| Aug 28, 2020 | 340760705 | Alteration Type II | PLAN EXAM - IN PROCESS | PROPOSED STRUCTURAL DUNNAGE FRAMING WORK. ALL AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. | $348,324 | INTERFAITH MEDICAL CENTER |
| Jul 27, 2020 | 340715596 | Alteration Type II | SIGNED OFF | CONSTRUCT A PERMANENT ENCLOSURE INCLUDING CHAIN LINK FENCE, BOLLARDS, AND GUARDRAIL FOR THE EXISTING LIQUID OXYGEN TA... | $160,000 | INTERFAITH MEDICAL CENTER |
| Jul 22, 2020 | 322041508 | Alteration Type II | PERMIT ISSUED - ENTIRE JOB/WORK | PROPOSED REMOVAL OF INTERIOR PARTITIONS & ASSOCIATED ELEMENTS IN PREPARATION FOR A BUILD OUT. ALL AS PER PLANS FI... | $434,143 | INTERFAITH MEDICAL CENTER |
| Jun 15, 2020 | 340731284 | Alteration Type II | PERMIT ISSUED - ENTIRE JOB/WORK | INSTALLATION OF 35 DOUBLE STACKING PARKING LIFTS. NO CHANGE TO OCCUPANCY, USE, OR EGRESS. | $175,000 | INTERFAITH HOSPITAL |
| May 8, 2020 | 321526274 | Alteration Type II | SIGNED OFF | INSTALLATION OF NEW CHILLER AND MODIFICATION OF STRUCTURAL STEEL SUPPORT AS INDICATED ON ATTACHED PLANS. THERE IS NO ... | $800,000 | INTERFAITH MDICAL CENTER |
| Feb 5, 2020 | 340661064 | Alteration Type III | SIGNED OFF | INSTALLATION OF TEMPORARY WORK PLATFORMS, AS PER DRAWINGS. TEMPORARY WORK PLATFORMS SHALL COMPLY WITH CHAPTER #33 OF ... | $0 | YORK SCAFFOLD EQUIPMENT CORP. |
| Nov 14, 2019 | 340705687 | Alteration Type II | PLAN EXAM - IN PROCESS | CONSTRUCT A PERMANENT ENCLOSURE INCLUDING CHAIN LINK FENCE, BOLLARDS, AND GUARDRAIL FOR THE EXISTING LIQUID OXYGEN TA... | $160,000 | INTERFAITH MEDICAL CENTER |
| Sep 27, 2019 | 320017101 | Alteration Type II | SIGNED OFF | PROPOSE TO SUPERSEDE CURRENT APPLICANT OF RECORD FOR THE PURPOSE OF SECURING JOB SIGN-OFF AND SUBMIT TR-1 AS NEW INSP... | $750,000 | INTERFAITH MEDICAL CENTER |
| Sep 11, 2019 | 340696571 | Alteration Type II | PLAN EXAM - IN PROCESS | CONSTRUCT A PERMANENT ENCLOSURE INCLUDING CHAIN LINK FENCE, BOLLARDS, AND GUARDRAIL FOR THE EXISTING LIQUID OXYGEN TA... | $160,000 | INTERFAITH MEDICAL CENTER |
| May 30, 2019 | 321903712 | Alteration Type II | PERMIT ISSUED - ENTIRE JOB/WORK | FIRE ALARM MODIFICATION TO ACCOMMODATE ALTERATIONS TO THE EXISTING PUMP ROOM IN THE EXISTING HOSPITAL BUILDING AS IND... | $10,000 | INTERFAITH MEDICAL CENTER |
| Mar 4, 2019 | 310090530 | Alteration Type II | SIGNED OFF | PROPOSE TO ALTER EXISTING THIRD FLOOR 10 BEDROOM UNIT, DIALYSIS AND FOURTH FLOOR LAB NEW PARTITIONS, HUNG CEILINGS AN... | $1,500,000 | INTERFAITH MEDICAL CENTER |
| Dec 19, 2018 | 310073577 | Alteration Type II | SIGNED OFF | PROPOSED INTERIOR DEMOLITION IN EXISTING HOSPITAL DEPARTMENTS AT THIRD FLOOR TEN BED UNIT, DIALYSIS/OUT-PATIENT TESTI... | $50,000 | INTERFAITH MEDICAL CENTER |
| Oct 25, 2018 | 310090549 | Alteration Type II | PERMIT ISSUED - ENTIRE JOB/WORK | PROPOSE TO ALTER EXISTING 10 BEDROOM UNIT, DIALYSIS AND FOURTH FLOOR LAB WITH NEW PLUMBING FIXTURES, SPRINKLERS AND H... | $500,000 | INTERFAITH MEDICAL CENTER |
| May 25, 2018 | 310141584 | Alteration Type II | SIGNED OFF | PROPOSE TO ALTER EXISTING SPRINKLER SYSTEM ON THIRD FLOOR 10 BED UNIT, DIALYSIS AND FOURTH FLOOR LAB. NO CHANGE IN US... | $200,000 | INTERFAITH MEDICAL CENTER |
| May 23, 2018 | 320107709 | Alteration Type III | SIGNED OFF | PROPOSE TO REMOVE INTERIOR NON-RATED, NON-COMBUSTIBLE PARTITIONS IN CELLAR OF EAST BUILDING | $20,860 | INTERFAITH MEDICAL CENTER |
| May 23, 2018 | 320017110 | Alteration Type II | SIGNED OFF | PROPOSE TO ALTER EXISTING H.V.A.C. DUCTWORK, REPLACE FAN COIL UNITS ON THE 9TH FLOOR PSYCHIATRIC UNIT, REPLACE DRAIN ... | $400,000 | INTERFAITH MEDICAL CENTER |
| Jan 17, 2018 | 320938241 | Alteration Type II | SIGNED OFF | LEGALIZATION OF TWO GOODMAN AC UNITS LOCATED ON THE SECOND FLOOR ROOF, AND ONE MITSUBISHI AC UNIT LOCATED ON THE SECO... | $6,000 | INTERFAITH MDICAL CENTER |
| Aug 24, 2017 | 320202687 | Alteration Type II | SIGNED OFF | GENERAL CONSTRUCTION TO REMOVE EXISTING PARTITIONS, DOORS, DOOR FRAMES, FINISHES AND CEILING SYSTEMS AND REPLACE WITH... | $150,000 | INTERFAITH MEDICAL CENTER |
| Jul 11, 2017 | 301160801 | Alteration Type II | SIGNED OFF | Install fire suppression system. No change in use, egress or occupancy. | $2,000 | NA |
| Jun 20, 2017 | 302027394 | Alteration Type III | SIGNED OFF | Inst 120 l.f. of sidewalk shed for exterior work. No change in use , egress or occupancy. | $0 | interfaitf hospital |
| Jun 8, 2017 | 320180549 | Alteration Type II | SIGNED OFF | ADDITIONS TO EXISTING, APPROVED FIRE ALARM SYSTEM. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $39,200 | ENGINEERING DEPARTMENT |
| Mar 17, 2017 | 340479556 | Alteration Type II | PERMIT ISSUED - ENTIRE JOB/WORK | CONVERSION OF A WET PIPE SPRINKLER SYSTEM TO A DRY PIPE SPRINKLER SYSTEM FOR THE LOADING DOCK AREA ONLY. NO CHANCE IN... | $8,000 | INTERFAITH MEDICAL CENTER |
| Dec 19, 2016 | 321492817 | Alteration Type II | PERMIT ISSUED - ENTIRE JOB/WORK | INSTALLATION OF COMBINED HEAT AND POWER UNITS WITH ASSOCIATED MECHANICAL WORK PER PLANS. NO CHANGE IN USE, EGRESS, OR... | $1,100,000 | INTERFAITH MEDICAL CENTER |
| Nov 25, 2016 | 340438574 | Alteration Type II | PERMIT ISSUED - ENTIRE JOB/WORK | BL | $0 | INTERFAITH MEDICAL CENTER |
| Mar 4, 2016 | 320466401 | Alteration Type II | SIGNED OFF | THIS APPLICATION IS FILE FOR THE INSTALLATION OF ONE 1200 KW EMERGENCY GENERATOR AND 100 GALLON DAY TANK | $148,000 | INTERFAITH MEDICAL CENTER |
| Feb 3, 2015 | 320978420 | Alteration Type III | SIGNED OFF | INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH 2008 BUILDING CODE CHAPTER 33. NO CHANGE IN USE EG... | $0 | INTERFAITH MEDICAL CENTER C/O AR |
| Feb 3, 2015 | 320978411 | Alteration Type III | SIGNED OFF | INSTALLATION OF DEBRIS CHUTE AS PER PLANS. WORK SHALL COMPLY WITH 2008 BUILDING CODE CHAPTER 33. NO CHANGE IN USE EGR... | $0 | INTERFAITH MEDICAL CENTER C/O AR |
| Dec 29, 2014 | 320901084 | Place of Assembly | PLAN EXAM - APPROVED | — | $0 | INTERFAITH MEDICAL CENTER |
| Nov 12, 2014 | 321027447 | Alteration Type II | PLAN EXAM - APPROVED | WELD ADDITIONAL STEEL BEAMS TO EXISTING STEEL STRUCTURE, ADD CONCRETE STAB FOR PREPARATION OF NEW TRANSFORMER. NO ELE... | $15,000 | INTERFAITH MEDICAL CENTER |
| Sep 19, 2014 | 340188576 | Alteration Type III | PLAN EXAM - IN PROCESS | INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH 2008 BUILDING CODE CHAPTER 33. NO CHANGE IN USE EG... | $0 | ARSENAL SCAFFOLD INC |
| Oct 25, 2013 | 320901093 | Place of Assembly | PLAN EXAM - APPROVED | — | $0 | INTERFAITH MEDICAL CENTER |
| Oct 5, 2012 | 320444989 | Alteration Type II | SIGNED OFF | THIS APPLICATION IS FILED FOR THE INSTALLATION OF ONE CARRIER AIR CONDITIONING 5 TON UNIT ON 9TH FLOOR ROOF, ONE COLD... | $349,650 | INTERFAITH MEDICAL CENTER |
| Feb 14, 2011 | 301131683 | Alteration Type II | SIGNED OFF | INSTALL TWO (2) GAS /0IL FIRED CHILLERS AS PART OF APPLICATION#300843087 NO CHANGE IN EGRESS, USE OR OCCUPANCY | $200 | TURNER CONSTRUCTION CO. |
| Dec 7, 2010 | 320227740 | Alteration Type II | PERMIT ISSUED - ENTIRE JOB/WORK | NEW FIRE PUMP ROOM AND NEW FIRE PUMP IN BASEMENT. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. | $10,000 | INTERFAITH MEDICAL CENTER |
| Sep 17, 2010 | 320089845 | Alteration Type II | SIGNED OFF | FILING FOR PIPE SCAFFOLDING TO INSTALL WINDOW GUARD INTERIOR COURT AREA ONLY. NO CHANGE OF USE EGRESS AND OCCUPANCY. | $0 | ENGINEERING DEPT. |
| May 21, 2010 | 320059921 | Alteration Type II | SIGNED OFF | PARTIAL REMOVAL INTERIOR PARTITIONS HUNG CEILINGS & FINISHES AT 4TH FLOOR EAST WING DISCHARGE LOUNGE. PARTIALLY A... | $93,000 | INTERFAITH MEDICAL CENTER |
| Feb 4, 2010 | 320040497 | Alteration Type III | SIGNED OFF | PROPOSE TO CONSTRUCT INTERIOR NON-RATED, NON-COMBUSTIBLE PARTITIONS IN CELLAR OF EAST BUILDING. | $41,720 | INTERFAITH MEDICAL CENTER |
| Nov 16, 2009 | 302172002 | Alteration Type II | SIGNED OFF | INSTALLATION OF A NEW TEMPORAL '3'INTERIOR FIRE ALARM SYSTEM WITH A CENTRAL OFFICE CONNECTION AS PERPLANS FILED HEREW... | $1,000 | INTERFAITH HOSPITAL C/O ALMA RLT |
| Oct 8, 2009 | 320044180 | Alteration Type II | SIGNED OFF | PROPOSED REPLACEMENT OF HVAC UNIT ON EXISTING DUNNAGE AS INDICATED ON PLANS AND APPLICATIONS. THERE IS NO CHANGE IN U... | $120,000 | INTERFAITH MEDICAL CENTER |
| Sep 30, 2009 | 310113374 | Alteration Type II | PERMIT ISSUED - ENTIRE JOB/WORK | PROPOSE TO MODIFY EXISITING FIRE ALARM SYSTEM. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $40,000 | INTERFAITH MEDICAL CENTER |