Skip to content

DOB violations

873-879 Bedford Avenue, Brooklyn • Block 01750 • Lot 0011

9 records

Violations issued by the Department of Buildings.

Issued Violation Type Category Description Disposed
Nov 14, 2025 00347 HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED V-DOB VIOLATION - ACTIVE VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION
Nov 14, 2025 09999 LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED V-DOB VIOLATION - ACTIVE VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Nov 14, 2025 01160 HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED V-DOB VIOLATION - ACTIVE VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION
Jun 20, 2023 00832 HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED V-DOB VIOLATION - ACTIVE VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION
Jun 20, 2023 40273 LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED V-DOB VIOLATION - ACTIVE VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
Apr 25, 2023 00742 HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED V*-DOB VIOLATION - DISMISSED VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION Dec 26, 2023
Apr 6, 2018 12633 LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED V-DOB VIOLATION - ACTIVE VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
Mar 3, 2015 00857 HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED V-DOB VIOLATION - ACTIVE VIOLATION ISSUED FOR FAILURE TO FILE 2013 ANNUAL HIGH PRESSURE BOILER INSPECTION
Mar 3, 2015 08104 LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED V-DOB VIOLATION - ACTIVE VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT