Lafayette Gardens, Brooklyn
Brooklyn • Block 01938 • Lot 0001 • Zip: 11205
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 6 days ago- Downtown Brooklyn 31 min 13 walking, 18 riding
- Fulton Street 36 min 13 walking, 23 riding
- Union Square 37 min 13 walking, 24 riding
- Grand Central 44 min 13 walking, 31 riding
- Times Square 47 min 13 walking, 34 riding
- Penn Station 48 min 13 walking, 35 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Subway
Railroad
Ferry
Bus
Citi Bike
Places nearby
Place des Fêtes
Trendy wine bar with rustic-chic decor, serving carefully sourced wines & small plates.
Welcome Home
Welcome Home is a cozy and inviting restaurant in Brooklyn, offering a welcoming atmosphere and delicious home-cooked...
Dinner Party
No description yet
Lula Mae
No description yet
Mike's Coffee Shop
Classic diner fare in a down-home corner shop setting, popular with Pratt students & other locals.
Dept. of Culture
West African restaurant
Speedy Romeo
Wood-fired pizzas & Italian fare from an open kitchen set in a former body shop in Clinton Hill.
For All Things Good Bed-Stuy
Snug Mexican restaurant whipping up tacos, quesadillas & antojitos, plus a large wine & mezcal list.
Activity
Sales, filings, permits and violations from every dataset, in one order.
2026
-
HPD violation May 4, 2026
Class A
(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION ...
2025
-
CLASS - 1
FAILURE TO MAINTAIN EXTERIOR FACADE AND APPURTENANCES AT TIME OF INSPECTION OBSERVED BROKEN GLASS AT EXPOSURE#1(NORTH...
-
CLASS - 1
FAILURE TO MAINTAIN. ELEVATORS DEFECTIVE, NOT WORKING. BUILDING IS AN OCCUPIED MULTIPLE DWELLING. NON ADA COMPLIANT.,...
-
DOB violation May 28, 2025
C-CONSTRUCTION OTHER OPTIONAL
FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.AT THE TIME OF I NSPECTION,OBSERVED CRACKS,SPALLING BRICKS AND ...
2024
-
Alteration Type III
INSTALLATION OF (+/-)190 L.FT NEW SIDEWALK SHED AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR...
-
Alteration Type III
INSTALLATION OF 223'-0" HEAVY-DUTY SIDEWALK SHED AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, O...
-
Alteration Type III
INSTALLATION OF 495'-0" HEAVY-DUTY SIDEWALK SHED AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, O...
-
Alteration Type III
INSTALLATION OF 249'-0" HEAVY-DUTY SIDEWALK SHED AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, O...
-
DOB violation Jun 2, 2024
C-CONSTRUCTION OTHER OPTIONAL
STRUCTURE RENDERED NON COMPLIANT. AT TIME OF INSPECTION DMAGE OBSERVED TO HAVE BEEN SUSTAINED TO EXPEOSURE # 2 SECTIO...
-
CLASS - 2
FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9B REPORT CRITICAL OF EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WA...
-
CLASS - 2
FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9B REPORT CRITICAL OF EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WA...
-
CLASS - 2
FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9B REPORT CRITICAL OF EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WA...
-
CLASS - 2
FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9B REPORT CRITICAL OF EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WA...
2023
-
Alteration Type III
REPLACEMENT OF EXISTING RRH UNITS ON ROOF. INSTALLATION OF NEW RRH UNITS IN THE EXISTING EQUIPMENT ROOM IN 1ST FLOOR....
-
DOB violation Feb 22, 2023
FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED
FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023
-
DOB violation Feb 22, 2023
FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED
FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023
-
DOB violation Feb 22, 2023
FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED
FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023
-
DOB violation Feb 22, 2023
FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED
FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023
2022
2019
-
Alteration Type II
INSTALLATION OF NON-EMERGENCY GAS FIRED GENERATOR WITH GAS BOOSTER PUMP ON NEW EQUIPMENT PLATFORM ON ROOF. INSTALLATI...
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Building Permits
Owner information from Department of Buildings filings
Recent Building Permits
Owner information from recent DOB NOW filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records