Skip to content

ECB violations

428 Vanderbilt Avenue, Brooklyn • Block 01959 • Lot 0067

18 records

Environmental Control Board violations, which carry a hearing and a penalty.

Issued Violation Status Severity Description Penalty Balance due Hearing
Apr 22, 2026 39553317L ACTIVE CLASS - 2 TIME OF INSPECTION, OBSERVED POOR HOUSEKEEPING AT REAR YARD (EXP 3) WITH ACCUMULATION OF DEBRIS AND LOOSE MATERIALS O... $2,530 $2,530 Jul 1, 2026
Apr 22, 2026 39553310Z RESOLVE CLASS - 2 AT TIME OF INSPECTION, OBSERVED INTERIOR WORK INCLUDING PAINTING, FIREPLACE REPAIR, AND DOOR INSTALLATION WHILE DOB A... $1,250 $1,250 Feb 18, 2027
Apr 22, 2026 39553320M RESOLVE CLASS - 2 AT TIME OF INSPECTION, OBSERVED CONSTRUCTION FENCE ERECTED AT REAR YARD (EXP 3) WITH EXPIRED DOB PERMIT. FENCE REMAIN... $1,250 $1,250 Feb 18, 2027
Aug 1, 2025 39155756J ACTIVE CLASS - 1 ATOI OF A 3-STORY BLDG IT WAS OBSERVED THAT THE SITE WAS UNDER A FULL STOP WORK ORDER, SINCE-O8/01/2025.BY BADGE: #28... $10,000 $10,000 Dec 8, 2026
Aug 1, 2025 39155767P RESOLVE CLASS - 1 AT TIME OF INSPECTION OBSERVED FOUNDATION AND EARTHWORK, WORK IN PROGRESS UNDER APPLICATION # B00958099-S4 -ST, WITH ... $2,500 $2,500 May 12, 2026
Jul 30, 2025 39155424N RESOLVE CLASS - 2 AT AN ACTIVE 3-STORY JOBSITE, ACCESS WAS DENIED BY GC/WORKERS. MULTIPLE CALLS WERE MADE; PERMIT HOLDER SAID A REP WOU... $1,250 $1,250 May 12, 2026
Jul 18, 2024 39119604M RESOLVE CLASS - 1 AT TIME OF INSPECTION ON AN ACTIVE JOBSITE, OBSERVED STRUCTURAL WORK IN PROGRESS WITHOUT A PERMIT. DID A SEARCH IN BI... $2,500 $2,500 Aug 17, 2026
Jul 18, 2024 39119629Z RESOLVE CLASS - 1 UNAPPROVED/UNSAFE/UNSUITABLE ELECTRICAL EQUIPMENT, APPARATUS, MATERIALS, DEVICES, APPLIANCES OR WIRING IN USE. NOTE:A... $1,600 $1,600 Aug 19, 2025
Jul 18, 2024 39119636R RESOLVE CLASS - 1 OBS DAMAGED/LOOSE BRICK COLUMN SUPPORTING STRUCTURE&FACADE DISLODGED@EXPOSURE 3 W/MAKE SHIFT SUPPORT FOR THE EXPOSED ... $2,500 $2,500 Aug 19, 2025
Jul 18, 2024 35667377N RESOLVE CLASS - 1 WORK DOES NOT CONFORM TO APPROVED DESIGN DRAWINGS.NOTE:AT TIME OF INSPECTION ON A ACTIVE JOBSITE OF A 4 STORY BUILDIN... $2,500 $2,500 Aug 17, 2026
Jul 18, 2024 39119599R RESOLVE CLASS - 1 AT TIME OF INSPECTION ON AN ACTIVE JOBSITE OF A 4 STORY BUILDING, OBSERVED EARTH WORK IN PROGGRESS AT EXPOSURE 3, DID... $2,500 $2,500 Aug 17, 2026
Jul 18, 2024 39119638K RESOLVE CLASS - 1 OBSERVED JOBSITE ACCESSIBLE FROM ADJACENT PROPERTIES W/ LARGE AMOUNTS OF DEBRIS, CONSTRUCTION MATERIALS EXPOSED REBAR... $1,000 $1,000 Aug 19, 2025
Jul 18, 2024 39119575M RESOLVE CLASS - 1 OBSVED DEMOLITION STRUCTURAL WORK,COLUMNS & FACADE DISLODGOMENT @ EXPOURE 3, NOTCHED WOOD BEAMS EXTENDING INTO BEAMS ... $10,000 $10,000 Aug 17, 2026
Jul 18, 2024 39119580R RESOLVE CLASS - 1 AT TIME OF INSPECTION ON AN ACTIVE JOBSITE, OBSERVED INADEQUATE HOUSEKEEPING CONSISTING OF LARGE AMOUNTS OF DEBRIS AN... $2,500 $2,500 Aug 17, 2026
Jul 18, 2024 39119581Z RESOLVE CLASS - 1 AT TIME OF INSPECTION ON AN ACTIVE JOBSITE OF A 4-STORY BUILDING, OBSERVED THAT FIRE EXTINGUISHERS WERE MISSING AT AL... $5,000 $5,000 Aug 17, 2026
Jul 18, 2024 39119584Y RESOLVE CLASS - 2 AT TIME OF INSPECTION ON AN ACTIVE JOBSITE, OBSERVED MATERIAL STORED ON THE STREET, UPON REQUEST FOR DOT PERMITS FOR ... $1,250 $1,250 Aug 17, 2026
Jul 18, 2024 39119586H RESOLVE CLASS - 1 ATOI ON A 4 STORY BLDG. PLUMBING WORK/WAS DONE THROUGHOUT THE ENTIRE PREMISES. UPON REVIEWING. AND DOING A SEARCH ON ... $5,000 $5,000 Aug 17, 2026
Apr 22, 2020 35469299J RESOLVE CLASS - 2 NO ACCESS.AT TIME OF MY INSPECTION ON A 3 STORY BLDG I SAW WORKER CAMEOUT OF THE BLDG & UPON RETURNING TO THE PREMISE... $5,000 -$5,000 Aug 26, 2020