DOB violations
Little Street, Brooklyn • Block 02023 • Lot 0125
18 records
Violations issued by the Department of Buildings.
| Issued | Violation | Type | Category | Description | Disposed |
|---|---|---|---|---|---|
| Jun 20, 2023 | 22964 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION | — |
| Jun 20, 2023 | 08651 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION | — |
| Jun 20, 2023 | 08559 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION | — |
| Nov 8, 2019 | 06688 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT | Nov 21, 2019 |
| Nov 8, 2019 | 06690 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT | Nov 21, 2019 |
| Nov 8, 2019 | 06689 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT | Nov 21, 2019 |
| Jun 22, 2018 | 00194 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED FOR FAILURE TO FILE 2016 ANNUAL HIGH PRESSURE BOILER INSPECTION | Aug 14, 2019 |
| Jun 22, 2018 | 00195 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED FOR FAILURE TO FILE 2016 ANNUAL HIGH PRESSURE BOILER INSPECTION | Aug 14, 2019 |
| Jun 22, 2018 | 00196 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED FOR FAILURE TO FILE 2016 ANNUAL HIGH PRESSURE BOILER INSPECTION | Aug 14, 2019 |
| Jun 23, 2017 | 00213 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED FOR FAILURE TO FILE 2015 ANNUAL HIGH PRESSURE BOILER INSPECTION | Aug 14, 2019 |
| Jun 23, 2017 | 00215 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED FOR FAILURE TO FILE 2015 ANNUAL HIGH PRESSURE BOILER INSPECTION | Aug 14, 2019 |
| Jun 23, 2017 | 00214 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED FOR FAILURE TO FILE 2015 ANNUAL HIGH PRESSURE BOILER INSPECTION | Aug 14, 2019 |
| Dec 16, 2016 | 00175 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED FOR FAILURE TO FILE 2014 ANNUAL HIGH PRESSURE BOILER INSPECTION | Aug 14, 2019 |
| Dec 16, 2016 | 00174 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED FOR FAILURE TO FILE 2014 ANNUAL HIGH PRESSURE BOILER INSPECTION | Aug 14, 2019 |
| Dec 16, 2016 | 00173 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED FOR FAILURE TO FILE 2014 ANNUAL HIGH PRESSURE BOILER INSPECTION | Aug 14, 2019 |
| Mar 3, 2015 | 00608 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED FOR FAILURE TO FILE 2013 ANNUAL HIGH PRESSURE BOILER INSPECTION | Aug 14, 2019 |
| Mar 3, 2015 | 00606 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED FOR FAILURE TO FILE 2013 ANNUAL HIGH PRESSURE BOILER INSPECTION | Aug 14, 2019 |
| Mar 3, 2015 | 00607 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED FOR FAILURE TO FILE 2013 ANNUAL HIGH PRESSURE BOILER INSPECTION | Aug 14, 2019 |