42 Carlton Avenue, Brooklyn
Brooklyn • Block 02030 • Lot 0046 • Zip: 11205
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 4 days ago- Downtown Brooklyn 18 min 6 walking, 12 riding
- Fulton Street 23 min 6 walking, 17 riding
- Penn Station 35 min 6 walking, 29 riding
- Times Square 36 min 6 walking, 30 riding
- Union Square 36 min 6 walking, 30 riding
- Grand Central 40 min 6 walking, 34 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Railroad
Ferry
Bus
Citi Bike
Places nearby
Lula Mae
No description yet
Los Burritos Juarez
No description yet
Los Burritos Juárez
No description yet
Farmer In The Deli
No description yet
Sweet Spot
No description yet
LaRina Pastificio & Vino
LaRina Pastificio & Vino in Brooklyn offers fresh pasta made in-house daily, a diverse selection of wines, and a cozy...
Rosticceria Evelina
No description yet
Saraghina Caffè
No description yet
Activity
Sales, filings, permits and violations from every dataset, in one order.
2025
-
HPD violation Jan 15, 2025
Class B
§ 27-2005, 2006, 2037 HMC: PROPERLY REPAIR AND ABATE UNSAFE ELECTRIC WIRING CONDITION CONSISTING OF EXPOSE ELECTRICAL...
-
HPD violation Jan 15, 2025
Class B
§ 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING AT PUBLIC HALL, 4th STORY
-
HPD violation Jan 15, 2025
Class C
§ 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE .. IN THE EN...
-
HPD violation Jan 15, 2025
Class B
§ 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF HOUSEHOLD ITEMS AT PUBLIC HALL, 4th STORY
-
HPD violation Jan 15, 2025
Class B
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL CEILING AT P...
2024
-
CLASS - 2
FAILURE TO MAINTAIN BUILDING WALL(S) OR APPURTENANCES NOTED: AT TIME OF INSPECTION OBSERVED VISIBLE CRACKS WITH BROKE...
2021
-
HPD violation Dec 15, 2021
Class B
§ 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE BATHROOM LOCATED AT APT 4RAND4, 4th S...
2012
-
CLASS - 2
FAILURE TO MAINTAIN BLDG WALLS OR APPURTENANCES. NOTED AT EXPOSURES 2 & 4 STUCCO FINISH ON BRICK WALL HAS CRACKED IN ...
2011
-
DOB violation Dec 13, 2011
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
-
Alteration Type II
INSTALL 8 NEW BOILERS AS PER PLAN NO CHANGE IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION
-
Alteration Type II
PROPOSED INSTALLATION OF STEEL COLUMNS IN BASEMENT, REPLACING DEFECTIVE PLUMBING AND REPLACING DEFECTIVE WOOD BEAMS W...
2010
-
Alteration Type II
INTERIOR ALTERATION WORK AS PER PLANS HEREWITH FILED. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS ALTERATION.
2009
-
DOB violation Dec 31, 2009
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
-
DOB violation Jan 1, 2009
LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
2008
-
CLASS - 1
FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. NOTED: AT THE BASEMENT LEVEL THE CEILING IS MISSING IN SEVERAL...
-
DOB violation Sep 22, 2008
C-CONSTRUCTION OTHER OPTIONAL
-
DOB violation Jan 3, 2008
LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
2007
-
DOB violation Jan 19, 2007
LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
2006
-
Alteration Type II
PLACEING SCAFFOLDING,REMOVING BROKEN STUCCO,BROKEN BRICKWORK...REPAIRING MORTAR JOINTS,BRICKS,REPLACING STUCCOSKIN TO...
-
Non-Hazardous
FAILURE TO MAINTAIN EXTERIOR BLDG. BRICK HAS DETEREATED ON NORTH & SOUTH SIDE WITH CEMENT COATING MISSING/& FALLING O...
-
Non-Hazardous
FAILURE TO MAINTAIN EXTERIOR BLDG. WALL. NOTED: NORTHWALL BRICKS CRACKED MORTAR MISSING. EAST WALL (FRONT) LINTEL COR...
-
Hazardous
FAILURE TO MAINTAIN EXTERIOR BLDG. NOTED: HAZARDOUS CEMETITIOUS MATERIAL AND PIECES OF BRICK ARE FALLING THE SOUTH SI...
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Registration Contracts
Contact information from multiple dwelling registrations
Building Permits
Owner information from Department of Buildings filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records