ECB violations
Myrtle Avenue, Brooklyn • Block 02034 • Lot 0134
30 records
Environmental Control Board violations, which carry a hearing and a penalty.
| Issued | Violation | Status | Severity | Description | Penalty | Balance due | Hearing |
|---|---|---|---|---|---|---|---|
| Dec 9, 2022 | 37024478X | RESOLVE | CLASS - 2 | FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9A REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WA... | $0 | $0 | Apr 26, 2023 |
| May 2, 2022 | 38274428X | RESOLVE | CLASS - 2 | 97X10 REPAIR AND RESTORE TO SERVICE. | $625 | $0 | Apr 19, 2023 |
| Sep 16, 2019 | 39009586K | RESOLVE | CLASS - 1 | AT TIME OF MY INSPECTION I OBSERVED THAT FOR JOB # 340510316 THERE HAVE NOT BEEN INSPECTIONS FOR THE STANDPIPE., PERF... | $0 | $0 | Feb 19, 2021 |
| Jan 16, 2019 | 35380893L | RESOLVE | CLASS - 1 | BC3301.4 FAILURE TO PERFORM INSPECTION FOR TEMPORARY CONSTRUCTION EQUIPMENT (SAFETY STRAPS) NOTED: AT TIME OF INSPECT... | $625 | $0 | Dec 2, 2019 |
| Jan 16, 2019 | 35380895P | RESOLVE | CLASS - 2 | FAILURE TO MAINTAIN DOCUMENTS ON SITE/LOGS AT TIME OF INSPECTION I OB SERVED/SUSPENDED SCAFFOLDS IN USE. UPON REQUEST... | $625 | $0 | Dec 4, 2019 |
| Jan 16, 2019 | 35380894N | RESOLVE | CLASS - 2 | FAILURE TO PERFORM INSTALLATION REPORTS (POST AND PRE-INSTALLATION)FORTHE SUSPENDED SCAFFOLD. AT TIME OF INSPECTION I... | $625 | $0 | Dec 2, 2019 |
| Oct 12, 2018 | 35363163P | RESOLVE | CLASS - 1 | SEC. 3308.6 HORIZONTAL NETTING OS OUT OF SEQUENCE. AT TIME OF INSPECTION AT ACTIVE JOB SITE AT 18TH FL OBSERVED THE H... | $625 | $0 | Apr 17, 2019 |
| Oct 12, 2018 | 35363162N | RESOLVE | CLASS - 1 | SEC. 3301.12 PRE-SHIFT SAFETY NETTINGS. AT TIME OF INSPECTION ON A ACTIVE JOBSITE OF A 18 STY BLDG,OBSERVED CONSTRUCT... | $625 | $0 | Apr 15, 2019 |
| Oct 12, 2018 | 35363168Y | RESOLVE | CLASS - 1 | SEC. 3314.4.3 SUSPENDED SCAFFOLD-DAILY LOG BOOK. AT TIME OF INSPECTIONON A ACTIVE JOBSITE OF A 18 STY BLDG OBSERVED W... | $625 | $0 | Apr 17, 2019 |
| Oct 12, 2018 | 35363167M | RESOLVE | CLASS - 1 | SEC. 3304.7 MEANS OF EGRESS AT TIME OF INSPECTION OF ACTIVE JOB SITE 18TH STY. OBSERVED LACK OD EGRESS IN THE 17TH & ... | $625 | $0 | Apr 17, 2019 |
| Oct 12, 2018 | 35363166K | RESOLVE | CLASS - 1 | UNDER DOES NOT CONFORM TO APPROVED PLANS/DESIGN DRAWINGS(SUSPENDED SCAFFOLD)AT TIME OF INSPECTION ON A ACTIVE JOBSITE... | $625 | $0 | Apr 17, 2019 |
| Oct 12, 2018 | 35363165Z | RESOLVE | CLASS - 1 | SEC. 3308.5.3 CABLE SYSTEM(GUARDRAILS)AT TIME OF INSPECTION OF ACTIVE JOB SITE 18TH STY AT EXP#1 OBSERVED CABLE SYSTE... | $625 | $0 | Apr 17, 2019 |
| Oct 12, 2018 | 35363164R | RESOLVE | CLASS - 1 | SEC. 3301.2 HOLES LARGE THAN 2 INCHES W/O PROPER PROTECTION. AT TIME OF INSPECTION ON A ACTIVE JOB SITE OF A 18 STY B... | $625 | $0 | Apr 17, 2019 |
| Sep 10, 2018 | 35305942Z | RESOLVE | CLASS - 2 | RESPONDENT FAILED TO MAKE PROPER NOTIFICATION FOR MOBILE CRANE TO THE DEPT. AT TIME OF INSPECTION,AS PER 3319-01(C)(5... | $2,500 | $0 | Mar 11, 2019 |
| Aug 28, 2018 | 35353283K | RESOLVE | CLASS - 1 | SEC. 3308.6 HORIZONTAL SAFETY NETTING. NOTE: AT THE TIME OF MY INSPECTION OF A 18 STY BLDG AT 16TH FL LEVEL CONSTRUCT... | $2,500 | $0 | Jun 27, 2019 |
| Aug 28, 2018 | 35353281R | RESOLVE | CLASS - 1 | FAILURE TO PERFORM HYDROSTATIC PRESSURE TEST-STANDPIPE.NOTE:AT THE TIME OF INSPECTION OF A 18 STORY BUILDING AT 16TH ... | $0 | $0 | Jun 26, 2019 |
| Aug 28, 2018 | 35353282Z | RESOLVE | CLASS - 2 | FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES AND TEMPORARY CONSTRUCTION.NOTE:AT THE TIME OF INSPECTION OF ... | $0 | $0 | Jun 27, 2019 |
| Aug 28, 2018 | 35353284M | RESOLVE | CLASS - 1 | WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS & OR APPROVED AMENDMENTS. NOTE: AT THE TIME OF MY INSPECTION... | $625 | $0 | Jun 27, 2019 |
| Jul 31, 2018 | 35343486L | RESOLVE | CLASS - 1 | HOUSEKEEPING. AT TIME OF INSPECTION ON A ACTIVE JOBSITE,CURRENTLY AT 13 STY LEVEL,OBSERVED INADEQUATE HOUSEKEEPING FR... | $0 | $0 | Dec 18, 2018 |
| Jul 31, 2018 | 35343485J | RESOLVE | CLASS - 1 | SEC. 3308.6 HORIZONTAL NETTING NOT ADEQUATE. AT TIME OF INSPECTION ON A ACTIVE JOBSITE CURRENTLY AT 13 STY LEVEL,OBSE... | $2,500 | $0 | Dec 18, 2018 |
| Jul 31, 2018 | 35343484H | RESOLVE | CLASS - 1 | SEC. 3301.2 FAILURE TO MAINTAIN REBAR CAPS. AT TIME OF INSPECTION ON AACTIVE JOBSITE CURRENTLY AT 13 STY LEVEL,OBSERV... | $2,500 | $0 | Dec 18, 2018 |
| Jul 31, 2018 | 35343483X | RESOLVE | CLASS - 1 | SEC. 3304.7 REQUIRED MEANS OF EGRESS. AT TIME OF INSPECTION ON A ACTIVE JOBSITE CURRENTLY FRAMING 13 STY,OBSERVED THA... | $625 | $0 | Dec 17, 2018 |
| Jul 19, 2018 | 35342967H | RESOLVE | CLASS - 1 | FAILURE TO SAFEGUARD(PUBLIC). @ TIME OF INSP FOR A COMPLAINT OF SCHOOL BUS HITTING CRANE UPON INSP OBSERVED SCHOOL BU... | $0 | $0 | Apr 1, 2019 |
| Jun 20, 2018 | 35336084N | RESOLVE | CLASS - 2 | FAILURE TO INSTITUTE AND MAINTAIN SAFETY EQUIPMENT MEASURES AND TEMPORARY CONSTRUCTION. NOTE: AT THE TIME OF MY INSPE... | $0 | $0 | Oct 22, 2018 |
| Jun 20, 2018 | 35336085P | RESOLVE | CLASS - 1 | BC3308.6 HORIZONTAL NETTING SYSTEM. NOTE: AT THE TIME OF MY INSPECTION OF A 18 STORY BUILDING AT 8FL LEVEL, CONSTRUCT... | $0 | $0 | Oct 24, 2018 |
| Apr 21, 2018 | 35326686L | RESOLVE | CLASS - 1 | SEC. 3307.6.4.6 DECK. NOTE: AT THE TIME OF MY INSPECTION OF A 18 STY BLDG AT 2ND FL,CONSTRUCTION WOKR IN PROGRESS. I ... | $625 | $0 | Jun 25, 2018 |
| Mar 1, 2018 | 35318027H | RESOLVE | CLASS - 1 | WORK CONTRARY TO SITE SAFETY PLANS.AT TIME OF INSPECTION OF AN 18 STORY NB,CURRENTLY IN FOUNDATION,PHASE,I OBSERVED A... | $1,000 | $0 | Mar 29, 2018 |
| Mar 1, 2018 | 35318026X | RESOLVE | CLASS - 1 | BC3301.6.NO DESIGN DRAWINGS FOR WASHOUT BOX AT TIME OF INSPECTION A 18STORY BUILDING UNDER CONSTRUCTION AT FOUNDATION... | $1,600 | $0 | Mar 19, 2018 |
| Dec 13, 2017 | 35300883P | RESOLVE | CLASS - 1 | BC3301.2:ADEQUATE MEANS OF EGRESS.NOTE:AT TIME OF INSPECTION OF A 18 STORY BLDG AT PARTIAL EXCAVATION AND FOUNDATION ... | $1,600 | $0 | Mar 23, 2018 |
| Dec 13, 2017 | 35300882N | RESOLVE | CLASS - 1 | NO DESIGNATED CONCRETE SAFETY MANAGER PRESENT AT SITE AS REQD.NOTE:AT TIME OF INSPECTION OF A 18 STORY BLDG AT PARTIA... | $1,200 | $0 | Mar 12, 2018 |