189 Dekalb Avenue, Brooklyn
Brooklyn • Block 02090 • Lot 0001 • Zip: 11205
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 6 days ago- Downtown Brooklyn 18 min 6 walking, 12 riding
- Fulton Street 23 min 6 walking, 17 riding
- Penn Station 35 min 6 walking, 29 riding
- Times Square 36 min 6 walking, 30 riding
- Union Square 36 min 6 walking, 30 riding
- Grand Central 40 min 6 walking, 34 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Subway
Railroad
Ferry
Bus
Citi Bike
Places nearby
Strange Delight
Strange Delight is a quirky and eclectic shop in Brooklyn offering a unique blend of vintage finds, handmade goods, a...
Sailor
Sailor is a cozy neighborhood spot in Brooklyn offering a unique blend of food, drinks, and entertainment. Enjoy craf...
Dinner Party
No description yet
Lula Mae
No description yet
Roman's
Hip, vintage-chic neighborhood spot preparing locally sourced New American small plates.
Colonia Verde
Colonia Verde is a charming restaurant in Brooklyn offering a cozy atmosphere with a focus on seasonal, farm-to-table...
Los Burritos Juarez
No description yet
Mike's Coffee Shop
Classic diner fare in a down-home corner shop setting, popular with Pratt students & other locals.
Activity
Sales, filings, permits and violations from every dataset, in one order.
2026
-
Alteration Type II
SUBSEQUENT FILING FOR PLUMBING, MECHANICAL, SPRINKLER WORK AS PER PLAN
2025
-
DOB violation Nov 14, 2025
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
2024
-
DOB violation Sep 23, 2024
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
2023
-
DOB violation Jun 30, 2023
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
-
DOB violation Jun 30, 2023
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
-
DOB violation Jun 20, 2023
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
-
DOB violation Jun 20, 2023
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
2021
-
Alteration Type II
REMOVAL OF INTERIOR FINISHES, FLOORS, NON-LOAD BEARING WALLS, PLUMBING FIXTURES, FLOORING, MECHANICAL EQUIPMENT AT CE...
-
Alteration Type II
REMOVAL OF INTERIOR FINISHES, FLOORS, NON-LOAD BEARING WALLS, PLUMBING FIXTURES, FLOORING, MECHANICAL EQUIPMENT. NO C...
-
Alteration Type III
INSTALLATION OF SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHE...
-
Alteration Type II
APPLICATION FILED FOR LOWERING OF EXISTING CELLAR SLAB; COLUMN REMOVAL AND RE-SUPPORT AT 2ND FLOOR; FLOOR JOIST REPAI...
2020
-
Alteration Type II
APPLICATION FILED FOR RENOVATION OF STOREFRONT AS PER PLANS. NO CHANGE TO USE EGRESS OR OCCUPANCY UNDER THIS APPLICAT...
2019
2008
-
Hazardous
SECOND OFFENSE #34610970K EXIT DOOR TOTAL OBSTRUCTION. NOTED: EXIT DOOR OF GROUND FLOOR RESTAURANT IS BLOCKED BY THE ...
2007
-
Non-Hazardous
EXIT DOOR TOTAL OBSTRUCTION NOTED: THE EXIT DOOR TOTALLY OBSTRUCTED BYA TABLE ON THE DEKALB SIDE OF PREMISES IN THE R...
2003
1988
-
Unknown
WORK WITHOUT A PERMIT. REMEDY: FIEL APPLICATION AND OBTAIN A PERMIT.
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Building Permits
Owner information from Department of Buildings filings
Recent Building Permits
Owner information from recent DOB NOW filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records