DOB violations
Williamsburg St West, Brooklyn • Block 02186 • Lot 0001
255 records
Violations issued by the Department of Buildings.
| Issued | Violation | Type | Category | Description | Disposed |
|---|---|---|---|---|---|
| Jan 26, 2018 | 07212 | ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | V*-DOB VIOLATION - DISMISSED | VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST | Aug 5, 2019 |
| Jan 26, 2018 | 07213 | ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | V-DOB VIOLATION - ACTIVE | VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST | — |
| Jan 26, 2018 | 07214 | ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | V-DOB VIOLATION - ACTIVE | VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST | — |
| Jan 26, 2018 | 07919 | ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | V*-DOB VIOLATION - DISMISSED | VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST | Jun 4, 2019 |
| Jan 26, 2018 | 07921 | ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | V-DOB VIOLATION - ACTIVE | VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST | — |
| Jan 17, 2018 | LL30119KD | C-CONSTRUCTION OTHER OPTIONAL | V-DOB VIOLATION - ACTIVE | OWNER FAILED TO SUBMIT ACCEPTABLE 6&7 CYCLES EXTERIOR WALLS AND APPURTENANCE CRITICAL EXAMINATION TECHNICAL REPORT FI... | — |
| Jan 17, 2018 | LL30120KD | C-CONSTRUCTION OTHER OPTIONAL | V-DOB VIOLATION - ACTIVE | OWNER FAILED TO SUBMIT ACCEPTABLE 6&7 CYCLES EXTERIOR WALLS AND APPURTENANCE CRITICAL EXAMINATION TECHNICAL REPORT FI... | — |
| Jan 12, 2018 | 9027/617643 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | Dec 16, 2022 |
| Jan 12, 2018 | 9027/617641 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | Dec 16, 2022 |
| Jan 12, 2018 | 9027/617642 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | Dec 16, 2022 |
| Nov 29, 2017 | FEU30101FF | C-CONSTRUCTION OTHER OPTIONAL | V-DOB VIOLATION - ACTIVE | FTM GARAGE.MAJORITY OF STEEL PLATES LOC BELOW POST TENSION BEAMS AT COLUMNS/FOUND WALLS HAVE SIGNS OF CORROSION&ARE I... | — |
| Nov 29, 2017 | FEU30102FF | C-CONSTRUCTION OTHER OPTIONAL | V-DOB VIOLATION - ACTIVE | FTM 2 LEVELS BELOW GRADE GARAGE.MAJORITY OF STEEL PLATES LOC BELOW POST TENSION BEAMS OF COLUMNS/FOUND WALLS HAVE SIG... | — |
| Aug 2, 2017 | 00340 | BENCH-FAILURE TO BENCHMARK NONE | V-DOB VIOLATION - ACTIVE | FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 | — |
| Jun 28, 2017 | 00462 | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | V-DOB VIOLATION - ACTIVE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION | — |
| Jun 28, 2017 | 00461 | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | V-DOB VIOLATION - ACTIVE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION | — |
| Jun 28, 2017 | 00469 | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | V-DOB VIOLATION - ACTIVE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION | — |
| Jun 28, 2017 | 00468 | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | V-DOB VIOLATION - ACTIVE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION | — |
| May 2, 2017 | 00686 | BENCH-FAILURE TO BENCHMARK NONE | V-DOB VIOLATION - ACTIVE | FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 | — |
| Feb 16, 2017 | 00190 | EARCX-FAILURE TO SUBMIT EER NONE | V-DOB VIOLATION - ACTIVE | FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 IN 2016 | — |
| Jan 25, 2017 | 00529 | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | V-DOB VIOLATION - ACTIVE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION | — |
| Jan 17, 2017 | LL30121KD | C-CONSTRUCTION OTHER OPTIONAL | V-DOB VIOLATION - ACTIVE | OWNER FAILED TO SUBMIT ACCEPTABLE 6&7 CYCLES EXTERIOR WALLS AND APPURTENANCE CRITICAL EXAMINATION TECHNICAL REPORT FI... | — |
| Jan 5, 2017 | 9027/589693 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | Dec 16, 2022 |
| Jan 5, 2017 | 9027/589692 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | Oct 17, 2017 |
| Feb 3, 2016 | 9027/563595 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | Apr 20, 2016 |
| Feb 3, 2016 | 9027/563593 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | Apr 20, 2016 |
| Feb 3, 2016 | 9027/563597 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | Apr 20, 2016 |
| Feb 3, 2016 | 9027/563596 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | Apr 20, 2016 |
| Feb 3, 2016 | 9027/563594 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | Apr 20, 2016 |
| Feb 2, 2016 | 9027/563591 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | Jul 13, 2017 |
| Feb 2, 2016 | 9027/563592 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | Jul 27, 2016 |
| Feb 2, 2016 | 9027/563590 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | Jul 13, 2017 |
| Oct 7, 2015 | 00405 | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | V*-DOB VIOLATION - DISMISSED | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION | Oct 20, 2016 |
| Oct 1, 2015 | 05992 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT | — |
| Mar 3, 2015 | 12702 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT | — |
| Mar 3, 2015 | 12701 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT | Jul 23, 2024 |
| May 15, 2014 | 12951 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT | Jul 23, 2024 |
| Jan 15, 2014 | 01765 | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | V*-DOB VIOLATION - DISMISSED | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION | Jun 5, 2014 |
| Jan 6, 2014 | 9027/498626 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | Jul 8, 2014 |
| Jan 6, 2014 | 9027/498629 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | Jul 8, 2014 |
| Jan 6, 2014 | 9027/498627 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | Jul 8, 2014 |
| Jan 6, 2014 | 9027/498628 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | Jul 9, 2014 |
| Dec 16, 2013 | 9027/497281 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | Jul 8, 2014 |
| Jan 31, 2013 | 01233 | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | V-DOB VIOLATION - ACTIVE | FAILED TO FILE FISP CYCLE 7A TECHNICAL REPORT BY 02/21/2012 | — |
| Jan 31, 2013 | 01255 | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | V-DOB VIOLATION - ACTIVE | FAILED TO FILE FISP CYCLE 7A TECHNICAL REPORT BY 02/21/2012 | — |
| Jan 31, 2013 | 01253 | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | V-DOB VIOLATION - ACTIVE | FAILED TO FILE FISP CYCLE 7A TECHNICAL REPORT BY 02/21/2012 | — |
| Jan 31, 2013 | 01240 | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | V-DOB VIOLATION - ACTIVE | FAILED TO FILE FISP CYCLE 7A TECHNICAL REPORT BY 02/21/2012 | — |
| Jan 31, 2013 | 01234 | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | V-DOB VIOLATION - ACTIVE | FAILED TO FILE FISP CYCLE 7A TECHNICAL REPORT BY 02/21/2012 | — |
| Jan 3, 2013 | 9027/460508 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | Jan 23, 2014 |
| Jan 3, 2013 | 9027/460507 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | Jan 23, 2014 |
| May 3, 2012 | 02015 | BENCH-FAILURE TO BENCHMARK NONE | V-DOB VIOLATION - ACTIVE | FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 | — |