ECB violations
223 Lee Avenue, Brooklyn • Block 02236 • Lot 0007
8 records
Environmental Control Board violations, which carry a hearing and a penalty.
| Issued | Violation | Status | Severity | Description | Penalty | Balance due | Hearing |
|---|---|---|---|---|---|---|---|
| Jan 2, 2019 | 39001041Y | ACTIVE | CLASS - 2 | #7#8 BOILERS IN 5TH FLOOR LEFT BOILER ROOM=SAFETY DISCHARGE PIPES+ BACKFLOW ARE NOT PIPED DOWN-THERE ARE WIRES EXPOSE... | $3,125 | $3,125 | Feb 25, 2019 |
| Jan 2, 2019 | 39001042X | ACTIVE | CLASS - 2 | #3 BOILER IN APT 5R=WIRES ARE EXPOSED-THE FLOOR DRAIN IS CLOGGED-THE BACKFLOW IS NOT PIPED DOWN+ STORAGE IN BOILER RO... | $3,125 | $3,125 | Feb 25, 2019 |
| Jan 2, 2019 | 39001043H | ACTIVE | CLASS - 2 | #5+#6 BOILERS IN 5TH FLOOR RIGHT BOILER ROOM=STORAGE+ DEBRIS IN ROOM-THE LIGHT IS DEFECTIVE-CO DETECTOR IS DEFECTIVE-... | $3,125 | $3,125 | Feb 25, 2019 |
| Jan 2, 2019 | 39001040M | ACTIVE | CLASS - 2 | #1 BOILER BASEMENT RIGHT SIDE=WIRES ARE EXPOSED-CEILING IS OPEN-STORAGE+DEBRIS IN BOILER ROOM, CORRECT VIOLATING COND... | $3,125 | $3,125 | Feb 25, 2019 |
| Nov 12, 2010 | 34835918K | RESOLVE | CLASS - 2 | FAILURE TO SAFEGUARD ALL PERSONS & PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS NOTED: JOBSITE GATE FOR FENCE OPENS T... | $0 | $0 | Jul 18, 2011 |
| Nov 10, 2010 | 34875170X | RESOLVE | CLASS - 1 | FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES-NO HANDRAILS.NOTED:@ TIME OF INSP NO HANDRAILS @ ALL LEVELS-E... | $1,000 | $0 | Jan 3, 2011 |
| May 11, 2010 | 34769304N | RESOLVE | CLASS - 1 | SEC-BC3301.7-FAILURE TO PROVIDE DESIGN DRAWING.NOTE:PLATFORM @ 5TH FL LEVEL ABOVE STAIRWAY IS BEING USED TO ACCESS RO... | $1,600 | $0 | Jul 12, 2010 |
| Apr 19, 2009 | 34741505P | RESOLVE | CLASS - 1 | FAILURE TO SAFEGUARD ALL PERSONS AND PROP AFFECTED BY CONST OPERATIONSAREA AFFECTED PARAPET SECTION OF SIDEWALK SHED ... | $2,400 | $0 | Jun 8, 2009 |