ECB violations

78 Bartlett Street, Brooklyn • Block 02273 • Lot 0002

23 records

Environmental Control Board violations, which carry a hearing and a penalty.

Issued Violation Status Severity Description Penalty Balance due Hearing
May 26, 2026 39554644N ACTIVE CLASS - 2 STOP ALL WORK ENTIRE SITE. DURING MY INSPECTION OF A 4 STORY NEW BUILDING. I SPOKE TO AN INDIVIDUAL WHO REFUSED TO AL... $2,500 $2,500 Sep 9, 2026
May 26, 2026 39554645P ACTIVE CLASS - 2 I OBSERVED MULTIPLE CRACKS AND UNEVEN SLABS IN THE CONCRETE SIDEWALK AT EXPOSURE ONE, PRESENTING A TRIP AND FALL HAZA... $2,500 $2,500 Sep 9, 2026
Jul 17, 2025 35693941Y ACTIVE CLASS - 2 TEMPORARY CONSTRUCTION EQUIP/INSTALLATION ONSITE EXPIRED PERMIT "SIDEWALK SHED". AS NOTED: AT TIME OF INSPECTION SITE... $1,250 $1,250 Jan 21, 2027
May 27, 2025 39540666R ACTIVE CLASS - 2 AT TIME OF INSPECTION OBSERVED: SIDEWALK SHED IN PLACE EXPO# 1 WITH PERMIT# B00752210-I1-SH UPON REVIEW DEPARTMENT RE... $1,250 $1,250 Dec 14, 2026
Feb 27, 2025 39139846N RESOLVE CLASS - 2 FAILURE TO CERTIFY CORRECTIONS FOR PREVIOUS VIOLATION : 39064428R, FILE A CERTIFICATE OF CORRECTION $3,155 $3,155 Jul 6, 2026
Aug 14, 2024 39531397N ACTIVE CLASS - 2 AT TIME OF INSPECTION OBSERVED A PROPOSED 4 STORY NB. UPON INSPECTING OBSERVED SIDEWALK SHED ERECTED AT EXPO #1 PERMI... $1,280 $1,280 Oct 8, 2026
Aug 14, 2024 39531396L ACTIVE CLASS - 2 AT TIME OF INSPECTION OBSERVED A PROPOSED 4 STORY NB. UPON INSPECTING OBSERVED CONSTRCUTION FENCE ERECTED AT EXPO #1,... $1,280 $1,280 Oct 8, 2026
Sep 15, 2023 39521790K RESOLVE CLASS - 2 AT THE TIME OF INSPECTION I OBSERVED CONSTRUCTION FENCE IN PLACE.I SEARCHED ON DOB SYSTEM AND APPEARED THAT PERMIT # ... $3,125 $3,125 Nov 22, 2023
May 25, 2023 39517058H RESOLVE CLASS - 2 4 STORY NB, CLOSED SITE UNDER 2 SWO FOR FLOOR COLLAPSE AND NO OHP, I OBSERVED FENCE AT EXP1 AND 2. UPON VIEWING THE F... $3,125 $3,125 Feb 26, 2024
Apr 14, 2023 39515367M RESOLVE CLASS - 2 OBSERVED CONSTRUCTION FENCE INSTALLED AT EXP#1&2, UPON REVIEW THE DEPARTMENT RECORDS ( BIS& DOB NOW) OBSERVED THAT CO... $3,125 $3,125 Jun 21, 2023
Mar 30, 2023 39514820R ACTIVE CLASS - 2 4 STORY NB, I OBSERVED CLOSED SITE UNDER 2 SWO FOR CFS FLOOR COLLAPSE. SIDEWALK SHED(SWS) AT EXP1 HAS A MISSING PANEL... $10,000 $10,000 Jun 7, 2023
Mar 10, 2023 35670419J ACTIVE CLASS - 2 TEMPORARY CONSTRUCTION EQUIPMENT ON SITE-EXPIRED PERMIT.AS NOTED:AT TIME OF INSPECTION CONSTRUCTION SITE CLOSED OBSER... $6,250 $6,250 May 17, 2023
Sep 27, 2022 35664112Y RESOLVE CLASS - 2 WORK W/O A PERMIT(CONSTRUCTION PLYWOOD FENCE PERMIT EXPIRED). AS NOTED:AT TIME OF INSPECTION CONST SITE WAS CLOSED. O... $3,125 $3,125 Mar 1, 2023
Jun 21, 2022 39502468Z RESOLVE CLASS - 1 I OBSERVED CONSTRUCTION SITE IS AT 2ND FLOOR LEVEL AND 2ND FLOOR DECK COLLAPSE IN THE MIDDLE, THERE WERE NO SIDEWALK ... $12,500 $12,500 Oct 26, 2022
Jun 21, 2022 39502466P RESOLVE CLASS - 1 I OBSERVED CONSTRUCTION SITE IS AT 2ND FLOOR LEVEL AND 2ND FLOOR DECK COLLAPSE IN THE MIDDLE, THERE WERE NO OVERHEAD ... $6,250 $6,250 Oct 26, 2022
Jun 20, 2022 39064428R RESOLVE CLASS - 1 SECOND FLOOR OVERLOADED WITH CONCRETE BLOCK AND MORTAR CAUSING STEEL AND CONCRETE DECK TO PARTIALLY COLLAPSE AND DAMA... $12,500 $12,500 Oct 26, 2022
Sep 27, 2021 35563074J RESOLVE CLASS - 1 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#35507193X ISSUED ON 4/17/21 AND TO FIL... $6,250 $6,250 Jul 18, 2022
Sep 17, 2021 35536412J RESOLVE CLASS - 2 FAILURE TO COMPLY WITH COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION #35555228N ISSUED ON 07/19/21 AND TO FILE ... $3,125 $3,125 Jul 18, 2022
Jul 19, 2021 35555228N RESOLVE CLASS - 1 UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF A STOP WORK ORDER.NOTED OBSERVED NEW CMU BLOCKS WERE INSTALLED AT RIGHT ... $5,000 $0 Sep 9, 2022
Apr 19, 2021 35551705Z RESOLVE CLASS - 1 WORK W/O PERMIT NOTE:@TIME OF MY INSP OF 1STYBLDG THAT HAS BEEN DEMO,IOBSERVED CONST FENCE@EXP1,2 THAT HAS BEEN INSTA... $0 $0 May 16, 2022
Apr 19, 2021 35551704R ACTIVE CLASS - 1 FAILURE TO SAFEGUARD ALL PROPERTY AFFECTED BY CONST OPERATION NOTE:@TIME OF MY INSP OF 1STYBLDG W/NO CONST WORK IN PR... $1,250 $1,250 Dec 19, 2022
Apr 19, 2021 35551706K RESOLVE CLASS - 1 WORK W/O PERMIT NOTE:@TIME OF MY INSP OF 1STY W/NEW CONST WORK IN PROGRESS,I OBSERVED@EXP3 COMPLETED FOUNDATION WALL&... $2,500 $0 May 16, 2022
Apr 17, 2021 35507193X RESOLVE CLASS - 1 WORK W/O PERMIT ATOI OBSERVED 1STY STRUCTURE THAT HAS BEEN APPROX50% DEMOD,&NEW FOUNDATION ERECTED ALONG W/CONST FENC... $2,500 $0 Dec 6, 2021