483 Driggs Avenue, Brooklyn
Brooklyn • Block 02306 • Lot 0007 • Zip: 11211
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 4 days ago- Union Square 19 min 5 walking, 14 riding
- Downtown Brooklyn 28 min 5 walking, 23 riding
- Grand Central 30 min 5 walking, 25 riding
- Times Square 31 min 5 walking, 26 riding
- Fulton Street 32 min 5 walking, 27 riding
- Penn Station 33 min 5 walking, 28 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Subway
Railroad
Ferry
Bus
Citi Bike
Places nearby
The Four Horsemen
The Four Horsemen is a trendy wine bar in Brooklyn offering a curated selection of natural wines. With a cozy and int...
Kellogg's Diner
Kellogg's Diner is a classic American diner serving up delicious comfort food 24/7. Located in the heart of Brooklyn,...
Socceria
No description yet
Lalaon
No description yet
Le Crocodile
Le Crocodile is a chic French brasserie located in Brooklyn, NY. Known for its classic French cuisine, elegant decor,...
Bamonte's
No description yet
St. Anselm
St. Anselm is a trendy, unpretentious eatery serving up delicious grilled meats and seafood in a cozy, rustic setting...
Lilia
Lilia is a charming Italian restaurant in Brooklyn known for its fresh handmade pasta, delicious wood-fired dishes, a...
Available to rent
1 listing on the market in this building, from the feeds Hoodkit aggregates.
-
Unit 4B $5,900
Activity
Sales, filings, permits and violations from every dataset, in one order.
2026
-
ALT-CO - New Building with Existing Elements to Remain
Approved
-
Alteration Type III
BUILDERS PAVEMENT PLAN FILED IN CONJUNCTION WITH NB B00987942-I1 TOTAL STREET FRONTAGE IS 25'.
2025
-
DOB violation Nov 14, 2025
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
-
ALT-CO - New Building with Existing Elements to Remain
Approved
-
ALT-CO - New Building with Existing Elements to Remain
Approved
-
ALT-CO - New Building with Existing Elements to Remain
Approved
-
ALT-CO - New Building with Existing Elements to Remain
Approved
-
ALT-CO - New Building with Existing Elements to Remain
Approved
2024
-
CLASS - 2
PROPOSED HORIZONTAL & VERTICAL EXTENSION ,INTERIOR RENOVATION TO EXISTING TWO STORY WITH CELLAR MIX USE BUILDING. OBS...
-
CLASS - 2
PROPOSED HORIZONTAL & VERTICAL EXTENSION ,INTERIOR RENOVATION TO EXISTING TWO STORY WITH CELLAR MIX USE BUILDING. OBS...
-
CLASS - 2
PROPOSED HORIZONTAL AND VERTICAL EXTENSION ,INTERIOR RENOVATION TO AN EXISTING 2 STORY BUILDING WITH CELLAR MIX USE B...
-
CLASS - 2
PROPOSED HORIZONTAL & VERTICAL EXTENSION ,INTERIOR RENOVATION TO EXISTING TWO STORY WITH CELLAR MIX USE BUILDING. OBS...
2023
-
DOB violation Jun 30, 2023
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
-
DOB violation Jun 30, 2023
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
-
DOB violation Jun 20, 2023
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
-
DOB violation Jun 20, 2023
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
-
DOB violation Apr 25, 2023
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
2021
-
CLASS - 2
MASONRY CHIMNEY FLUE MISSING CLEANOUT AS PER FGC 501.15.3; FGC MISC, COMPLY WITH NOTICE OF VIOLATION; COMPLY WITH NOT...
2015
-
Alteration Type III
BNP 15- 078; FRONTAGE:25 LINEAR FEET; NB:320929947. NO CHANGE IN USE, OCCUPANCY OR EGRESS AS SHOWN ON DRAWINGS FILED ...
-
Alteration Type II
INSTALLATION OF NEW AUTOMATIC/HEAT DETECTION AND SPRINKLER FIRE ALARM SYSTEM ON CEL, 001-005, ROF. IN CONJUNCTION WIT...
2014
-
New Building
FILING FOR MECHANICAL,PLUMBING AND SPRINKLER FOR NEW FIVE (5) STORY BUILDING. AS SHOWN ON DRAWINGS FILED HEREWITH.
2012
-
Alteration Type I
CHANGE OF USE AT SECOND FLOOR FROM OFFICES TO APARTMENT . LEGALIZATION OF BATH ROOMS AND SINK, ALL AS PER PLANS FILED...
1999
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Building Permits
Owner information from Department of Buildings filings
Recent Building Permits
Owner information from recent DOB NOW filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records