ECB violations
338-342 South 3 Street, Brooklyn • Block 02437 • Lot 0011
29 records
Environmental Control Board violations, which carry a hearing and a penalty.
| Issued | Violation | Status | Severity | Description | Penalty | Balance due | Hearing |
|---|---|---|---|---|---|---|---|
| Apr 20, 2026 | 37036626R | ACTIVE | CLASS - 2 | FAILURE TO FILE ACCEPTABLE AMENDED CYCLE 8B REPORT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL FA... | $3,155 | $3,155 | Jul 22, 2026 |
| Oct 1, 2025 | 39162046K | ACTIVE | CLASS - 2 | FAILURE TO COMPLY WITH COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH DEPARTMENT OF BUILDING FOR SUMMO... | $6,250 | $6,250 | Dec 10, 2025 |
| Oct 1, 2025 | 39162049X | ACTIVE | CLASS - 2 | FAILURE TO COMPLY WITH COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH DEPARTMENT OF BUILDING FOR SUMMO... | $6,250 | $6,250 | Dec 10, 2025 |
| Oct 1, 2025 | 39162050N | ACTIVE | CLASS - 1 | FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER FOR SUMMONS 39148650X. OBSERVED THAT THE DETERIORATION OF THE W... | $25,000 | $25,000 | Dec 10, 2025 |
| Oct 1, 2025 | 39162047M | ACTIVE | CLASS - 2 | FAILURE TO COMPLY WITH COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH DEPARTMENT OF BUILDING FOR SUMMO... | $6,250 | $6,250 | Dec 10, 2025 |
| Oct 1, 2025 | 39162048Y | ACTIVE | CLASS - 1 | FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER FOR SUMMONS 39148651H. THE C-CLAMP STILL REMAINS ONTO THE PARAP... | $25,000 | $25,000 | Dec 10, 2025 |
| Jul 1, 2025 | 35668478R | ACTIVE | CLASS - 1 | WORK WITH PERMIT: AT TIME OF INSPECTION OBSERVED AT ROOF LEVEL 3 SECTIONS OF ROOF APPROXIMATELY 3' WIDE 25 FEET IN LE... | $12,500 | $12,500 | Sep 10, 2025 |
| May 21, 2025 | 39148651H | ACTIVE | CLASS - 1 | ATOI OBSERVED C CLAMP STILL INSTALLED AT THE PARAPET WALL AT THE ROOF. FAILURE TO MAINTAIN AND SECURE PUBLIC. FACADE ... | $12,500 | $12,500 | Aug 6, 2025 |
| May 21, 2025 | 39148650X | ACTIVE | CLASS - 1 | ATOI OBSERVED MISCELLANEOUS CRACKS IN THE WALL AND CEILINGS IN APARTMENT D3 AND D7. FAILURE TO MAINTAIN BUILDING IN A... | $12,500 | $12,500 | Aug 6, 2025 |
| Apr 14, 2025 | 39144782J | ACTIVE | CLASS - 2 | FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. AT TIME OF INSPECTION OBSERVED MULTIPLE CRACKS THROUGHOUT AP... | $6,250 | $6,250 | Jun 18, 2025 |
| Apr 10, 2025 | 35716693N | ACTIVE | CLASS - 1 | FAILURE TO PROVIDE UNOBSTRUCTED EXIT PASSAGEWAY. NOTED: AT EXP 1(N. ELEV) OBJECTS ARE OBSERVED AT FIRE ESCAPES AT MUL... | $6,250 | $6,250 | Jun 18, 2025 |
| Dec 30, 2024 | 35687067X | ACTIVE | CLASS - 2 | FAILURE TO MAINTAIN BUILDING EXTERIOR FACADE AND APPURTENANCES. NOTED:OBSERVED AT EXP 2(E. ELEV) THERE ARE SPALLING M... | $6,250 | $6,250 | Mar 5, 2025 |
| Dec 30, 2024 | 35687066Y | ACTIVE | CLASS - 1 | FAILURE TO PROVIDE UNOBSTRUCTED EXIT PASSAGEWAY. NOTED: OBSERVED, AT TIME OF INSPECTION, THERE OBJECTS AT FIRE ESCAPE... | $6,250 | $6,250 | Mar 5, 2025 |
| Apr 11, 2024 | 37028048Y | ACTIVE | CLASS - 2 | FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9B REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WA... | $1,250 | $1,250 | Aug 21, 2024 |
| Jan 16, 2024 | 37026116H | ACTIVE | CLASS - 2 | FAILURE TO FILE ACCEPTABLE AMENDED CYCLE 8B REPORT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL FA... | $3,125 | $3,125 | May 8, 2024 |
| May 18, 2023 | 39516783X | ACTIVE | CLASS - 2 | AT TIME OF INSPECTION OF A 6 STORY BUILDING OBSERVE SIDEWALK SHED IN PLACE WITH ACTIVE PERMIT AT EXPOSURE #1 NOT UP T... | $10,000 | $10,000 | Jul 26, 2023 |
| Oct 6, 2022 | 39071599R | ACTIVE | CLASS - 1 | FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENTS. AT TIME OF INSPECTION OBSERVED AT ROOF LEVEL APPR... | $12,500 | $12,500 | Feb 8, 2023 |
| Oct 6, 2022 | 39071600P | ACTIVE | CLASS - 1 | NO RECORD OF DAILY INSPECTION OF SUSPENDED SCAFFOLD PERFORMED. AT TIME OF INSPECTION OBSERVED 2 SUSPENDED SCAFFOLDING... | $25,000 | $25,000 | Feb 8, 2023 |
| Oct 6, 2022 | 39071601R | ACTIVE | CLASS - 2 | FAILED TO NOTIFY DEPARTMENT PRIOR TO INSTALLATION OR REMOVAL OF SUSPENDED SCAFFOLD. AT TIME OF INSPECTION OBSERVED AT... | $10,000 | $10,000 | Feb 8, 2023 |
| Oct 6, 2022 | 39071602Z | ACTIVE | CLASS - 2 | FAILURE TO SAFE GUARD ALL PERSONS AND PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS. AT TIME OF INSPECTION OBSERVED ON... | $10,000 | $10,000 | Feb 8, 2023 |
| Oct 6, 2022 | 39071597N | ACTIVE | CLASS - 2 | REQUIRED TRAINING FOR SUSPENDED SCAFFOLDING: USER CARD. AT TIME OF INSPECTION OBSERVED " BERNARDO CORO BUNAY ON SUSPE... | $6,250 | $6,250 | Feb 8, 2023 |
| Oct 6, 2022 | 39071596L | ACTIVE | CLASS - 1 | UNSAFE STORAGE OF COMBUSTIBLE MATERIAL AND EQUIPMENT. AT TIME OF INSPECTION OBSERVED COMBUSTIBLE KEROSENE FIRED HEATI... | $12,500 | $12,500 | Feb 8, 2023 |
| Oct 6, 2022 | 39071598P | ACTIVE | CLASS - 2 | FAILURE TO ENSURE EACH WORKER IS IN COMPLIANCE WITH 3321.1. AT TIME OF INSPECTION OBSERVED " BERNARDO" "MARIA SARA" A... | $10,000 | $10,000 | Feb 8, 2023 |
| Feb 2, 2022 | 35632944K | ACTIVE | CLASS - 2 | 3314.4 UNSAFE SUPPORTED SCAFFOLD.AT TIME OF MY INSPECTION OF A 6 STORYBUILDING,OBSERVED SUPPORTED SCAFFOLD INSTALLED ... | $6,250 | $6,250 | Sep 21, 2022 |
| Dec 16, 2021 | 35638898X | ACTIVE | CLASS - 2 | TEMPORARY CONSTRUCTION EQUIPMENT ON SITE-EXPIRED PERMIT.AT THE TIME OFMY INSPECTION OF A SIDEWALK SHED ERECTED AT THE... | $6,250 | $5,944 | Apr 27, 2022 |
| Dec 16, 2021 | 35638893R | ACTIVE | CLASS - 1 | BC3309.11 FAILURE TO PROTECT OR ADEQUATELY ADJOINING TREE DURING CONSTRUCTION OPERATIONS.AT THE TIME OF MY INSPECTION... | $12,500 | $12,500 | Apr 27, 2022 |
| Dec 16, 2021 | 35638895K | ACTIVE | CLASS - 2 | FAILURE TO PROVIDE SIDEWALK SHED PARAPET PANEL.AT THE TIME OF MY INSPECTION OF A SIDEWALK SHED AT THE ABOVE ADDRESS.I... | $6,250 | $6,250 | Apr 27, 2022 |
| Oct 8, 2021 | 37022435R | ACTIVE | CLASS - 2 | FAILURE TO FILE ACCEPTABLE AMENDED CYCLE 8B REPORT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL FA... | $1,250 | $1,250 | May 11, 2022 |
| Dec 11, 2007 | 32055495H | RESOLVE | Non-Hazardous | B4A,32A,50A,B,C.50A-FLUE PIPE NOT PROPERLY SEALED TO CHIMNEY.50B-CHECKVALVE MISSING ON FEED WATER LINE.50C-OIL LINE L... | $2,500 | $0 | Feb 4, 2008 |