215 Green Street, Brooklyn
Brooklyn • Block 02513 • Lot 0029 • Zip: 11222
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 2 days ago- Union Square 30 min 8 walking, 22 riding
- Grand Central 31 min 8 walking, 23 riding
- Times Square 34 min 8 walking, 26 riding
- Downtown Brooklyn 34 min 8 walking, 26 riding
- Penn Station 39 min 8 walking, 31 riding
- Fulton Street 39 min 8 walking, 31 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Subway
Railroad
Ferry
Bus
Citi Bike
Places nearby
Gigi's
No description yet
Arthur
No description yet
Sailor & Siren
No description yet
Wenwen
Taiwanese restaurant
Radio Bakery
Bakery
Taqueria Ramirez
Mexican
Bagel Joint
No description yet
Frijoleros
No description yet
Activity
Sales, filings, permits and violations from every dataset, in one order.
2023
-
HPD violation Mar 31, 2023
Class A
(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION ...
2022
-
HPD violation Jul 12, 2022
Class C
§ 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICAT...
-
HPD violation Jul 12, 2022
Class C
HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2F, 2nd ...
-
HPD violation Jul 12, 2022
Class C
HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2F, 2nd STO...
-
HPD violation Jul 12, 2022
Class B
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WALLS AND CEILING I...
2021
-
Alteration Type II
-
HPD violation Apr 20, 2021
Class A
(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION ...
-
DOB violation Apr 6, 2021
E-ELEVATOR ELEVATORREQUIRED
2020
-
DOB violation Mar 25, 2020
E-ELEVATOR ELEVATORREQUIRED
2019
-
DOB violation Mar 6, 2019
E-ELEVATOR ELEVATORREQUIRED
2018
-
New Building
STRUCTURAL / FOUNDATION / S.O.E. / SHORING / UNDERPINNING DRAWINGS FILED WORK ON FLOOR(S): ROF 001 THRU 006
-
Alteration Type II
INSTALLATION OF AUTOMATIC SMOKE/HEAT DETECTION & SPRINKLER FIRE ALARM SYSTEM IN CONJUNCTION WITH NB #320908915
-
Alteration Type III
PROPOSED INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
-
Alteration Type III
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2017
-
CLASS - 1
SEC. 3307.4.7 WORK & STORAGE ZONE. NOTE: AT THE TIME OF MY INSPECTION OF A 6 STY BLDG AT ROOF LEVEL,CONSTRUCTION WORK...
-
CLASS - 1
SEC. 3303.4.2 CONTAINERS. NOTE: AT THE TIME OF MY INSPECTION OF A 6 STY BLDG AT ROOF LEVEL,SITE CLOSED. I OBSERVED A ...
-
CLASS - 1
SEC. 3307.4.7 WORK & STORAGE ZONES. NOTE: AT THE TIME OF MY INSPECTIONOF A 6 STY BLDG AT ROOF LEVEL,SITE CLOSED. I OB...
-
CLASS - 1
SEC. 3307.4 WARNING SIGNS,PERSONNEL & BARRIERS. NOTE: AT THE TIME OF MY INSPECTION OF A 6 STY BLDG AT ROOF LEVEL,SITE...
-
CLASS - 1
SEC. 3307.2.6 REQUIREMENTS FOR SIDEWALK.TEMPORARY WALKWAY,FOOT BRIDGES& PATHWAYS. NOTE: AT THE TIME OF MY INSPECTION ...
-
CLASS - 1
SEC. 3303.3 WATCHPERSON. NOTE: AT THE TIME OF MY INSPECTION OF A 6 STY BLDG AT ROOF LEVEL,SITE CLOSED. KNOCK ON FENCE...
2015
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Registration Contracts
Contact information from multiple dwelling registrations
Building Permits
Owner information from Department of Buildings filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records