144 West Street, Brooklyn
Brooklyn • Block 02531 • Lot 0001 • Zip: 11222
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 3 days ago- Union Square 30 min 8 walking, 22 riding
- Grand Central 31 min 8 walking, 23 riding
- Times Square 34 min 8 walking, 26 riding
- Downtown Brooklyn 34 min 8 walking, 26 riding
- Penn Station 39 min 8 walking, 31 riding
- Fulton Street 39 min 8 walking, 31 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Subway
Railroad
Ferry
Bus
Citi Bike
Places nearby
Activity
Sales, filings, permits and violations from every dataset, in one order.
2025
-
HPD violation Mar 11, 2025
Class A
§ 27-2046.1 HMC: POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY THE COM...
-
HPD violation Mar 11, 2025
Class A
§ 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR...
-
HPD violation Mar 11, 2025
Class A
§ 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR...
-
HPD violation Mar 11, 2025
Class A
§ 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE ...
-
HPD violation Mar 11, 2025
Class A
§ 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING R...
2023
-
HPD violation Mar 31, 2023
Class A
(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION ...
2021
-
New Building
CURB CUT SUBSEQUENT WORK TYPE FILED IN CONNECTION WITH NEW BUILDING APPLICATION.
-
Alteration Type III
FILING HEREWITH FENCE WORK TYPE IN CONJUNCTION WITH NEW BUILDING #320909479. NO CHANGE IN USE, EGRESS OR OCCUPANCY IN...
-
Alteration Type III
FILING HEREWITH BUILDERS PAVEMENT PLAN WITH TOTAL STREET FRONTAGE OF 150 LINEAR FEET. BPP PLANS FILED IN CONJUNCTION ...
-
Alteration Type II
INSTALLATION OF AUTOMATIC SMOKE/HEAT/CO DETECTION AND SPRINKLER FIRE ALARM SYS TEM.
-
Alteration Type II
INSTALL NEW SPRINKLER SYSTEM IN CONJUNCTION WITH NEW BUILDING JOB 320909479. NO CHANGE IN USE, EGRESS, AND OCCUPANCY ...
-
Alteration Type III
INSTALLATION OF DEBRIS CHUTE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2020
-
CLASS - 2
AT TIME OF ENERGY CODE COMPLIANCE INSPECTION, I OBSERVED THAT THERE WERE NO COMPLETE DOB APPROVED PLANS AT SITE( MISS...
-
CLASS - 1
FAILURE TO PROVIDE SIDEWALK SHED WHERE REQUIRED.AT TIME OF INSPECTION OF A 7 STORY NB CURRENTLY AT ROOF LEVEL I OBSER...
-
CLASS - 1
PROVISION OF LAW:BC3308.2.3.1 TEMPORARY LIGHTING.AT TIME OF INSPECTIONOBSERVED NO LIGHTING IN STAIRWAY 1ST FL TO ROOF...
-
CLASS - 1
GUARD RAILS.GUARD RAILS AT WINDOWS USING STUDS INSTEAD OF 2X4 WOOD OR CABLE SYSTEM AS INDICATED INCODE.ALSO OBSERVED ...
-
CLASS - 1
FAILED TO COMPLY WITH DOT PERMIT STIPULATION.AT TIME OF INSPECTION OBSERVED SIDEWALK CLOSURE AT WEST ST.WITH 40 SIUGN...
-
CLASS - 2
FAILURE OF PERMIT HOLDER TO PROVIDE INSPECTION ACCESS TO AND/OR EXPOSEONGOING CONSTRUCTION OR WORK ON AN ACTIVE AND P...
2018
-
DOB violation Feb 23, 2018
C-CONSTRUCTION OTHER OPTIONAL
BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPED UNDER PERMIT3
-
DOB violation Jan 24, 2018
AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
-
DOB violation Jan 24, 2018
AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
-
DOB violation Jan 24, 2018
AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
-
DOB violation Jan 24, 2018
AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2017
-
DOB violation Oct 28, 2017
C-CONSTRUCTION OTHER OPTIONAL
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Registration Contracts
Contact information from multiple dwelling registrations
Building Permits
Owner information from Department of Buildings filings
Recent Building Permits
Owner information from recent DOB NOW filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records