70 Greenpoint Avenue, Brooklyn
Brooklyn • Block 02562 • Lot 0017 • Zip: 11222
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 3 days ago- Union Square 30 min 8 walking, 22 riding
- Grand Central 31 min 8 walking, 23 riding
- Times Square 34 min 8 walking, 26 riding
- Downtown Brooklyn 34 min 8 walking, 26 riding
- Penn Station 39 min 8 walking, 31 riding
- Fulton Street 39 min 8 walking, 31 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Subway
Railroad
Ferry
Bus
Citi Bike
Places nearby
Gigi's
No description yet
Arthur
No description yet
Socceria
No description yet
Kelang
No description yet
Sailor & Siren
No description yet
Wenwen
Taiwanese restaurant
Three Decker Diner
Diner
Radio Bakery
Bakery
Activity
Sales, filings, permits and violations from every dataset, in one order.
2025
-
HPD violation Nov 20, 2025
Class I
§27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27...
-
HPD violation Jul 23, 2025
Class B
§ 27-2005, 2007 ADM CODE AND DEPT. RULES AND REGULATIONS. REMOVE THE ENCUMBRANCE OBSTRUCTING EGRESS FROM FIRE ESCAPES...
-
HPD violation Jul 18, 2025
Class B
§ 27-2005, 2007 ADM CODE AND DEPT. RULES AND REGULATIONS. REMOVE THE ENCUMBRANCE OBSTRUCTING EGRESS FROM FIRE ESCAPES...
2024
-
HPD violation Apr 10, 2024
Class A
(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION ...
2023
-
HPD violation Dec 7, 2023
Class C
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CL...
-
HPD violation Mar 23, 2023
Class A
(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION ...
2021
2020
-
Alteration Type II
COMPLETE RENOVATION OF APT 3F. NEW SKIM COAT,NEW FLOORING,NEW APPLIANCES, NEW KITCHEN CABINETS, NEW COUNTERTOP, NEW W...
-
Alteration Type II
APT 2F RENOVATION, WINDOWS AND DOORS REPLACEMENT, SKIM COAT/SHEETROCK WORK, NEW FLOORING INSTALLATION, NEW KITCHEN CA...
2019
-
Alteration Type II
COMPLETE RENOVATION OF APT. 4F, NEW PLASTER, SKIM COAT, RETILING, NEW FLOOR, NEW KITCHEN CABINETS, NEW DOORS, NEW WIN...
-
Alteration Type II
RENOVATION OF EX. APT 2R, WINDOW REPLACEMENT, DOOR REPLACEMENT, SELECTIVE PLASTERING, BATHROOM RETAILING, KITCHEN RET...
-
Alteration Type II
TOTAL RENOVATION OF EX. APT 4R. WINDOW REPLACEMENT, DOOR REPLACEMENT, SELECTIVE PLASTERING, BATHROOM RETAILING, KITCH...
2018
2009
2007
-
Alteration Type II
EST COST $60,000 1ST FL REAR EXT.TO EXISTING COMMERCIAL USE.NO CHANGE TO USE,EGRES OR OCC.PROPOSED ADDITIONAL FL AREA...
2006
2005
-
Hazardous
FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING. NOTE IN REAR YARD HUGE PILEOF CONSTRUCTION DEBRIS SUCH AS WOOD WITH PROTRU...
2003
-
DOB violation Mar 19, 2003
LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Registration Contracts
Contact information from multiple dwelling registrations
Building Permits
Owner information from Department of Buildings filings
Recent Building Permits
Owner information from recent DOB NOW filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records