Skip to content

ECB violations

75 Calyer Street, Brooklyn • Block 02571 • Lot 0034

11 records

Environmental Control Board violations, which carry a hearing and a penalty.

Issued Violation Status Severity Description Penalty Balance due Hearing
May 20, 2026 35721834Y RESOLVE CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT THE TIME OF INSPECTION AT THE FRONT OF THE ABOVE ADDRESS OB... $0 $0 Aug 5, 2026
Jan 17, 2026 39549264P RESOLVE CLASS - 2 OBSERVATION: GAINED ACCESS TO OPEN SITE (YELLED OUT OF MY PRESENTS ONSITE) NO WORKERS ON SITE. VIOLATING CONDITION OB... $5,000 $5,000 Feb 23, 2027
Sep 19, 2024 39532554M RESOLVE CLASS - 1 OBSERVED: EXCAVATION @ EXPOSURE 3 APPROX. 7 FEET IN DEPTH W/ SHEAR CUTS @ EXPOSURES 2, 3 & 4 AND POSSIBLE UNDEMINED @... $2,500 $2,500 Aug 25, 2026
Sep 19, 2024 39532555Y RESOLVE CLASS - 1 OBSERVED EXCAVATION @ EXPOSURE 3 APPROX. 7 FEET IN DEPTH, UPON REQUEST FOR VIBRATING/ OPTICAL/ MONITORING REPORTS FOR... $5,000 $5,000 Aug 25, 2026
Sep 19, 2024 39532556X RESOLVE CLASS - 1 OBSERVED EXCAVATION @ EXPOSURE 3 REAR APPROX. 7 FEET IN DEPTH BELOW ADJACENT PROPERTIES FOUNDATION & POSSIBLE UNDERMI... $5,000 $5,000 Aug 25, 2026
Sep 19, 2024 39532564X RESOLVE CLASS - 1 OBSERVED OCCUPANCY OF THE STREET @ EXPOSURE 1 W/ SCATTERED CONSTRUCTION MATERIALS OCCUPYING THE STREET W/ PROPER SIGN... $5,000 $5,000 Aug 25, 2026
Sep 19, 2024 39532573H RESOLVE CLASS - 1 OBSERVED THAT NO PROTECTION WAS PROVIDED FOR ADJACENT PROPERTIES @ EXPOSURES 2 & 4 WHILE PARTIAL FACADE BRICK WAS REM... $5,030 $5,030 Aug 25, 2026
Sep 19, 2024 39532565H RESOLVE CLASS - 1 OBSERVED SIDEWALK SHED INSTALLED @ EXPOSURE 1 NOT FULLY CONVERING THE ENTRACE FOR ADJACENT PROPERTIES @ EXPOSURES 1 &... $0 $0 Feb 5, 2026
Sep 19, 2024 39532575L RESOLVE CLASS - 1 OBSERVED EXCAVATION @ EXPOSURE 3 APPROX. 7 FEET DEEP W/ SHEAR CUTS @ EXPOS 2, 3 & 4 AND POSSIBLE UNDERMINED @ EXPOS 2... $5,000 $5,000 Feb 5, 2026
Sep 19, 2024 39532568N RESOLVE CLASS - 1 OBSERVED SIDEWALK SHED INSTALLED @ EXPOSURE 1 NOT FULLY CONVERING THE ENTRACE FOR ADJACENT PROPERTIES @ EXPOSURES 1 &... $0 $0 Feb 5, 2026
Sep 19, 2024 39532549H RESOLVE CLASS - 1 VERTICAL AND HORIZONTAL ADDITION AND RENOVATION TO EXISTING 3 STORY BUILDING . OBSERVED: EXCAVATION @ EXPOSURE 3 APPR... $2,500 $2,500 Aug 25, 2026