Skip to content

ECB violations

172 Richardson Street, Brooklyn • Block 02735 • Lot 0004

111 records

Environmental Control Board violations, which carry a hearing and a penalty.

Issued Violation Status Severity Description Penalty Balance due Hearing
Aug 16, 2023 39092739M RESOLVE CLASS - 2 OBSERVED ON FLOORS FROM CELLAR TO THE SEVEN FLOOR INSTALLED A SPRINKLER SYSTEM. NINETY PERCENT OF THE WORK COMPLETED ... $1,250 $1,250 Jul 14, 2025
Aug 11, 2023 39520483X RESOLVE CLASS - 2 NEW BUILDING, ACTIVE SITE AND PERMIT , CP PRESENT UPON REQUEST FOR SWS PERIODIC INSPECTION LETTER NONE WAS PROVIDED /... $0 $0 Oct 10, 2024
Aug 11, 2023 39520482Y RESOLVE CLASS - 2 NEW BUILDING; ACTIVE SITE AND PERMIT CP PRESENT UPON INSPECTION NOTED WORK CONTRARY TO APPROVED CONSTRUCTION DOCUMENT... $625 $0 May 20, 2024
Mar 29, 2023 35670743L RESOLVE CLASS - 2 TEMPORARY CONSTRUCTION EQUIPMENT ON SITE-EXPIRED PERMIT.AS NOTED:AT TIME OF INSPECTION ON ACTIVE CONSTRUCTION SITE OB... $1,250 $1,250 Feb 5, 2024
Mar 17, 2023 39514236H RESOLVE CLASS - 1 WEATHERPROOF INTEGRITY OF ADJOINING BUILDINGS: AT TIME OF RESPONDING COMPLAINT OBSERVED: GC FAILURE TO PROVIDE PROTEC... $2,500 $0 Mar 11, 2024
Jan 31, 2023 39512405K RESOLVE CLASS - 1 A WORKER WAS IN AN AREA THAT HAD A CAZ SIGN HIGH UP, BUT WAS NOT BARRICADED OFF TO PREVENT ACCESS. THE WORKER WAS NOT... $2,500 $2,500 Sep 21, 2026
Jan 31, 2023 39512404Z RESOLVE CLASS - 1 AN ACTIVE JOBSITE WITH SUPPORTED SCAFFOLD MATERIAL STORED IN FRONT OF A WINDOW, WERE A WORKER PLACED A LADDER TO CAUL... $2,500 $2,500 Sep 21, 2026
Oct 25, 2022 39508214X RESOLVE CLASS - 1 AT THE TIME OF MY INSPECTION OF A 7 STORY BUILDING I OBSERVED CHIMNEY ON ADJACENT PROPERTY ROOF AT EXP#2 ON 6 STORY B... $0 $0 Jun 22, 2023
Oct 25, 2022 39508197N RESOLVE CLASS - 1 AT THE TIME OF MY INSPECTION RESPONDING TO THE INCIDENT WHERE WORKER WILSON SARMIENTO FELL FROM THE LADDER I OBSERVED... $1,250 $0 Jun 22, 2023
Oct 25, 2022 39508198P RESOLVE CLASS - 1 AT THE TIME OF MY INSPECTION RESPONDING TO THE INCIDENT WHERE WORKER WILSON SARMIENTO FELL FROM THE LADDER I OBSERVED... $625 $0 Jun 22, 2023
Oct 25, 2022 39508212M RESOLVE CLASS - 1 AT THE TIME OF MY INSPECTION RESPONDING TO THE INCIDENT WERE WORKER WILSON SARMIENTO FELL FROM THE A LADDER INSPECTIO... $0 $0 Jun 22, 2023
Oct 24, 2022 39508107K RESOLVE CLASS - 2 ACTIVE CONSTRUCTION SITE, WORK ON THE FACADE, AND CMU WORKS IN PROGRESS THE CONTRACTOR'S SHEDS AND OFFICES NOT CONFOR... $0 $0 Mar 1, 2023
Oct 24, 2022 39508103N RESOLVE CLASS - 2 ACTIVE CONSTRUCTION SITE, WORK ON THE FACADE, AND CMU WORK IN PROGRESS AT EXP#2 ALSO OBSERVED SUPPORTED SCAFFOLD ON T... $0 $0 Mar 1, 2023
Oct 24, 2022 39508104P RESOLVE CLASS - 2 ACTIVE CONSTRUCTION SITE, APPROVED PLANS DO NOT SHOW/ INDICATE A SUPPORTED SCAFFOLD AT EXP#4 ON THE COURTYARD, APPROX... $0 $0 Mar 1, 2023
Oct 24, 2022 39508106Z RESOLVE CLASS - 2 ACTIVE CONSTRUCTION SITE, WORK ON THE FACADE, AND CMU WORKS IN PROGRESS WHEN ASKED FOR PERIODIC INSPECTION (3307.6.5.... $0 $0 Mar 1, 2023
Aug 2, 2022 39504468H RESOLVE CLASS - 1 AAT THE TIME OF MY INSPECTION PROPOSED 7STORY NEW BUILDING CONSTRUCTION IN PROGRESS OBSERVED SUPPORTED SCAFFOLDS AT A... $2,500 $0 Aug 4, 2023
Jul 18, 2022 39503684H RESOLVE CLASS - 1 I OBSERVED ACTIVE CONSTRUCTION SITE AND AT EXP. #4 THERE WERE NO OVERHEAD PROTECTION ON TOP OF ROOF. ROOF HAVE CHAIRS... $625 $0 Jan 11, 2023
Jul 17, 2022 39066070K RESOLVE CLASS - 1 WORK WITHOUT PERMIT. AT TIME OF INSPECTION SUPPORTED SCAFFOLD INSTALLED AT EXPOSURE #1 WITH NO PERMITS ON FILE., OBTA... $1,250 $1,250 Nov 16, 2022
Jun 1, 2022 35651319Z RESOLVE CLASS - 1 BC10905.6.3.2 FAILURE TO REMOVE STRENGTH TESTING CYLINDER STORE FOR PERIOD UP TO 48HRS.AS NOTED:ATOI ON ACTIVE CONST ... $625 $0 Oct 26, 2022
May 4, 2022 35647423R RESOLVE CLASS - 2 FAILURE TO MAINTAIN/DISPLAY ONSITE DOCS REQUIRED BY BCCH33.AS NOTED:ATOI ON ACTIVE CONST SITE I OBSERVED@EXP1(GRAHAM ... $0 $0 Sep 28, 2022
Dec 18, 2021 35583292X RESOLVE CLASS - 2 TEMP CONST EQUIPMENT EXPIRED PERMIT ATOI IN RESPONSE TO COMPLAINT OBSERVED SWS INSTALLED@EXP1-444GRAHAM EXP2-172RICHA... $625 $0 Apr 27, 2022
Sep 28, 2021 35506342X RESOLVE CLASS - 1 BC3301.6 FAILURE TO PROVIDE APPROVED DESIGN DRAWING FOR TEMP EQUIPMENT.ATOI OF 7STYNB OBSERVED@STAIRCASE SHAFT THERE ... $625 $0 Sep 26, 2022
Sep 28, 2021 35506344J RESOLVE CLASS - 1 WORK DOESNT CONFORM TO APPROVED CONST DOCS OR APPROVED AMENDMENTS.ATOIOF 7STYB OBSERVED@ELEVATOR SHAFT WAS PLATFORM U... $625 $0 Sep 26, 2022
Sep 28, 2021 35506343H RESOLVE CLASS - 1 BC3309.2 LIC TO ENTER ADJ PROPERTY ATOI OF 7STYB OBSERVED@ROOF LEVEL EXP2 WORK BEING DONE ON ROOF PLATFORM OBSERVED S... $2,500 $0 Sep 26, 2022
Sep 21, 2021 35583013Y RESOLVE CLASS - 1 ERECTED OR INSTALLED SUPPORTED SCAFFOLD 40' OR HIGHER W/O PERMIT. NOTE:AT THE TIME OF MY INSPECTION AT 7 STORY NEW BU... $5,000 $0 Feb 2, 2022
Aug 25, 2021 35585486N RESOLVE CLASS - 1 BC3307.4.7 WORK OR STORAGE ZONE NOTE:ATOI OF PROPOSED 7STYNB,ACTIVE JOBSITE W/FORMWORK OF 5STY ROOF BEING PREPARED,I ... $250 $0 Oct 14, 2022
Aug 25, 2021 35585485L RESOLVE CLASS - 1 BC3303.11 STAIRS DURING CONST OR DEMO NOTE:ATOI OF PROPOSED 7STYNB@FORMWORK OF 5STY ROOF LEVEL ACTIVE JOBSITE,BLDG AB... $625 $0 Oct 14, 2022
Aug 4, 2021 35585439K RESOLVE CLASS - 1 BC3305151-ALL CONCRETE WASHOUT WATER SHALL BE CONTAINED IN PREMANUFACTURED WATERTIGHT CONTAINERS-STOP ALL CONCRETE OP... $625 $0 Apr 14, 2022
Aug 4, 2021 35585437R RESOLVE CLASS - 1 WORK WITHOUT PERMIT/EXPIRED PERMIT.STOP ALL WORK ON ENTIRE SITE PROVIDED VALID PERMIT.NOTE:AT THE TIME OF MY INSPECTI... $625 $0 Jan 12, 2022
Aug 4, 2021 35585438Z RESOLVE CLASS - 1 FAILURE TO COMPLY WITH MANUFACTURES SPECIFICATIONS STOP ALL ALL USE OFSTORAGE AREA,AMEND SSP REFLECT BARRICADES UNDER... $625 $0 Jan 12, 2022
Aug 4, 2021 35585440H RESOLVE CLASS - 1 WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AMEND SIDEWALK SHED DRAWING TO REFLECT WHATS ON THE SITE.NOT... $625 $0 May 20, 2022
Aug 4, 2021 35585441J RESOLVE CLASS - 1 STORAGE ZONE WHERE STORAGE RELATED TO THE CONSTRUCTION OF A BUILDING IS OCCURING ADJACENT TO A SIDEWALK SHED AREA MUS... $625 $0 May 20, 2022
May 28, 2021 35557191H RESOLVE CLASS - 2 BC3301.13.1 INADEQUATE SITE SAFETY PLANS.ATOI@7STYNB UNDER CONST I OBSERVED CONST IN PROGRESS 1FL STRUCTURAL WORK.UPO... $625 $0 Apr 14, 2022
May 28, 2021 35557190X RESOLVE CLASS - 2 BC3309.14 PROTECTION OF WINDOWS.NOTED:@TIME OF MY INSP OF NEW7STYBLDG,CONST IN PROGRESS@GRNDFL LEVEL,I OBSERVED@REAR ... $0 $0 Oct 6, 2021
May 28, 2021 35557192J RESOLVE CLASS - 1 UNSAFE STORAGE OF COMBUSTIBLE MATERIAL&EQUIPMENT.ATOI@7STYNB UNDER CONST I OBSERVED CONST ACTIVITY IN PROGRESS.@EXP3 ... $2,500 $0 Apr 14, 2022
May 28, 2021 35557189Z RESOLVE CLASS - 2 FAILURE TO PROVIDE APPROVED/ACCEPTED CONST DOCS ATOI NOTED:@TIME OF MYINSP OF NEW7STYBLDG,CONST IN PROGRESS@GRNDFL LE... $312 $0 Apr 14, 2022
May 10, 2021 35558859N RESOLVE CLASS - 2 FAILURE TO INSTITUTE SAFETY MEASURES ATOI ON NB ACTIVE JOBSITE OBSERVED LEFT&RIGHT SIDE OF ADJACENT PROPERTY.JOBSITE ... $625 $0 Jan 24, 2022
May 10, 2021 35558856H RESOLVE CLASS - 1 OVERHEAD PROTECTION @TIME OF MY INSP NB ACTIVE JOBSITE OBSERVED REBA OPERATION TAKING PLACE OBSERVED NO OVERHEAD PROT... $2,500 $0 Jan 24, 2022
May 10, 2021 35558858L RESOLVE CLASS - 2 PEDESTRIAN PROTECTION DOESN'T MEET CODE SPECS ATOI ON NB BLDG ACTIVE JOBSITE OBSERVED JOBSITE FENCE&SWS ERECTED@173 (... $2,400 $0 Jan 24, 2022
May 10, 2021 35558857J RESOLVE CLASS - 1 PERMIT HOLDER FAILED TO ENSURE WORKERS REC SITE SAFETY ORIENTATION ATOI OF NB ACTIVE JOBSITE OBSERVED WORKERS DOING R... $1,250 $0 Jan 24, 2022
Dec 22, 2020 35543345Y RESOLVE CLASS - 1 MANUFACTOR SPECIFICATION. NOTE: AT THE TIME OF MY INSPECTION OF A 7 STY NEW BLDG,I OBSERVED YODOCK SYSTEM WAS NOT FIL... $625 $0 Sep 13, 2021
Dec 22, 2020 35543346X RESOLVE CLASS - 1 SEC. 3307.4 WARNING SIGNS,PERSONEL & BARRIERS. NOTE: AT THE TIME OF MYINSPECTION OF A 7 STY NEW BLDG FOUNDATION PHASE... $625 $0 Sep 13, 2021
Oct 6, 2020 35499121J RESOLVE CLASS - 1 SEC. 3307.2.1 OBSTRUCTION OF SIDEWALK OR STREET. AT THE TIME OF INSPECTION OF AN ACTIVE JOBSITE OBSERVED CONCRETE OPE... $625 $0 Nov 24, 2021
Oct 6, 2020 35499120H RESOLVE CLASS - 2 FAILURE TO PERFORM PROPER CONCRETE WASHOUT WATER PROCEDURES. AT THE TIME OF INSPECTION OF AN ACTIVE JOBSITE OBSERVED,... $2,500 $0 Nov 24, 2021
Sep 4, 2020 35509633J RESOLVE CLASS - 2 WORK CONTRARY TO CONSTRUCTION DOCUMENTS NOTE AT THE TIEM OF INSPECTION OBSERVED AN ACTIEV JOBSITE AT FOUNDATION/EXCAV... $1,250 $0 Jan 13, 2021
Mar 27, 2020 35472096R RESOLVE CLASS - 1 FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING. NOTE: AT TIME OF INSPECTIONOF A 7 STY NB ACTIVE JOBSITE I OBSERVED LARGE A... $1,250 $0 Dec 1, 2021
Mar 9, 2020 35466697L RESOLVE CLASS - 1 BC 3301.2 FAILURE TO MAINTAIN(REBAR CAP)NOTE:AT TIME OF MY INSPECTION OF A PROPOSED 7 STORY N.B. AT EXCAVATION LEVEL ... $2,530 $0 Sep 18, 2020
Mar 9, 2020 35466696J RESOLVE CLASS - 2 FAILURE TO PROVIDE FLAG MEN.NOTE:AT TIME OF MY INSPECTION OF A PROPOSED 7 STORY N.B AT EXCAVATION LEVEL I OBSERVED AT... $2,430 $0 Jul 15, 2020
Oct 16, 2019 35419025R RESOLVE CLASS - 1 WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS. AT TIME OF INSPECTION OF A 7 STY NB CURRENTLY AT EXCAVATION... $2,500 $0 Feb 19, 2020
May 17, 2018 35273413J RESOLVE CLASS - 2 WORK W/O A PERMIT. (CONSTRUCTION PLYWOOD FENCE PERMIT EXPIRED). AS NOTED: AT TIME OF INSPECTION CONSTRUCTION SITE WAS... $0 $0 Jul 16, 2018