23-27 Anthony Street, Brooklyn
Brooklyn • Block 02810 • Lot 0029 • Zip: 11222
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 4 days ago- Union Square 30 min 8 walking, 22 riding
- Grand Central 31 min 8 walking, 23 riding
- Times Square 34 min 8 walking, 26 riding
- Downtown Brooklyn 34 min 8 walking, 26 riding
- Penn Station 39 min 8 walking, 31 riding
- Fulton Street 39 min 8 walking, 31 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Railroad
Ferry
Bus
Citi Bike
Places nearby
Border Town
No description yet
Balera
No description yet
Border Town
No description yet
Diamond Slice
No description yet
R Bar
No description yet
Peek Inn
No description yet
Restaurant Relax
Polish restaurant
Taste of Heaven
No description yet
Activity
Sales, filings, permits and violations from every dataset, in one order.
2025
-
DOB violation Nov 14, 2025
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION
-
DOB violation Nov 14, 2025
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION
-
DOB violation Nov 14, 2025
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION
-
DOB violation Nov 14, 2025
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION
2024
-
DOB violation Sep 23, 2024
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION
-
DOB violation Sep 23, 2024
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION
2016
-
Alteration Type II
PARTIAL DEMOLITION OF ONE STORY STRUCTURE AS PER PLANS FILED HEREWITH.
-
Alteration Type II
PARTIAL DEMOLITION OF ONE STORY STRUCTURE AS PER PLANS FILED HEREWITH. EXISTAN CE OF THE TEMPORARY WALL WILL BE LIMIT...
-
Alteration Type II
FILING GENERAL CONSTRUCTION AND STRUCTURAL WORK FOR NEW PERIMETER WALL TO INCLUDE EXCAVAION/FOUNDATION WORK AS PER PL...
-
Alteration Type II
HEREBY FILING GC AND ST WORK FOR NEW PERIMETER WALL (ONE SIDE) TO INCLUDE EXCATION/FOUDNATION WORK AS PER PLANS. NO C...
2015
2014
-
Alteration Type I
REQUEST TO REVISE MEETS AND BOUNDS AS SHOWN ON THE PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS. NO BULK ADDED UNDER ...
2012
2004
-
Alteration Type II
INSTALL MINOR WALL PARTITION OF EXISTING FOOD PROCESSING FACTORY. REPLACE OUTSIDE DRYWELL IN PARKING LOT AREA. NO CHA...
2003
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Building Permits
Owner information from Department of Buildings filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records