Skip to content

80-84 Manhattan Avenue, Brooklyn

Brooklyn • Block 03079 • Lot 0001 • Zip: 11206

Condition

What the city currently has open against this building, counted from its own records.

Address

Primary address: 80-84 Manhattan Avenue, Brooklyn
Borough: Brooklyn
Zip code: 11206
Block: 03079
Lot: 0001
BBL: 3030790001
Unified address ID: 3030790001

Land use and zoning

Land use: Industrial & Manufacturing
Zoning: R6 (Residential)
Lot type: Corner
Lot area: 3,375 sq ft
Lot dimensions: 25 ft x 100 ft
Built FAR: 4.15
Max residential FAR: 2.43
Max facility FAR: 4.8
School district: 14

Building

Building class: Warehouses - Miscellaneous (E9)
Year built: 1931
Last altered: 2009
Floors: 4
Total units: 6
Residential units: 0
Building area: 14,000 sq ft
Building dimensions: 25 ft x 100 ft
Basement: Below grade full basement
Owner: CHUNG HING INC

Latest assessment

Assessment year: 2018/19
Tax class: All Others
Market value: $1,154,000
Total assessment: $519,300
Land assessment: $39,600
Exempt total: $0
Assessment owner: CHUNG HING INC

Neighborhood

The area this lot falls inside, and the commute Hoodkit measures from it.

Neighborhood Williamsburg
District Brooklyn

Getting around

Estimated 5 days ago
Nearest station

About 5 minutes on foot · 308 m

  • Union Square 19 min 5 walking, 14 riding
  • Downtown Brooklyn 28 min 5 walking, 23 riding
  • Grand Central 30 min 5 walking, 25 riding
  • Times Square 31 min 5 walking, 26 riding
  • Fulton Street 32 min 5 walking, 27 riding
  • Penn Station 33 min 5 walking, 28 riding

Around this address

Transit and places within 0.5 miles of the lot.

Activity

Sales, filings, permits and violations from every dataset, in one order.

2026

  1. DOB NOW filing Apr 16, 2026 $14,000

    Alteration

    Permit Entire

  2. DOB NOW filing Apr 13, 2026 $18,000

    Alteration

    Permit Entire

  3. DOB NOW filing Apr 7, 2026 $10,000

    Alteration

    Permit Entire

2025

  1. DOB violation Nov 14, 2025

    HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED

    VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION

  2. DOB violation Nov 14, 2025

    HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED

    VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION

2023

  1. DOB violation Jun 30, 2023

    HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED

    VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION

  2. DOB violation Jun 30, 2023

    HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED

    VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION

  3. DOB violation Apr 25, 2023

    HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED

    VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION

  4. DOB violation Apr 25, 2023

    HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED

    VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE INSPECTION

2022

  1. DOB NOW filing Sep 13, 2022 $9,000

    Alteration

    LOC Issued

  2. DOB NOW filing Sep 12, 2022 $9,000

    Alteration

    Permit Entire

  3. DOB NOW filing Sep 1, 2022 $15,000

    Alteration

    LOC Issued

2018

  1. DOB filing May 25, 2018 $50,000

    Alteration Type II

    REPLACE METAL BEAMS AT CELLAR CEILING, INSTALL NEW STUCCO FINISH FOR NORTHWEST PORTION OF EXTERIOR WALL PER PLAN FILE...

2016

  1. Permit issued Feb 17, 2016

    EW / OT

    VIZCAYA CONSTRUCTION CORP

2012

  1. ECB violation Sep 7, 2012 $0

    CLASS - 2

    52B14

  2. ECB violation Apr 18, 2012 $1,600

    CLASS - 1

    28-116.4.1 97R07 OPERATING DEVICE W/O CERTIFICATE OF COMPLIANCE, NO REPORT OF INSPECTION SUBMITTED TO DOB AND NO WITN...

2010

  1. DOB filing May 11, 2010 $150,000

    Alteration Type II

    REMODELING EXISTING FACADE FOR EXISTING 4 STORY BUILDING, INSTALL SIDEWALK SHED DURING CONSTRUCTION. NO CHANGE IN USE...

2009

  1. Permit issued Aug 20, 2009

    EQ / EQ

    55C GROUP INC

  2. Permit issued Aug 20, 2009

    EW / OT

    55C GROUP INC

  3. Permit issued Jun 16, 2009

    EW / OT

    UNIVERSAL CONSTR & CONSUL

  4. Permit issued Jun 16, 2009

    EQ / EQ

    UNIVERSAL CONSTR & CONSUL

2006

  1. DOB filing Apr 24, 2006 $4,000

    Alteration Type II

    Replacement of exisitng gas fired process boiler with reconditioned (used) gas fired process boiler. No change in use...

2005

  1. Permit issued Mar 29, 2005

    EW / BL

    METROPOLITAN HT&PWR CO INC

2000

  1. ECB violation Apr 14, 2000 $250

    Non-Hazardous

    WORK W/O A PERMIT.WORK NOTED:STELL PLATE 4'X8'X3" THICK ERECTED AT FULL HEIGHT OVER SHEET ROCK WALL BY STAIRS FROM 1S...

  2. ECB violation Jan 27, 2000 $180

    Non-Hazardous

    73X11,22M12,75U05,18M07,63X# 73- RESTORE TO SERVICE SO A FULL INSPECTION CAN BE MADE 63- FREE GOV -TENSION CABLE

The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.

Property Contacts

Contact information aggregated from multiple government sources

2

Building Permits

Owner information from Department of Buildings filings

Owner
CHUNG HING INC
MAN MA
Owner
Mars Cleaners Corp
Robert Traktman
3

Recent Building Permits

Owner information from recent DOB NOW filings

Owner
Not Applicable
HACKENSACK, NJ, 07601
Owner
ARAMCO CONTRACTING LLC
OZONE PARK, NY, 11417
Owner
NOVEL CONSTRUCTION INC
OZONE PARK, NY, 11417
4

Deed Records

Parties from ACRIS deed and mortgage records

PARTY 1
ASSIGNEE/NEW LENDER
50 BOWERY
NY, NY, 00000
PARTY ONE
80-82 MANHATTAN AVE
BROOKLYN, NY, 11206
PARTY 1
MORTGAGOR/BORROWER
3 ALLEN ST
NY, NY, 00000
MORTGAGEE/LENDER
29 BOWERY
NY, NY, 00000
MORTGAGEE/LENDER
29 BOWERY
NY, NY, 00000
GRANTOR/SELLER
80-82 MANHATTAN AVENUE
BKLYN, NY, 00000
GRANTOR/SELLER
80-82 MANHATTAN AVE
BKLYN, NY, 00000

Show all recorded documents

5

Property Records

Owner information from assessment and PLUTO records

Assessment Owner
PLUTO Owner