Skip to content

DOB violations

59 Morgan Avenue, Brooklyn • Block 03093 • Lot 0024

12 records

Violations issued by the Department of Buildings.

Issued Violation Type Category Description Disposed
Sep 23, 2024 10086 LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED V-DOB VIOLATION - ACTIVE VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
Jun 30, 2023 29119 LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED V*-DOB VIOLATION - DISMISSED VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION Oct 9, 2023
Oct 21, 2021 21-01333 C-CONSTRUCTION OTHER OPTIONAL V*-DOB VIOLATION - DISMISSED BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPED UNDER PERMIT#321777387 DUE TO CONTRACTOR WITHDRAWAL. Nov 9, 2021
Oct 21, 2021 21-01334 C-CONSTRUCTION OTHER OPTIONAL V*-DOB VIOLATION - DISMISSED BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPED UNDER PERMIT #321777387 DUE TO CONTRACTOR WITHDRAWAL. Nov 9, 2021
Oct 31, 2018 00575 AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE V*-DOB VIOLATION - DISMISSED FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION Mar 27, 2021
Aug 9, 2018 ER01RJ C-CONSTRUCTION OTHER OPTIONAL V-DOB VIOLATION - ACTIVE DUE TO FIRE
Jan 6, 2006 17618 LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED V*-DOB VIOLATION - DISMISSED Jun 22, 2021
Feb 7, 2000 19109 LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED V*-DOB VIOLATION - DISMISSED Jun 22, 2021
Aug 29, 1995 33945 LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED V*-DOB VIOLATION - DISMISSED Jun 22, 2021
Jun 1, 1994 20345 LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED V*-DOB VIOLATION - DISMISSED Jul 27, 2021
Aug 16, 1993 33007 LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED V-DOB VIOLATION - ACTIVE
Jun 1, 1993 20344 LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED V*-DOB VIOLATION - DISMISSED Aug 6, 2021