DOB violations
115 Stanwix Street, Brooklyn • Block 03139 • Lot 0021
13 records
Violations issued by the Department of Buildings.
| Issued | Violation | Type | Category | Description | Disposed |
|---|---|---|---|---|---|
| Dec 1, 2024 | 2401239 | EGRADE-FAILURE TO POST ENERGY GRADE/SCORE NONE | V-DOB VIOLATION - ACTIVE | FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3 | — |
| Feb 22, 2022 | 02243 | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | V-DOB VIOLATION - ACTIVE | FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 | — |
| Oct 9, 2021 | 9027/709568 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | Jul 25, 2023 |
| Oct 9, 2021 | 9027/709569 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | Jul 25, 2023 |
| Oct 9, 2021 | 9027/709570 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | Jul 25, 2023 |
| Oct 19, 2020 | 9027/690318 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | Dec 16, 2022 |
| Jul 5, 2018 | BS04BG15 | C-CONSTRUCTION OTHER OPTIONAL | VPW*-VIOLATION UNSERVED ECB-WORK WITHOUT PERMIT-DISMISSED | — | Jul 19, 2018 |
| Jul 5, 2018 | BS04BG10 | C-CONSTRUCTION OTHER OPTIONAL | VP*-VIOLATION UNSERVED ECB- DISMISSED | — | Jul 19, 2018 |
| Jul 5, 2018 | BS04BG11 | C-CONSTRUCTION OTHER OPTIONAL | VP*-VIOLATION UNSERVED ECB- DISMISSED | — | Jul 19, 2018 |
| Jul 5, 2018 | BS04BG12 | C-CONSTRUCTION OTHER OPTIONAL | VP*-VIOLATION UNSERVED ECB- DISMISSED | — | Jul 19, 2018 |
| Jul 5, 2018 | BS04BG13 | C-CONSTRUCTION OTHER OPTIONAL | VP*-VIOLATION UNSERVED ECB- DISMISSED | — | Jul 19, 2018 |
| Jul 5, 2018 | BS04BG14 | C-CONSTRUCTION OTHER OPTIONAL | VP*-VIOLATION UNSERVED ECB- DISMISSED | — | Jul 19, 2018 |
| Oct 13, 2017 | 0408RH | C-CONSTRUCTION OTHER OPTIONAL | V*-DOB VIOLATION - DISMISSED | STOP ALL WORK IMMEDIATELY MAKE SITE SAFE ONLY CONTACT BOROUGH COMM. OF FICE AT 718 802-3677 FOR INFO | Apr 20, 2018 |