Job filings
147-163 Melrose Street, Brooklyn • Block 03156 • Lot 0001
48 records
Work filed with the Department of Buildings under its legacy BIS system.
| Latest action | Job | Type | Status | Work | Cost | Owner |
|---|---|---|---|---|---|---|
| Aug 30, 2021 | 321816219 | Alteration Type I | SIGNED OFF | HEREBY FILING TO DOCUMENT AND UPGRADE EXISTING PERMITTED ACCESSORY PARKING LOT FOR ADJACENT OFFICE BUILDING ON THE SA... | $329,000 | ALPINE EVERGREEN, LLC |
| Jul 29, 2021 | 320624393 | Alteration Type I | SIGNED OFF | HEREBY FILING MECHANICAL DUCTWORK, PLUMBING FIXTURES AND RELATED PIPING AS SHOWN ON DRAWINGS FILED HEREWITH. | $0 | CUSHMAN & WAKEFIELD OF NY, INC. |
| Oct 30, 2020 | 321248814 | Alteration Type III | SIGNED OFF | FILING HEREWITH BUILDERS PAVBMENT PLAN WITH 226 LF OF FRONTAGE. NO CHANGE IN USE EGRESS OR OCCUPANCY | $0 | CUSHMAN AND WAKEFIELD INC |
| Aug 12, 2020 | 340745901 | Alteration Type II | PLAN EXAM - APPROVED | NEW CANTILEVER FENCE BARRICADE AT EACH END OF EXISTING PARKING LOT AS PER PLANS FILED. NO CHANGE IN USE EGRESS OR OCC... | $75,000 | 625 BROADWAY VENTURE LLC |
| Jul 15, 2020 | 340746125 | Alteration Type II | APPLICATION PROCESSED - ENTIRE | NEW CANTILEVER FENCE BARRICADE AT EACH END OF EXISTING PARKING LOT AS PER PLANS FILED. NO CHANGE IN USE EGRESS OR OCC... | $75,000 | 625 BROADWAY VENTURE LLC |
| Jul 7, 2020 | 340742904 | Alteration Type II | APPLICATION PROCESSED - ENTIRE | NEW CANTILEVER FENCE BARRICADE AT EACH END OF EXISTING PARKING LOT AS PER PLANS FILED. NO CHANGE IN USE EGRESS OR OCC... | $75,000 | 625 BROADWAY VENTURE LLC |
| Jul 7, 2020 | 340742879 | Alteration Type II | APPLICATION PROCESSED - ENTIRE | NEW CANTILEVER FENCE BARRICADE AT EACH END OF EXISTING PARKING LOT AS PER PLANS FILED. NO CHANGE IN USE EGRESS OR OCC... | $75,000 | 625 BROADWAY VENTURE LLC |
| Feb 13, 2020 | 321983207 | Alteration Type II | SIGNED OFF | HEREBY FILING FOR THE REMOVAL AND INSTALLATION OF NON-LOAD BEARING PARTITIONS, AND FINISHES IN THE CELLAR,AND FIRST A... | $195,900 | LINCOLN PROPERTY COMPANY |
| Jul 22, 2019 | 321746063 | Alteration Type II | SIGNED OFF | HEREBY FILING TO MODIFY THE FIRE ALARM SYSTEM FOR OFFICE BUILD-OUT AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE TO ... | $250,000 | ALPINE EVERGREEN, LLC |
| May 17, 2019 | 321768869 | Alteration Type II | SIGNED OFF | HEREBY FILING TO REMOVE, RELOCATE AND INSTALL SPRINKLER HEADS FOR OFFICE BUILD-OUT FOR DCAS. NO CHANGE TO USE, OCCUPA... | $1,581,500 | ALPINE EVERGREEN, LLC |
| May 15, 2019 | 321770133 | Alteration Type II | SIGNED OFF | HEREBY FILING TO REMOVE SPRINKLER HEADS AND INSTALL NEW TEMPORARY LOOP SPRINKLER SYSTEM AS SHOWN ON PLANS FILED HEREW... | $108,975 | ALPINE EVERGREEN, LLC |
| May 15, 2019 | 321746072 | Alteration Type II | SIGNED OFF | HEREBY FILING TO MODIFY EXISTING FIRE ALARM SYSTEM AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE TO USE, OCCUPANCY, ... | $40,000 | ALPINE EVERGREEN, LLC |
| May 15, 2019 | 321791156 | Alteration Type II | SIGNED OFF | HEREBY FILING FOUNDATION, STAIR, AND STRUCTURAL FRAMING AS SHOWN ON PLANS FILED HEREWITH FOR OFFICE FIT OUT. NO CHANG... | $700,000 | ALPINE EVERGREEN, LLC |
| May 14, 2019 | 321768878 | Alteration Type II | SIGNED OFF | HEREBY FILING TO MODIFY MECHANICAL SYSTEMS AND REMOVE AND INSTALL PLUMBING FIXTURES WITH RELATED PIPING FOR CORE AND ... | $2,159,035 | ALPINE EVERGREEN, LLC |
| Jun 1, 2018 | 321104915 | Alteration Type III | SIGNED OFF | HEREBY FILING TENANT PROTECT PLAN AS SHOWN ON DRAWINGS FILED HEREWITH. | $1,000 | CUSHMAN & WAKEFIELD OF NY, INC. |
| May 25, 2018 | 340265867 | Alteration Type II | SIGNED OFF | HEREBY FILING TO INSTALL NEW STEAM PIPING SYSTEM FOR INTERIOR RENOVATIONS AS SHOWN ON DRAWINGS FILED HEEWITH.NO CHANG... | $1,490,000 | CUSHMAN & WAKEFIELD OF NY, INC. |
| Feb 28, 2018 | 321375686 | Alteration Type III | SIGNED OFF | SHORING OF EXCAVATION TO INSTALL NEW CON EDISON VAULT, NEW PILE CAP OVER TIMBER OR DRILLED-IN STEEL PILE AS PER CON- ... | $60,000 | CUSHMAN & WAKEFIELD OF NY, INC. |
| Jan 16, 2018 | 321025868 | Alteration Type III | SIGNED OFF | INSTALLATION OF NEW TELECOMMUNICATION ANTENNA COMPONENTS. RETROFIT EXISTING EQUIPMENT CABINET ON THE EQUIPMENT PLATFO... | $15,000 | 95 EVERGREEN ASSOCIATES |
| Jul 18, 2017 | 301999130 | Alteration Type III | SIGNED OFF | INSTALLING TELECOMMUNICATIONS CABINETSRELATED DUNNAGE & RELATED ANTENN AS ON ROOF IN COMFORMANCE WITH TPPN#5981 N... | $25,000 | 95 EVERGREEN ASSOC LLC |
| May 11, 2017 | 340389378 | Alteration Type III | SIGNED OFF | INSTALLATION OF TEMPORARY WALKWAY PLATFORM AS PER DRAWINGS. TEMPORARY WALKWAY PLATFORM SHALL COMPLY WITH CHAPTER #33 ... | $0 | YORK SCAFFOLD EQUIPMENT CORP. |
| Mar 2, 2017 | 301269865 | Alteration Type II | SIGNED OFF | MODIFICATION AND REPLACEMENT TO TELECOMMUNICATION CABINETS ON ROOF IN CONFORMANCE OF TPPN 5/98. NO CHANGE IN USE EGRE... | $15,000 | 95 EVERGREEN/ ASSOCIATES |
| Feb 22, 2017 | 340277578 | Alteration Type II | SIGNED OFF | HEREBY FILING TO MODIFY STANDPIPE AND INSTALL SPRINKLER HEADS AND RELATED PIPING FOR INTERIOR RENOVATION AS SHOWN ON ... | $395,000 | CUSHMAN & WAKEFIELD OF NY, INC. |
| Dec 15, 2016 | 340429904 | Alteration Type II | SIGNED OFF | REPLACE GAS BURNER ON EXISTING LOW PRESSURE BOILER AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS. | $20,000 | SAVANNA FUND |
| Nov 18, 2016 | 321175232 | Alteration Type III | SIGNED OFF | HEREBY FILING A TEMPORARY FENCE AS SHOWN ON DRAWING FILED HEREWITH. | $0 | CUSHMAN & WAKEFIELD OF NY, INC. |
| Oct 11, 2016 | 340352692 | Alteration Type III | SIGNED OFF | PROPOSED INSTALLATION OF NEEDLE BEAM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $0 | CUSHMAN & WAKEFIELD OF NYC INC |
| Oct 7, 2016 | 321088149 | Alteration Type II | SIGNED OFF | HEREBY FILING ARCHITECTURAL DRAWINGS SHOWING THE WINDOW REPLACEMENT AND ASSOCIATED MASONRY WORK AS SHOWN ON DRAWINGS ... | $625,000 | CUSHMAN & WAKEFIELD OF NY, INC. |
| Aug 19, 2016 | 321166073 | Alteration Type II | SIGNED OFF | HEREBY FILING TO INSTALL SPRINKLER HEADS AND RELATED PIPING FOR INTERIOR RENOVATION AS SHOWN ON DRAWINGS FILED HEREWI... | $81,600 | CUSHMAN & WAKEFIELD OF NY, INC. |
| Aug 18, 2016 | 321154978 | Alteration Type II | SIGNED OFF | HEREBY FILING TO CONSTRUCT INTERIOR PARTITIONS, CEILINGS AND DOORS FOR INTERIOR BUILDOUT AS SHOWN ON DRAWINGS FILED H... | $1,000,000 | CUSHMAN & WAKEFIELD OF NY, INC. |
| Aug 11, 2016 | 321165038 | Alteration Type II | SIGNED OFF | HEREBY FILING TO INSTALL A MANUAL & AUTO SMOKE/HEAT DETECTION/ SPINKLER ALARM ONE & TWO WAY VOICE COMMUNICATI... | $140,000 | CUSHMAN & WAKEFIELD OF NY, INC. |
| Jul 11, 2016 | 340279763 | Alteration Type II | SIGNED OFF | HEREBY FILING EMERGENCY GENERATOR AND MECHANICAL WORK AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS O... | $135,000 | CUSHMAN & WAKEFIELD OF NY, INC. |
| Jul 6, 2016 | 340238674 | Alteration Type II | SIGNED OFF | HEREBY INSTALLING TEMPORARY SPRINKLER LOOP AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. . | $75,000 | CUSHMAN & WAKEFIELD OF NY, INC. |
| Jul 5, 2016 | 321104906 | Alteration Type II | SIGNED OFF | HEREBY FILING PARTIAL REPLACEMENT AND RENOVATION OF INTERIOR AND EXTERIOR WALL FOR THE LOBBY RENOVATION AS SHOWN ON D... | $35,000 | CUSHMAN & WAKEFIELD OF NY, INC. |
| Jun 27, 2016 | 340324615 | Alteration Type II | SIGNED OFF | INSTALL NEW METAL CHIMNEY LINER AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS. | $100,000 | SAVANNA FUND |
| Jun 23, 2016 | 321088185 | Alteration Type II | SIGNED OFF | HEREBY FILING ARCHITECTURAL DRAWINGS SHOWING THE FACADE RESTORATION AND ROOF REPAIR AS SHOWN ON DRAWINGS FILED HEREWI... | $1,875,000 | CUSHMAN & WAKEFIELD OF NY, INC. |
| Jun 21, 2016 | 321096498 | Alteration Type II | SIGNED OFF | HEREBY FILING STRUCTURAL MODIFICATIONS RELATED TO THE NEW SHAFT CONSTRUCTION AS SHOWN ON DRAWINGS FILED HEREWITH. NO ... | $100,000 | CUSHMAN & WAKEFIELD OF NY, INC. |
| Jun 6, 2016 | 340389350 | Alteration Type III | PLAN EXAM - IN PROCESS | INSTALLATION OF TEMPORARY WALKWAY PLATFORM AS PER DRAWINGS. TEMPORARY WALKWAY PLATFORM SHALL COMPLY WITH CHAPTER #33 ... | $0 | YORK SCAFFOLD EQUIPMENT CORP. |
| May 16, 2016 | 321291561 | Alteration Type III | SIGNED OFF | FILING HEREWITH ALTERATION III FOR RELOCATION OF WATER SERVICE AS INDICATED ON PLANS | $10,000 | SAVANNA |
| May 12, 2016 | 321287843 | Alteration Type III | PLAN EXAM - APPROVED | HEREBY FILING FIRE PROTECTION PLAN FOR OCCUPANCY OF OFFICE BUILDING AS SHOWN ON DRAWINGS FILED HEREWITH. IN CONJUNCTI... | $1,000 | CUSHMAN & WAKEFIELD OF NY, INC. |
| Mar 24, 2016 | 340235329 | Alteration Type III | SIGNED OFF | PROPOSED INSTALLATION OF SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $0 | EVEREST SCAFFOLDING, INC. |
| Jan 7, 2016 | 340235463 | Alteration Type III | SIGNED OFF | PROPOSED INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $0 | EVEREST SCAFFOLDING, INC. |
| Jul 21, 2015 | 340265750 | Alteration Type II | PLAN EXAM - DISAPPROVED | HEREBY FILING TO CONSTRUCT INTERIOR PARTITIONS, CEILINGS AND DOORS FOR INTERIOR BUILDOUT AS SHOWN ON DRAWINGS FILED H... | $1,200,000 | CUSHMAN & WAKEFIELD OF NY, INC. |
| Jul 2, 2015 | 340277499 | Alteration Type II | APPLICATION PROCESSED - ENTIRE | HEREBY FILING TO MODIFY THE STANDPIPE AND INSTALL SPRINKLER HEADS AND RELATED PIPING FOR INTERIOR RENOVATION AS SHOWN... | $395,000 | CUSHMAN & WAKEFIELD OF NY, INC. |
| Mar 12, 2015 | 340238594 | Alteration Type II | APPLICATION PROCESSED - ENTIRE | HEREBY INSTALLING TEMPORARY SPRINKLER LOOP AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $75,000 | CUSHMAN & WAKEFIELD OF NY, INC. |
| Jun 27, 2014 | 321056799 | Alteration Type II | PLAN EXAM - APPROVED | LEGALIZE COMMERCIAL BOILER ON 5TH FLOOR. | $26,200 | 95 EVERGREEN ASSOCIATES |
| Feb 12, 2013 | 320376794 | Alteration Type II | SIGNED OFF | PROPOSED: INSTALLATION OF ROOFTOP SOLAR PANELS AND INSTALLATION OF THE CUSTOM RACKING SYSTEM. NO CHANGE OF OCCUPANCY,... | $229,475 | 95 EVERGREEN ASSOCIATES |
| Jul 29, 2011 | 320134742 | Alteration Type III | SIGNED OFF | INSTALLING ADDITIONAL TELECOMUNICATIONS CABINETS ON ROOF. REPLACING EXISTING AND INSTALLING ADDITIONAL ANTENNAS ON RO... | $30,000 | 95 EVERGREEN ASSOCIATES, LLC |
| Jan 15, 2008 | 302352610 | Alteration Type III | SIGNED OFF | INSTALLING EQUIPMENT CABINETS ANDRELATED ANTENNAS ON ROOF. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $25,000 | 95 EVERGREEN ASSOCIATES LLC |
| Oct 10, 2007 | 301080773 | Alteration Type II | SIGNED OFF | INSTALLING ADDITIONAL COMMUNICATIONS CAB INETS ON ROOF IN CONFORMANCE WI H TPPN #5/98. ADDITIONAL RELATED ANTENAS ON ... | $15,000 | 95_AVERGREEN ASSOC. |