ECB violations
95 Central Avenue, Brooklyn • Block 03173 • Lot 0004
13 records
Environmental Control Board violations, which carry a hearing and a penalty.
| Issued | Violation | Status | Severity | Description | Penalty | Balance due | Hearing |
|---|---|---|---|---|---|---|---|
| Aug 18, 2023 | 39520718L | ACTIVE | CLASS - 2 | VIOLATING CONDITION OBSERVED: AT THE TIME OF INSPECTION I OBSERVED CONSTRUCTION FENCE AT EXPOSURE #1 HAS GRAFFITI AND... | $1,000 | $1,000 | Apr 8, 2024 |
| Nov 28, 2022 | 39509586L | ACTIVE | CLASS - 2 | OBSERVED A SIDEWALK SHED IN PLACE @ EXPOSURE 1, NO PROJECT INFORMATION PANEL/SIDEWALK SHED PARAPET PANEL/CONSTRUCTION... | $1,250 | $1,250 | Jul 11, 2023 |
| Nov 1, 2022 | 39073158K | RESOLVE | CLASS - 2 | TEMPORARY CONSTRUCTION EQUIPMENT ON SITE-EXPIRED PERMIT; NOTED: OBSERVED TEMP. CONST. FENCE(B00311257-L1-FN) & SUPPOR... | $0 | $0 | Mar 8, 2023 |
| Mar 28, 2022 | 35576279X | RESOLVE | CLASS - 2 | MISCELLANEOUS VIOLATIONS.NOTE:TIME OF INSPECTION OBSERVED SAFETY NETTING FLAPPING IN WIND CREATING DANGER OF BLOWING ... | $0 | $0 | Aug 17, 2022 |
| Mar 28, 2022 | 35576280N | RESOLVE | CLASS - 2 | TEMPORARY CONSTRUCTION EQUIPMENT ON SITE-EXPIRED PERMIT.NOTE:AT TIME OF INSPECTION OBSERVED SIDEWALK SHED PERMIT EXPI... | $0 | $0 | Aug 17, 2022 |
| May 7, 2021 | 35408109K | RESOLVE | CLASS - 2 | ON EXPOSURE #2 AND EXPOSURE #4 FROM 1ST FLOOR TO 3RD FLOOR CONTINUES INSULATION R-11.4 BETWEEN ADJACENT BUILDING IS N... | $2,000 | $2,000 | Feb 28, 2022 |
| Feb 5, 2021 | 35543891L | RESOLVE | CLASS - 1 | GUARDRAILS(MISSING).NOTE:AT THE TIME OF MY INSPECTION OF A 4 STORY NEWBLDG 54 FT A 3RD FL LEVEL APPROX. 20FT IN HEIGH... | $0 | $0 | Dec 20, 2021 |
| Feb 5, 2021 | 35543889M | RESOLVE | CLASS - 1 | FAIL TO MAINTAIN A RECORD OF ORIENTATION PERFORM AT JOB SITE.NOTE:AT THE TIME OF MY INSPECTION OF A 4 STORY NEW BLDG ... | $2,500 | $2,500 | Aug 1, 2022 |
| Feb 5, 2021 | 35543890J | RESOLVE | CLASS - 1 | SIDEWALK SHED WHERE REQUIRE.NOTE:AT TIME 0F MY INSPECTION OF A 4 STORYNEW BLDG 54 FT AT 3RD FL LEVEL APPROX. 20 FT IN... | $10,000 | $10,000 | Aug 1, 2022 |
| Feb 5, 2021 | 35543893P | RESOLVE | CLASS - 1 | MANUFACTOR SPECIFICATION NOTE:AT THE TIME OF MY INSPECTIONS OF A 4 STORY NEW BLDG CONSTRUCTION WORK IN PROGRESS 3RD F... | $2,500 | $2,500 | Aug 1, 2022 |
| Feb 5, 2021 | 35543895Z | RESOLVE | CLASS - 1 | WORK DOES NOT CONFORM TO APPROVED DESIGN DRAWING.NOTE:AT THE TIME OF MY INSPECTION OF A 4 STORY NEW BLDG CONSTRUCTION... | $625 | $625 | Aug 1, 2022 |
| Feb 5, 2021 | 35543894R | RESOLVE | CLASS - 1 | CONSTRUCTION SUPERINTENDENT FAIL TO PERFORM HIS DUTIES.NOTE:AT THE TIME OF MY INSPECTION OF A 4 STORY NEW BLDG CONSTR... | $2,500 | $2,500 | Jun 16, 2021 |
| Feb 5, 2021 | 35543892N | RESOLVE | CLASS - 1 | BC3303.9 REQUIRED MEANS OF EGRESS NOTE:AT THE TIME OF MY INSPECTION OFA 4 STORY NEW BLDG 54FT AT 3RD FL LEVEL APPROX.... | $0 | $0 | Aug 1, 2022 |