245 Troutman Street, Brooklyn
Brooklyn • Block 03174 • Lot 0038 • Zip: 11237
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 4 days ago- Union Square 39 min 7 walking, 32 riding
- Fulton Street 39 min 7 walking, 32 riding
- Downtown Brooklyn 43 min 7 walking, 36 riding
- Grand Central 50 min 7 walking, 43 riding
- Times Square 51 min 7 walking, 44 riding
- Penn Station 53 min 7 walking, 46 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Subway
Railroad
Ferry
Bus
Citi Bike
Places nearby
Bark Barbecue
No description yet
Bodega Nights
No description yet
Otis
No description yet
Eyval
Eyval is a cozy eatery in the heart of Brooklyn offering a fusion of Mediterranean and Turkish cuisine. With a warm a...
Nene’s Deli Taqueria
No description yet
Blue Hour
No description yet
Roberta's
Pizza place
Nowon Bushwick
Nowon Bushwick is a trendy Korean-American fusion restaurant in the heart of Brooklyn. With a cozy and welcoming atmo...
Activity
Sales, filings, permits and violations from every dataset, in one order.
2026
-
HPD violation Jun 15, 2026
Class B
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE GLASS PANEL AT BUILDING FRONT ENTRANCE DOOR , 1st S...
2025
-
DOB violation Apr 15, 2025
C-CONSTRUCTION OTHER OPTIONAL
FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. OBSERVED HAIRLINE CRACKS IN FACADE ON EXPOSURE 1 EAST ELEVAT...
2024
-
DOB violation Oct 22, 2024
C-CONSTRUCTION OTHER OPTIONAL
FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. AT TIME OF INSPECTION OBSERVED AT EXPOSURE #1 MULTIPLE CRACKS,...
-
DOB violation Jun 20, 2024
C-CONSTRUCTION OTHER OPTIONAL
EMERGENCY WORK ORDER.NOTE OBSERVED ON AN OCCUPIED PARKING STRUCTURE OF 2 LEVELS,CRACKED SPALLED CONCRETE BEAMS,CONCRE...
-
DOB violation Jun 6, 2024
C-CONSTRUCTION OTHER OPTIONAL
FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER.AT THE TIME OF INSPECTION,OBSERVED AT EXP1 MULTIPLE CRACKS IN...
-
DOB violation Jun 6, 2024
C-CONSTRUCTION OTHER OPTIONAL
EMERGENCY WORK ORDER DU TO BOWING BULGING WALL AT GROUND LEVEL OF EXPOSURE #1 SOUTH ELEVATIN. REMEDY: IMMEDIATELY REM...
-
DOB violation Jun 6, 2024
C-CONSTRUCTION OTHER OPTIONAL
FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. NOTE AT TIME OF INSPECTION OBSERVED BOWING BULGING WALL AT G...
2023
2019
-
CLASS - 2
FAILURE TO COMPLY W/COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION #35269295X ISSUED ON 5/16/18 &TO FILE A CERT ...
2018
-
HPD violation Aug 31, 2018
Class C
§ 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING DOUBLE CYLINDER KEY OPERATED LOCK INSTALLED AT BUILDING FRONT E...
-
HPD violation Aug 24, 2018
Class C
§ 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIG...
-
HPD violation Aug 24, 2018
Class A
§ 27-2046.1 HMC: POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY THE COM...
-
HPD violation Aug 24, 2018
Class A
§ 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND T...
-
HPD violation Aug 24, 2018
Class A
§ 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE ...
-
CLASS - 2
UNAPPROVED UNSAFE UNSUITABLE ELCTRICAL EQUIPMENT DEVICES APRATUS APPLIANCES MATERILS OR WIRING IS USE.EXCESSIVE SEAT ...
-
CLASS - 2
FAILURE TO INSTALL GROUND FAULT CIRCUT INTERUPTER GFCL PROTECTION AS REQUIRED.NO GFCL PROVIDED IN SIDE WALKSHED.INSTA...
-
CLASS - 1
250.4-NON CURRENT CARRYING ELETRICAL CONDUCTIVE MATERIAL IS NOT GROUNDED.SIDEWALK SHED IS METAL AND COULD BE ENERGISE...
-
CLASS - 2
FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING.NOTED:ENCLOSURE STORAGE OF CONSTRUCTION DEBRIS AT CELLAR LEVEL AND REAR YAR...
-
CLASS - 2
FAILED TO OBTAIN A TEMP.CONSTRUCTION PERMIT PRIOR TO INSTALLATION OF SIDEWALK SHED.NOTED:INSTALLED SIDEWALK SHED WITH...
-
Alteration Type II
GENERAL CONSTRUCTION TO RENOVATE APT #2L AT 2ND & APT #3L & 3R AT 3RD FLOOR. WORK WILL INCLUDE NEW PARTITIONS...
-
Alteration Type II
GENERAL CONSTRUCTION TO RENOVATE APT #1 AT 1ST FLOOR & APT #2R AT FLOOR. WORK WILL INCLUDE NEW PARTITIONS & F...
2017
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Registration Contracts
Contact information from multiple dwelling registrations
Building Permits
Owner information from Department of Buildings filings
Recent Building Permits
Owner information from recent DOB NOW filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records