2-4 Wyckoff Avenue, Brooklyn
Brooklyn • Block 03176 • Lot 0034 • Zip: 11237
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 3 days ago- Union Square 39 min 7 walking, 32 riding
- Fulton Street 39 min 7 walking, 32 riding
- Downtown Brooklyn 43 min 7 walking, 36 riding
- Grand Central 50 min 7 walking, 43 riding
- Times Square 51 min 7 walking, 44 riding
- Penn Station 53 min 7 walking, 46 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Subway
Railroad
Ferry
Bus
Citi Bike
Places nearby
Bark Barbecue
No description yet
Bodega Nights
No description yet
Otis
No description yet
Nowon Bushwick
Nowon Bushwick is a trendy Korean-American fusion restaurant in the heart of Brooklyn. With a cozy and welcoming atmo...
Lori Jayne
No description yet
The Turk’s Inn
No description yet
Carmenta’s
Carmenta’s is a cozy Italian restaurant in the heart of Brooklyn, serving up authentic dishes made with fresh, locall...
La Cantine
No description yet
Activity
Sales, filings, permits and violations from every dataset, in one order.
2025
-
DOB violation Nov 14, 2025
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION
-
DOB violation Nov 14, 2025
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION
-
DOB violation Nov 14, 2025
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION
-
DOB violation Nov 14, 2025
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION
-
DOB violation Nov 14, 2025
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION
-
DOB violation Nov 14, 2025
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION
2021
-
Alteration Type II
2020
2019
-
Alteration Type I
COMBINE LOTS TO EXTEND EATING AND DRINKING ESTABLISHMENT USE GROUP 6A AND ADD USE GROUP 6F. INSTALL NEW EXTERIOR EXIT...
-
Alteration Type II
THIS APPLICATION IS BEING FILED FOR THE CONSTRUCTION OF A NEW ADA UNISEX W.C. AS PER PLANS.
-
CLASS - 2
WORK W/O PERMIT; NOTED: AT JEFFERSON STREET SIDE OF BUILDING FABRICATED STRUCTURE ERECTED APPRX 6'W X 10'L X 7'H TO C...
2018
-
CLASS - 2
FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35237017J ISSUED ON 10/25/17 & TO FILE A C OF C PURSUAN...
-
CLASS - 1
FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS/VIOLATION # 35237018L ISSUED O 10/25/17 AND TO FI...
2017
-
CLASS - 1
FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35237018L ISSUED ON 10/25/17 & TO FILE A C OF C PURSUAN...
-
CLASS - 2
FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#3527017JR ISSUED ON 10/25/17 & TO FILE A C OF C PURSUAN...
-
CLASS - 1
WORK W/OUT A PERMIT. OBSERVED: @ TIME OF INSP A PARTIALLY ENCLOSED PERFORMANCE SPACE BUILT @ REAR YARD OF PREMISES W/...
2016
-
Alteration Type I
FILING HEREBY ALL STRUCTURAL AND MECHANICAL DRAWING AND DETAIL
-
Alteration Type II
INSTALLATION OF MANUAL AND AUTOMATIC SMOKE/HEAT/CO DETECTION AND SPRINKLER FIR E ALARM SYSTEM
-
Alteration Type II
Installation of two natural gas fired process boilers. No change in use, occupancy or egress.
2015
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Building Permits
Owner information from Department of Buildings filings
Recent Building Permits
Owner information from recent DOB NOW filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records