1173 Greene Avenue, Brooklyn
Brooklyn • Block 03285 • Lot 0072 • Zip: 11221
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 5 days ago- Union Square 39 min 7 walking, 32 riding
- Fulton Street 39 min 7 walking, 32 riding
- Downtown Brooklyn 43 min 7 walking, 36 riding
- Grand Central 50 min 7 walking, 43 riding
- Times Square 51 min 7 walking, 44 riding
- Penn Station 53 min 7 walking, 46 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Subway
Railroad
Ferry
Bus
Citi Bike
Places nearby
Nene’s Deli Taqueria
No description yet
Lucky Charlie
No description yet
Carmenta’s
Carmenta’s is a cozy Italian restaurant in the heart of Brooklyn, serving up authentic dishes made with fresh, locall...
Knickerbocker Bagel
No description yet
Mood Ring
Mood Ring is a trendy bar in Brooklyn known for its unique cocktails and vibrant atmosphere. Featuring a retro decor ...
Sunday C&C Eatery
No description yet
Tora
No description yet
La Isla
La Isla is a hidden gem in Brooklyn, offering a unique blend of Latin American cuisine in a cozy and welcoming atmosp...
Activity
Sales, filings, permits and violations from every dataset, in one order.
2026
-
HPD violation Jul 6, 2026
Class B
§ 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING ...
-
HPD violation Jul 6, 2026
Class B
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE INTERCOM SYSTEM FROM BUILDING ENTRANCE TO TO WEST W...
-
HPD violation Jul 6, 2026
Class B
§ 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON ...
-
HPD violation Jul 6, 2026
Class B
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE INTERCOM SYSTEM FROM BUILDING ENTRANCE TO TO EAST W...
2022
-
HPD violation Mar 10, 2022
Class A
(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION ...
2018
-
New Building
2017
-
Alteration Type III
BUILDERS PAVEMENT PLAN FOR A TOTAL STREET FRONTAGE OF TWENTY THREE (23) FT.
-
New Building
MECHANICAL, PLUMBING, AND SPRINKLER WORK AS PER PLANS FILED. BEING FILED IN CONJUNCTION WITH DOC 1
-
Alteration Type III
BUILDERS PAVEMENT PLAN FOR A TOTAL STREET FRONTAGE OF 23 FT
-
Alteration Type III
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH 2014 BUILDING CODE CHAPTER 33. NO CHANGE...
-
Alteration Type III
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL CO...
2016
-
CLASS - 1
SEC. 3301.1.1 RESPONSIBILITY FOR SAFETY. NOTE: AT THE TIME OF MY INSPECTION OF A 4 STY BLDG AT BULKHEAD LEVEL CONSTRU...
-
CLASS - 2
SEC. 3307.7 FENCE. NOTE: AT THE TIME OF MY INSPECTION OF A 4 STY BLDG AT BULKHEAD LEVEL,CONSTRUCTION WORK IN PROGRESS...
-
CLASS - 1
SEC. 3309.10 PROTECTION OF ROOFS. NOTE: AT THE TIME OF MY INSPECTION OF A 4 STY BLDG AT BULKHEAD LEVEL CONSTRUCTION W...
-
CLASS - 1
SEC. 1RCNY48 FAILURE TO ADEQUATELY SUPERVISE WORK AT A CONSTRUCTION SITE,SO AS TO MAINTAIN A SAFE CONSTRUCTION SITE &...
2015
-
CLASS - 1
FAILURE TO PROVIDE PROTECTION AT THE SITE OF ESCAVATION. AT THE TIME OF MY INSPECTION CONSTRUCTION WORK IN PROGRESS. ...
-
CLASS - 1
SEC. 3307.6.4.8 FAILURE TO PROVIDE LIGHTING FOR TEMPORARY WALKWAY. AT THE TIME OF MY INSPECTION. CONSTRUCTION WORK IN...
2000
-
DOB violation Feb 7, 2000
LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
1999
-
DOB violation Mar 16, 1999
LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
1998
-
DOB violation May 4, 1998
LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
1997
-
DOB violation Sep 16, 1997
LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
-
DOB violation Jul 14, 1997
IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL
-
DOB violation Feb 10, 1997
LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Registration Contracts
Contact information from multiple dwelling registrations
Building Permits
Owner information from Department of Buildings filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records