ECB violations
960 Bushwick Avenue, Brooklyn • Block 03294 • Lot 0025
13 records
Environmental Control Board violations, which carry a hearing and a penalty.
| Issued | Violation | Status | Severity | Description | Penalty | Balance due | Hearing |
|---|---|---|---|---|---|---|---|
| Sep 7, 2025 | 39544551P | RESOLVE | CLASS - 1 | AT TIME OF INSPECTION OBSERVED: PROPOSED 8 STORY NB TOP OFF. FOOTPRINT APPROX. 9965 SQ. FT. SITE CLOSED AND THERE WAS... | $2,500 | $2,500 | Feb 9, 2026 |
| Jul 15, 2025 | 39153626M | RESOLVE | CLASS - 2 | NO EN DRAWING APPROVED FROM DOB PROVIDED ON THE JOB SITE AT THE TIME OF INSPECTION., MAINTAIN/DISPLAY REQUIRED DOCUME... | $1,250 | $1,250 | May 14, 2026 |
| Jul 8, 2025 | 39153095M | RESOLVE | CLASS - 1 | AT TIME OF INSPECTION OBSERVED WORKERS DISMANTLING SIDEWALK SHED AT EXP1 FRONT OF 962 BUSHWHICK AVENUE WITHOUT A AFTE... | $0 | $0 | Nov 5, 2025 |
| Jul 1, 2025 | 39541880M | RESOLVE | CLASS - 1 | CONCRETE POUR IN PROGRESS,8 STORY BUILDING SCAFFOLD ALT NOT COMPLAINT PER BC 3308.6.1.4 NOT PLANK FLUSH TO BUILDING W... | $5,000 | $5,000 | Jan 14, 2027 |
| Jul 1, 2025 | 39541883H | RESOLVE | CLASS - 2 | 100PM OBSERVED 5 CUBIC YARDS OF COMBUSTIBLE DEBRIS,MATERIALS,FILLED GARBAGE BAGS EXP1 NOT MAINTAIN IN CONTAINERS PER ... | $0 | $0 | Sep 10, 2025 |
| Jul 1, 2025 | 39541882X | RESOLVE | CLASS - 2 | EXP1,EXP3 SCAFFOLD FRAMES NOT CONFORMING TO PE DRAWINGS INDICATES FRAMES CONTINUOUS CONNECTION TO GROUND FRAMES,IN FI... | $0 | $0 | Sep 10, 2025 |
| Jul 1, 2025 | 39541884J | RESOLVE | CLASS - 1 | 4ECBS ISSUED, WARRANTING VIOLATION AGAINST CS LICENSE 0027121,FAILURE LOG UNSAFE VIOLATING CONDITIONS OF 1.SCAFFOLD A... | $2,500 | $0 | Nov 5, 2025 |
| Jul 1, 2025 | 39541881Y | RESOLVE | CLASS - 2 | SCAFFOLD NOT MAINTAINED PER SECTION OF CODE WITH MISSING GUARDRAIL SYSTEM EXP2 AND MISSING NETTING CORNER EXP2,3 AND ... | $0 | $0 | May 14, 2026 |
| May 24, 2025 | 39540621N | RESOLVE | CLASS - 2 | BC 3303.3 7 STORY NEW BUILDING, BUILDING APPROXIMATELY 9,965 SQUARE FEET. SITE CLOSED AND THERE WERE NO CONSTRUCTION ... | $0 | $0 | Feb 2, 2026 |
| May 19, 2025 | 39540351M | RESOLVE | CLASS - 2 | AT TIME OF INSPECTION OBSERVED: SIDEWALK SHED INSTALLED AT EXPOSURE # 1 VERTICAL COMPONENTS PLACED ON GREEN INFRASTRU... | $2,430 | $2,430 | Jan 11, 2027 |
| May 19, 2025 | 39540349N | RESOLVE | CLASS - 2 | BC 3301.13 SITE SAFETY PLAN. A TIME OF INSPECTION OBSERVED: MATERIAL DELIVERY IN PROGRESS, USING BOOM TRUCK, STORAGE ... | $625 | $625 | Feb 9, 2026 |
| Apr 1, 2025 | 39538581P | RESOLVE | CLASS - 2 | 15 RCNY 20-08 (B) AT TIME OF RESPONDING COMPLAINT OBSERVED: ACTIVE JOB SITE, DRIVING IN PILES IN PROGRESS, HYDRANT HA... | $2,500 | $0 | Dec 8, 2025 |
| Apr 1, 2025 | 39538580N | RESOLVE | CLASS - 2 | 3301.13.1 SITE SAFETY PLAN. AT TIME OF INSPECTION OBSERVED: FIRE WATER HOSE IN USE CROSSING SIDEWALK, INADEQUATE PROT... | $2,500 | $0 | Dec 8, 2025 |