DOB violations
Hope Gardens, Brooklyn • Block 03315 • Lot 0001
61 records
Violations issued by the Department of Buildings.
| Issued | Violation | Type | Category | Description | Disposed |
|---|---|---|---|---|---|
| Jun 23, 2024 | 00955 | EARCX-FAILURE TO SUBMIT EER NONE | V-DOB VIOLATION - ACTIVE | FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2023) | — |
| Jun 30, 2023 | 44903 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION | Jan 4, 2024 |
| Jun 30, 2023 | 24502 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION | Jan 4, 2024 |
| Jun 30, 2023 | 43609 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION | Jan 4, 2024 |
| Jun 30, 2023 | 24504 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION | Jan 4, 2024 |
| Jun 30, 2023 | 24503 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION | Jan 4, 2024 |
| Apr 22, 2023 | 00224 | EARCX-FAILURE TO SUBMIT EER NONE | V*-DOB VIOLATION - DISMISSED | FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2022) | May 12, 2023 |
| Aug 21, 2022 | 00832 | EARCX-FAILURE TO SUBMIT EER NONE | V*-DOB VIOLATION - DISMISSED | FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2021) | May 12, 2023 |
| Feb 22, 2022 | 01121 | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | V*-DOB VIOLATION - DISMISSED | FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 | Dec 12, 2023 |
| Feb 22, 2022 | 01120 | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | V-DOB VIOLATION - ACTIVE | FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 | — |
| Feb 22, 2022 | 01119 | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | V-DOB VIOLATION - ACTIVE | FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 | — |
| Dec 17, 2021 | 01306 | HVCAT5-NYCHA ELEVATOR PERIODIC INSPECTION/TEST ELEVATORREQUIRED | V*-DOB VIOLATION - DISMISSED | FAILURE TO PERFORM CATEGORY 5 INSPECTION | Oct 27, 2022 |
| Dec 17, 2021 | 01305 | HVCAT5-NYCHA ELEVATOR PERIODIC INSPECTION/TEST ELEVATORREQUIRED | V-DOB VIOLATION - ACTIVE | FAILURE TO PERFORM CATEGORY 5 INSPECTION | — |
| Nov 23, 2021 | 9027/711445 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | Jul 6, 2022 |
| Nov 23, 2021 | 9027/711447 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | Jul 6, 2022 |
| Nov 23, 2021 | 9027/711446 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | Jul 6, 2022 |
| Nov 22, 2021 | 9027/711444 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | Jul 6, 2022 |
| Nov 22, 2021 | 9027/711443 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | Jul 6, 2022 |
| Jun 20, 2021 | 00717 | EARCX-FAILURE TO SUBMIT EER NONE | V*-DOB VIOLATION - DISMISSED | FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2020) | Aug 6, 2021 |
| Oct 20, 2020 | 9027/691925 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | Jul 6, 2022 |
| Oct 20, 2020 | 9027/691926 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | Jul 6, 2022 |
| Oct 20, 2020 | 9027/691924 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | Jul 6, 2022 |
| Jun 29, 2020 | 00580 | EARCX-FAILURE TO SUBMIT EER NONE | V*-DOB VIOLATION - DISMISSED | FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2019) | Aug 6, 2021 |
| May 31, 2018 | 20020 | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | V-DOB VIOLATION - ACTIVE | FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017 | — |
| May 31, 2018 | 20069 | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | V*-DOB VIOLATION - DISMISSED | FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017 | Jun 22, 2018 |
| May 31, 2018 | 20072 | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | V*-DOB VIOLATION - DISMISSED | FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017 | Sep 22, 2020 |
| Mar 27, 2018 | 00243 | EARCX-FAILURE TO SUBMIT EER NONE | V*-DOB VIOLATION - DISMISSED | FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2017) | Apr 3, 2018 |
| Feb 16, 2017 | 10560 | EARCX-FAILURE TO SUBMIT EER NONE | V*-DOB VIOLATION - DISMISSED | FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2016) | Feb 16, 2017 |
| Jan 3, 2017 | 00071 | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | V*-DOB VIOLATION - DISMISSED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST | Mar 2, 2017 |
| Jan 3, 2017 | 00366 | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | V*-DOB VIOLATION - DISMISSED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST | Mar 6, 2019 |
| Jan 3, 2017 | 00367 | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | V*-DOB VIOLATION - DISMISSED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST | Mar 6, 2019 |
| Jan 3, 2017 | 00368 | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | V*-DOB VIOLATION - DISMISSED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST | Mar 14, 2019 |
| Jan 3, 2017 | 00369 | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | V*-DOB VIOLATION - DISMISSED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST | Mar 14, 2019 |
| Jan 3, 2017 | 00070 | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | V*-DOB VIOLATION - DISMISSED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST | Mar 2, 2017 |
| Jan 3, 2017 | 00365 | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | V*-DOB VIOLATION - DISMISSED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST | Mar 2, 2017 |
| Mar 14, 2016 | 00086 | EARCX-FAILURE TO SUBMIT EER NONE | V*-DOB VIOLATION - DISMISSED | FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 IN 2015 | Mar 28, 2016 |
| Dec 4, 2013 | HAZ74867 | LL11/98-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL | V-DOB VIOLATION - ACTIVE | CYCLE 7 UNSAFE REPORT FILED | — |
| Dec 4, 2013 | HAZ74866 | LL11/98-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL | V*-DOB VIOLATION - DISMISSED | CYCLE 7 UNSAFE REPORT FILED | Dec 16, 2015 |
| Dec 4, 2013 | HAZ74906 | LL11/98-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL | V*-DOB VIOLATION - DISMISSED | CYCLE 7 UNSAFE REPORT FILED | Nov 24, 2015 |
| Jan 31, 2013 | 20521 | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | V*-DOB VIOLATION - DISMISSED | FAILED TO FILE FISP CYCLE 7A TECHNICAL REPORT BY 02/21/2012 | Oct 27, 2014 |
| Jan 31, 2013 | 20424 | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | V*-DOB VIOLATION - DISMISSED | FAILED TO FILE FISP CYCLE 7A TECHNICAL REPORT BY 02/21/2012 | Oct 27, 2014 |
| Jan 31, 2013 | 20555 | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | V*-DOB VIOLATION - DISMISSED | FAILED TO FILE FISP CYCLE 7A TECHNICAL REPORT BY 02/21/2012 | Oct 27, 2014 |
| May 17, 2010 | HAZ2905 | LL11/98-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL | V*-DOB VIOLATION - DISMISSED | — | Nov 24, 2015 |
| Dec 31, 2009 | LBLVIO14158 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | — | Dec 12, 2016 |
| Dec 31, 2009 | 14158 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | — | — |
| Dec 31, 2009 | 14157 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | — | — |
| Nov 30, 2007 | NRF45741 | LL1198-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL | V*-DOB VIOLATION - DISMISSED | — | Dec 16, 2015 |
| Nov 30, 2007 | NRF45742 | LL1198-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL | V*-DOB VIOLATION - DISMISSED | — | Feb 3, 2016 |
| Nov 30, 2007 | NRF45743 | LL1198-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL | V*-DOB VIOLATION - DISMISSED | — | Nov 24, 2015 |
| Aug 8, 2002 | NRF53116 | L1198-LOCAL LAW 11/98 - FACADE FACADE REQUIRED | V*-DOB VIOLATION - DISMISSED | — | Feb 2, 2016 |