42 Tapscott Street, Brooklyn
Brooklyn • Block 03510 • Lot 0052 • Zip: 11212
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 3 days ago- Downtown Brooklyn 30 min 3 walking, 27 riding
- Fulton Street 37 min 3 walking, 34 riding
- Union Square 43 min 3 walking, 40 riding
- Grand Central 47 min 3 walking, 44 riding
- Penn Station 47 min 3 walking, 44 riding
- Times Square 48 min 3 walking, 45 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Subway
Railroad
Bus
Citi Bike
Activity
Sales, filings, permits and violations from every dataset, in one order.
2024
-
HPD violation Apr 17, 2024
Class A
(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION ...
2023
-
HPD violation Mar 30, 2023
Class A
(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION ...
2022
-
HPD violation Mar 9, 2022
Class A
(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION ...
2021
-
HPD violation Apr 19, 2021
Class A
(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION ...
2020
2008
-
DOB violation Feb 14, 2008
C-CONSTRUCTION OTHER OPTIONAL
FAILURE TO MAINTAIN BUILDING NOTED: AT 3RD FLOOR VARIOUS LOCATIONS OF EXTERIOR HALL, HALL KITCHEN LIVING ROOM BEDROOM...
2004
-
New Building
-
New Building
2003
2002
-
Non-Hazardous
FAILURE TO POST CONSTRACTORS SIGN AT TIME OF INSPECTON CONTRACTOR SIGN WAS NOT POSTED AT JOB SITE. REMEDY: PROVIDE CO...
-
Hazardous
FAILURE TO PROVIDE PROTECTION AT SIDES OF EXCAVATION AT TIME OF INSPECTION NO SHEETING SHORING OR GUARDRAIL WERE PROV...
-
Hazardous
FAILURE TO DO ADEQUATE HOUSEKEEPING AT TIME OF INSPECTION LARGE QUANTITY OF CONSTRUCTION DEBRIS (LUMBER 2 X 4'S, 4 X ...
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Registration Contracts
Contact information from multiple dwelling registrations
Building Permits
Owner information from Department of Buildings filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records