638 Howard Avenue, Brooklyn
Brooklyn • Block 03511 • Lot 0064 • Zip: 11212
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 1 day ago- Downtown Brooklyn 30 min 3 walking, 27 riding
- Fulton Street 37 min 3 walking, 34 riding
- Union Square 43 min 3 walking, 40 riding
- Grand Central 47 min 3 walking, 44 riding
- Penn Station 47 min 3 walking, 44 riding
- Times Square 48 min 3 walking, 45 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Subway
Railroad
Bus
Citi Bike
Places nearby
Activity
Sales, filings, permits and violations from every dataset, in one order.
2026
2025
-
CLASS - 1
NO SITE SAFTEY DRAWING; NOT TOOL BOX TALK; NO ORENTATION; NO PRESHIFT; NO SIDEWALK SHEED CHECKLIST NO COLD FORM STEEL...
-
CLASS - 1
LACK OF ACCESS TO SECOND DECK, NO REBA COVERS, NO FALL PROTECTION PROVIDED BY GC #611328
-
CLASS - 1
AT THE TIME OF INSPECTION AFTER REVIEWING DOCUMENT THE DISABILITY INSURRANCE SHOWED UP EXPIRED 12/12/2025 GC# 611328
-
CLASS - 2
OBSERVATION: AT EXPOSURE#1 TREES ARE NOT PROTECTED VIO FOR FAILURE TO CONFORM TO SITE SAFETY PLAN. CONFORM TO PLAN
-
CLASS - 2
OBSERVATION: AT EXPOSURE#1 TEMPORARY CONSTRUCTION (FENCE) EQUIPMENT EXTENDING 5' UPON MY REVIEW DRAWING SHOW FENCE WI...
2024
-
New Building
AFFORDABLE HOUSING DEVELOPMENT HUB CONSULTATION MEETING ACCEPTED 07/07/2021. NEW BUILDING FOR 4-STORY WITH VAULT 4 AP...
2023
2022
-
Alteration Type III
BUILDER PAVEMENT PLAN IN CONJUNCTION WITH NEW BUILDING, TOTAL FRONTAGE IS 25 FEET
2008
-
Alteration Type III
BUILDERS PAVING PLAN (BPP) FILING TOTAL 25' FRONTAGE FOR BLOCK 3511 LOTS 64 & 164 INCONJUNCTION WITH NB APPLICATI...
-
New Building
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Building Permits
Owner information from Department of Buildings filings
Recent Building Permits
Owner information from recent DOB NOW filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records