Maintenance code violations
183 Dumont Avenue, Brooklyn • Block 03557 • Lot 0002
60 records
HPD grades a violation A for non-hazardous through C for immediately hazardous.
| Issued | Class | Status | Violation | Apartment | Correct by |
|---|---|---|---|---|---|
| Jul 30, 2007 | B | VIOLATION CLOSED | SECTION 27-2005, 2007 ADM CODE AND DEPT. RULES AND REGULATIONS. REMOVE THE ENCUMBRANCE OBSTRUCTING EGRESS FROM FIRE E... | 3R | Sep 3, 2007 |
| Jul 30, 2007 | B | VIOLATION CLOSED | SECTION 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT THE SINK IN THE KITCHEN LOCATED AT APT 3R, 3rd ... | 3R | Sep 3, 2007 |
| Jul 30, 2007 | B | VIOLATION CLOSED | SECTION 27-2018 ADM CODE ABATE THE NUISANCE CONSISTING OF VERMIN MICE IN THE ENTIRE APARTMENT LOCATED AT APT 3R, 3rd ... | 3R | Sep 3, 2007 |
| Jul 30, 2007 | B | VIOLATION CLOSED | SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING I... | 3R | Sep 3, 2007 |
| Jul 30, 2007 | B | VIOLATION CLOSED | SECTION 27-2018 ADM CODE ABATE THE NUISANCE CONSISTING OF VERMIN ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 3R, 3... | 3R | Sep 3, 2007 |
| Jul 30, 2007 | B | VIOLATION CLOSED | SECTION 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR THAT IS DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT AP... | 3R | Sep 3, 2007 |
| Jul 30, 2007 | B | VIOLATION CLOSED | SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING I... | 3R | Sep 3, 2007 |
| Jul 30, 2007 | B | VIOLATION CLOSED | SECTION 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE 2nd ROOM FROM EAST AT NORTH LOC... | 3R | Sep 3, 2007 |
| Jul 30, 2007 | B | VIOLATION CLOSED | SECTION 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE 1st ROOM FROM EAST AT NORTH LOC... | 3R | Sep 3, 2007 |
| Jul 30, 2007 | B | VIOLATION CLOSED | SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE EAST WALL... | 3R | Sep 3, 2007 |