Betsy Head Park, Brooklyn
Brooklyn • Block 03570 • Lot 0001 • Zip: 11212
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated about 23 hours ago- Downtown Brooklyn 30 min 3 walking, 27 riding
- Fulton Street 37 min 3 walking, 34 riding
- Union Square 43 min 3 walking, 40 riding
- Grand Central 47 min 3 walking, 44 riding
- Penn Station 47 min 3 walking, 44 riding
- Times Square 48 min 3 walking, 45 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Subway
Railroad
Bus
Citi Bike
Activity
Sales, filings, permits and violations from every dataset, in one order.
2025
-
DOB violation Nov 14, 2025
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
-
DOB violation Nov 14, 2025
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
2024
-
DOB violation Sep 23, 2024
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
-
DOB violation Sep 23, 2024
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
2023
-
Alteration Type II
FILING RENOVATION TO EXISTING COMFORT STATION AND UTILITY BUILDING WITHIN BETSY HEAD PARK AS PER PLAN SUBMITTED HEREW...
-
DOB violation Jun 30, 2023
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
-
DOB violation Jun 30, 2023
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
2022
2021
-
Alteration Type II
EMPTY,PURGE,CLEAN,CLOSE IN PLACE ONE(1) 5,000-GALLON HEATING OIL AST & REMOVE ASSOCIATED SUPPLY, RETURN,FILL &...
2020
-
Alteration Type II
STRUCTURAL WORK RELATED TO NEW SPORTS FIELD LIGHT FOUNDATIONS AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRE...
-
CLASS - 1
THE ONLY ELEVATOR IN BUILDING(OR SECTION OF BUILDING) OUT OF SERVICE. UPON INSPECTION, THE DEVICE IS FOUND TO BE OUT-...
-
CLASS - 2
AT TIME OF INSPECTION,OBSERVED ONGOING CONSTRUCTION ACTIVITIES CONTRARY TO GOVERNOR'S EXCECUTIVE ORDER#202.6;202.8;20...
2018
-
Alteration Type II
INSTALL NEW GAS SERVICE TO BUILDING & ASSOCIATED PIPING. INSTALL NEW (2)DUAL-FUEL BURNER & (2)GAS-TRAIN ONE T...
2015
-
CLASS - 2
B254. 5B/24B/32A/34B/50/50A/50B/50C/50D/50E/50F/50G/50H/50I/50J/ 50-DEAD BIRD IN BOILER ROOM. 50A-LEAKING & CORRODED ...
2014
-
Alteration Type III
FILING FOR SHED TO BE USED AS ACCESSORY TO THE PLAYGROUND AT BESTY HEAD PARK.
2013
-
CLASS - 2
12Q03,12B07,60B07,60Q03,61Q03,61G11,42G11,40M07,69M07,99M05,48T05,71X10,77B11. 12,60-PROVIDE BETTER GAURDED LIGHTING;...
2000
-
Alteration Type II
BOILER REPLACEMENT & HEATING SYSTEM. NO CHANGE IN USE, EGRESS OR OCCUPAN CY.
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Building Permits
Owner information from Department of Buildings filings
Recent Building Permits
Owner information from recent DOB NOW filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records