220 Dumont Avenue, Brooklyn
Brooklyn • Block 03573 • Lot 0001 • Zip: 11212
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 3 days ago- Downtown Brooklyn 30 min 3 walking, 27 riding
- Fulton Street 37 min 3 walking, 34 riding
- Union Square 43 min 3 walking, 40 riding
- Grand Central 47 min 3 walking, 44 riding
- Penn Station 47 min 3 walking, 44 riding
- Times Square 48 min 3 walking, 45 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Subway
Railroad
Bus
Citi Bike
Activity
Sales, filings, permits and violations from every dataset, in one order.
2026
-
HPD violation Jul 16, 2026
Class C
HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT C, 1st STOR...
-
HPD violation Jun 23, 2026
Class A
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALL WALLS AND CEILINGS ...
-
HPD violation Jun 23, 2026
Class C
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING AND WALLS GREATER THA...
-
HPD violation Jun 23, 2026
Class A
§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION ENTRANCE DOOR FROM THE PATIO IN THE 1st ROOM FROM ...
-
HPD violation Jun 23, 2026
Class C
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CL...
-
HPD violation Jun 23, 2026
Class B
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRICAL OUTLET AT EAST WALL IN THE 1st ROOM FROM...
2025
2024
2023
2022
-
Alteration Type III
BUILDER'S PAVEMENT PLAN IN CONJUNCTION WITH NB# 321594217
2021
-
Alteration Type II
APPLICATION FILED TO DRILL HOLES FOR GEOTHERMAL WELLS. CONNECTIONS TO BUILDING SYSTEMS TO BE FILED SEPARATELY. NO CHA...
2019
-
Subdivision Improved
THIS IS A NO WORK APPLICATION TO APPORTION TAX LOT 1 INTO TWO (2) TAX LOTS, 1 & 70. NO WORK, AND NO CHANGE IN USE...
2018
-
Alteration Type II
EXTERIOR RENOVATION OF BUILDING WHICH INCLUDES NEW PANELS ON FACADE INCLUDING THE INSTALLATION OF ROOFTOP SOLAR PANELS.
2017
-
Alteration Type II
PLUMBING AND BOILER WORK AS SHOWN ON PLANS FILED HEREWITH.
-
DOB violation Jan 25, 2017
AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2016
-
Alteration Type II
EXTERIOR RENOVATION OF BUILDING WHICH INCLUDES NEW PANELS ON FACADE
-
CLASS - 1
FAILURE TO MAINTAIN BLDG IN A CODE COMPLIANT MANNER DEFECTS NOTED AT ROOF ARE A RESULT OF ALT-2 JOB #340261950 WHICH ...
-
DOB violation Jun 1, 2016
EARCX-FAILURE TO SUBMIT EER NONE
FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS(2015)
-
DOB violation May 14, 2016
EARCX-FAILURE TO SUBMIT EER NONE
FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 IN 2014
2014
2013
-
DOB violation Mar 1, 2013
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT
-
DOB violation Mar 1, 2013
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT
-
DOB violation Mar 1, 2013
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Registration Contracts
Contact information from multiple dwelling registrations
Building Permits
Owner information from Department of Buildings filings
Recent Building Permits
Owner information from recent DOB NOW filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records